Workflow
港—产—园模式
icon
Search documents
通江达海链全球
Jing Ji Ri Bao· 2026-01-07 21:18
Core Insights - The Western Land-Sea New Corridor is significantly enhancing the economic and social development along its route, with the Guangxi Beibu Gulf Port expected to exceed an annual container throughput of 10 million TEUs by December 30, 2025 [2] Group 1: Infrastructure Development - The Pinglu Canal Youth Hub is a key project that facilitates seamless connections between river, rail, and sea transport, designed to be the shortest and most economical route from Guangxi and Southwest China to ASEAN [3] - The construction of the Pinglu Canal incorporates advanced digital technologies, including a monitoring system based on Beidou, cloud computing, and artificial intelligence, enabling real-time data collection and analysis [4] - Upgrades at the Qinzhou Automated Container Terminal include a total berth length of 991 meters, allowing two 200,000-ton container ships to dock simultaneously, with an expected annual throughput increase of 400,000 TEUs [5] Group 2: Operational Efficiency - The integration of physical and digital systems at the Qinzhou terminal has reduced the average transfer time for rail-sea intermodal containers from 3 hours to 1.5 hours, achieving seamless connections [6] - The terminal's U-shaped roadway design allows for flexible and efficient operations, maintaining an average truck turnaround time of under 15 minutes by 2025 [7] - The introduction of a real-time data interaction platform between the port and railway systems has reduced information exchange delays from 30 minutes to under 1 minute, enhancing bulk transport capabilities [7] Group 3: Innovative Business Models - The establishment of the "port-industry-park" model in the China-Malaysia Qinzhou Industrial Park facilitates direct container shipping between Qinzhou and Kuantan, promoting cross-border industrial chain development [9] - The implementation of a "split order model" for customs inspection at the Pingxiang Comprehensive Bonded Zone has improved inspection efficiency by over 30%, addressing congestion issues in traditional inspection processes [10] - The continuous development of the Western Land-Sea New Corridor is fostering global trade by enhancing logistics efficiency and encouraging industrial clustering [10]
北部湾港—文莱摩拉港航线织密
Guang Xi Ri Bao· 2025-12-11 16:03
Core Viewpoint - The upgrade of the North Bay Port to Brunei Muara Port direct shipping route enhances trade efficiency and connectivity between China and Brunei, facilitating the export of various products including cement, fruits, and fishery products [1] Group 1: Shipping Route Upgrade - The "SITC INCHON" vessel departed from North Bay Port carrying nearly 3,000 tons of Yufeng cement to Brunei Muara Port, marking the upgrade of the North Bay Port-Vietnam-Malaysia direct shipping route (CVM2) [1] - The addition of Brunei Muara Port to the shipping route reduces transit time from North Bay Port to Brunei Muara Port to just 9-10 days, significantly improving efficiency [1] Group 2: Trade and Economic Impact - The stable operation of this shipping route is expected to boost trade in fruits, fishery products, and aluminum between China and Brunei, supporting the development of the "port-industry-park" model in Brunei [1] - The cement being shipped will be used for the expansion project of the Brunei Muara Port container terminal, which is currently in a critical construction phase [1] Group 3: Supply Chain Management - North Bay Port Group has strengthened internal collaboration by forming a specialized business team to ensure the smooth supply chain for Yufeng cement, including handling Brunei's import qualifications and optimizing logistics [1] - The company aims to align "Yufeng standards" with "Brunei needs," creating an integrated supply chain that encompasses cement production, logistics transportation, shipping route operation, and market expansion [1]
【东盟专线】广西北部湾港—文莱摩拉港航线织密
Zhong Guo Xin Wen Wang· 2025-12-05 08:19
Group 1 - Shanghai Xinhai Feng Container Transportation Co., Ltd. has upgraded the Guangxi Beibu Gulf Port-Vietnam-Malaysia direct shipping route (CVM2) by adding Brunei Muara Port, enhancing the connectivity of the shipping line [1][3] - The newly launched route will allow goods to travel from Beibu Gulf Port in Qinzhou to Brunei Muara Port in approximately 10 days, facilitating trade [3] - The first shipment on this route included nearly 3,000 tons of cement destined for the expansion project of the container terminal at Muara Port, which is crucial for the project's successful completion [3] Group 2 - The expansion project at Muara Port is set to officially commence in August 2024 and is expected to be completed by the end of August 2027, with significant construction activities currently underway [3] - The project aims to enhance the port's trade zone development, improve cargo handling and logistics capabilities, and strengthen Brunei's competitiveness as a gateway to the ASEAN eastern growth area [3] - The stable operation of the new shipping route is anticipated to boost trade between China and Brunei, particularly in fruits, fish products, and aluminum products, supporting the "port-industry-park" model in Brunei [4]