Workflow
电力供应
icon
Search documents
安阳今夏用电负荷再创新高 电力供应平稳
Sou Hu Cai Jing· 2025-08-06 08:55
Core Insights - The electricity load in Anyang reached 5.119 million kilowatts on August 5, with cooling load contributing approximately 1.8 million kilowatts, marking a 2.1% increase from the previous peak in July and a 4.7% increase from historical maximum loads [4] - The power supply and grid operation remained stable despite the high load, indicating effective management and preparedness by the local power supply company [4][6] Group 1: Electricity Load and Management - Anyang's electricity load increased by 105,000 kilowatts, or 2.1%, compared to the previous peak, and by 230,000 kilowatts, or 4.7%, compared to historical maximums [4] - The local power supply company has implemented a high-temperature warning system and adjusted its response levels based on weather changes to ensure grid stability [6][8] - Six summer projects were completed, adding 92.7 kilometers of new lines and increasing supply capacity by 315,000 kilowatts [6] Group 2: Emergency Preparedness and Customer Service - The company has established a comprehensive emergency response network with 1,364 repair personnel and 134 repair teams ready to respond to outages [6] - Customer service measures have been enhanced, prioritizing the needs of vulnerable groups such as the elderly and children during power outages [6][8] - The company is focused on maintaining the safety of the power grid and ensuring reliable electricity supply for economic development and public welfare [8]
95598电话与在线服务量双双创年内新高
Core Viewpoint - The National Grid Customer Service Center is experiencing record-high service demands due to extreme weather conditions, including heavy rainfall and high temperatures, leading to increased electricity load across multiple regions [1][3]. Group 1: Service Demand and Performance - On August 4, the 95598 hotline received 281,700 calls, with 183,400 requests for human service and 257,200 online service accesses, indicating a significant increase in service volume [1]. - The customer service center has implemented a comprehensive service guarantee plan for the summer peak season, focusing on resource management and timely responses to customer needs, especially in disaster-affected areas [3]. Group 2: Operational Measures - The center has strengthened duty management and organized staff to engage directly with customer calls, ensuring a better understanding of customer needs and operational processes [5]. - Emergency response measures have been activated, with 708 personnel participating in emergency repairs and service adjustments in response to severe weather conditions in northern regions [5][6]. Group 3: Future Plans - The National Grid Customer Service Center will continue to monitor extreme weather developments and enhance coordination with provincial and municipal companies to ensure effective service delivery [6].
重庆加快超充布局 上半年接入超充站1468座
Group 1 - In the first half of 2023, Chongqing has made significant progress in the electric vehicle charging sector, with the digital charging platform connecting over 1,468 supercharging stations and 2,270 supercharging piles, resulting in a charging volume of 8,337.33 million kWh, a 35-fold year-on-year increase, contributing to green travel and efficient energy use [1] - Supercharging piles accounted for only 4.45% of the total charging piles in the city but contributed 14.06% of the total charging volume, demonstrating a charging efficiency significantly higher than that of regular piles, with daily average charging volume per supercharging pile being 182% higher than the city average [1] Group 2 - Chongqing is optimizing the layout of supercharging stations, with each station equipped with at least one supercharging pile, aiming to create a "1-kilometer supercharging circle" in urban areas to alleviate charging anxiety for electric vehicle users [2] - The Yubei District's supercharging station covers over 8,000 square meters and is equipped with 51 smart charging piles, allowing simultaneous charging for 62 vehicles, providing a supercharging experience that enables 400 kilometers of travel in just 10 minutes [2] - The station also features a dedicated bus charging area for over 30 electric buses and a dual-chamber smart battery swap platform, serving up to 800 vehicle charging sessions daily, ensuring quick charging for taxis and ride-hailing vehicles [2] Group 3 - The digital charging platform, launched on August 28, 2024, tracks the construction goals, progress, and completion rates of supercharging facilities across the city, enhancing the management of charging infrastructure and promoting efficient energy allocation through V2G interactions [3] - The platform benefits from the stable energy supply provided by the Hami-Chongqing ±800 kV UHVDC transmission project, which supports the expansion of the supercharging network [3] Group 4 - Future plans include accelerating the coverage of supercharging stations in highway service areas and tourist attractions to support long-distance travel, as well as extending supercharging facilities to rural areas to promote green travel [4] - The company aims to ensure that all electric vehicles and charging facilities are integrated into the digital charging platform, enhancing smart charging services for citizens [4]
国家电网用电负荷连续三天创历史新高
Core Insights - The national power grid has experienced record-high electricity loads due to extreme heat and humidity, with the maximum load reaching 1.233 billion kilowatts, an increase of 53 million kilowatts compared to last year's peak of 1.180 billion kilowatts [1] - The power load is expected to remain above 1.2 billion kilowatts in the coming days, but a temporary decrease is anticipated due to rainfall and cooling in various regions [1] - The national grid has seen multiple record highs this summer, with six regional grids achieving 16 new peaks and 17 provincial grids reaching 50 new highs [1] Industry Response - In response to the electricity peak, the national grid is optimizing resource allocation and maximizing the use of ultra-high voltage transmission capabilities, with cross-regional power transmission reaching up to 225 million kilowatts [1] - The national grid is closely monitoring weather changes and balancing supply and demand, ensuring that coal-fired power plants operate at full capacity and maximizing the output from gas, hydropower, and energy storage [2] - The focus remains on maintaining the safety and reliability of the power supply, particularly for residential electricity needs [2]
广东各地各部门扎实做好防汛工作
Group 1 - Guangdong has been experiencing continuous heavy rainfall, prompting various departments to implement preemptive measures for flood prevention, including 13 city-level and 40 county-level emergency meetings [1] - The provincial meteorological bureau, in collaboration with multiple departments, issued warnings and alerts that reached approximately 210 million people across the province [1] - The provincial water resources department issued 93 flood disaster warnings and sent out over 10,628 warning messages [1] Group 2 - Local governments have actively deployed defense measures, with Huizhou dispatching 914 personnel for inspections and emergency drainage, while Dongguan mobilized 24,655 personnel for hazard checks [2] - Heavy rainfall has caused water-related hazards, with emergency services responding to 50 incidents and successfully evacuating 18 individuals trapped by rising seawater [2] - Road traffic has been disrupted due to landslides, but emergency teams have cleared blocked roads, ensuring safe evacuation of vehicles [2] Group 3 - The railway department has adjusted train operations dynamically in response to rainfall, implementing safety measures such as suspensions and speed limits in heavily affected areas [3] - The Guangdong power grid company has enhanced monitoring and repair efforts, restoring power to over 70% of the 319,000 affected households by August 5 [3]
【迎峰度夏电力保供】国网山西原平市供电公司:“三加强”筑牢安全线 确保电网稳定运行
Core Viewpoint - The company is actively preparing for the summer peak and flood season by conducting thorough inspections and implementing safety measures to ensure stable electricity supply during adverse weather conditions [1][3][4] Group 1: Weather Impact and Preparedness - The company organized a meeting to address the expected heavy rainfall and severe weather conditions from August 3 to 5, as forecasted by the Shanxi Meteorological Bureau [1] - The company is taking the weather warnings seriously, emphasizing the need for proactive inspections of power lines and substations to monitor operational conditions [1][3] Group 2: Safety Measures and Actions - A special inspection team was formed, consisting of party members, technical professionals, and young workers, to conduct comprehensive safety checks on substations, transmission lines, and distribution facilities [3] - The team focused on areas vulnerable to flooding and erosion, ensuring the stability of pole foundations, cable trenches, and drainage systems [3][4] - As of August 5, the company completed inspections of 10 substations, 35 low-lying pole areas, and 25 ring network cabinets, addressing identified safety issues and documenting them for future reference [4] Group 3: Ongoing Monitoring and Future Plans - The company plans to continue enhancing equipment inspections and maintenance while closely monitoring weather changes to ensure reliable electricity supply during the summer peak and flood season [4]
国网晋中供电分公司:积极走访客户 保障供电安全
Core Viewpoint - The importance of safe electricity usage for industrial enterprises is increasingly highlighted as summer electricity load continues to rise, prompting proactive measures from the Jinzhong Power Supply Company to ensure reliable power supply during peak demand periods [1] Group 1: Actions Taken by the Company - The company organized teams to conduct comprehensive inspections of key enterprises, including the Beishan Coal Mine, focusing on specialized substations, main supply lines, and critical distribution facilities to identify potential hazards and ensure equipment operates healthily [1] - On-site guidance was provided to optimize electricity usage plans tailored to the production characteristics and high-load electricity demands of enterprises, assisting in energy conservation and cost reduction [1] - A 24-hour emergency contact mechanism was established to ensure rapid response and effective handling of unexpected situations, providing robust power support for safe production [1] Group 2: Future Plans - The company plans to enhance real-time monitoring of power supply equipment for key enterprises in the jurisdiction, increasing the frequency of special inspections and protective measures [1] - There will be a deepening of collaborative mechanisms, including joint emergency drills with enterprises to improve coordinated response capabilities, thereby strengthening the electricity safety defense line during peak summer demand [1]
国网塔什库尔干供电公司:提前布防,筑牢嘉年华电力屏障
Group 1 - The 2025 "Pamir Voice" Music Carnival in Kashgar, Xinjiang, will take place from August 7 to 13, featuring a series of celebratory events [2][3] - The State Grid Tashkurgan Power Supply Company has initiated a comprehensive safety inspection to ensure reliable power supply for the event [1][3] - The company has developed a detailed power supply plan, outlining responsibilities and measures for power supply during the event [3][5] Group 2 - The company has organized a service team to inspect key locations and cultural centers for potential electrical hazards, ensuring stable power supply during the event [3][5] - A thorough inspection of power facilities, including transformers and distribution cabinets, has been conducted to eliminate safety risks [3][5] - The company emphasizes its commitment to enhancing power supply services and emergency response capabilities to support major events and local economic development [5]
广东暴雨72小时:房屋受损,交通、电力大受影响
第一财经· 2025-08-06 07:17
2025.08. 06 而就在前一天,8月5日,东莞市民向记者发来的视频中,樟木头镇原本宁静的别墅群,此刻已变成 了一片泽国。积水淹至前院大门的腰部,大院里的车辆如同无助的小船,在水中漂浮,动弹不得。在 个别菜市场里,积水深达成人膝盖,商贩们望着被水淹没的摊位,满脸无奈。 暴雨不仅让居民生活陷入困境,还让交通陷入瘫痪。8月5日当天,东莞市塘厦镇大岭古隧道出现严 重积水,积水深度近两米。一辆灰色轿车驶入隧道后被困水中,车内司机难以脱困,情况危急。幸运 的是,多名群众与民警迅速展开紧急营救,成功将司机救出。 东莞并非个例。连日来,广东多个城市都遭受着这轮罕见强降雨的猛烈袭击。8月5日晚,来自惠州 发布的消息显示,惠州市三防指挥部决定于8月5日20时将防汛Ⅱ级应急响应提升为防汛Ⅰ级应急响 应。 在防汛防旱防风防冻应急预案中,Ⅰ级应急响应代表最高级别的应急响应机制,针对最严重、最紧急 的灾害情形启动,需调动最高规格的资源与力量进行应对。 东莞市茶山镇街景一角 受访者供图 本文字数:2358,阅读时长大约4分钟 作者 | 第一财经 南英 作为广东一家屋顶光伏电站建设与维护企业的负责人,李先生这几天不停地连轴转,在惠州、 ...
广东暴雨72小时:房屋受损,交通、电力大受影响
Di Yi Cai Jing· 2025-08-06 06:33
气象部门预计,待到8月7日,随着冷涡进一步远离,广东本轮强降水过程将结束。 作为广东一家屋顶光伏电站建设与维护企业的负责人,李先生这几天不停地连轴转,在惠州、东莞和广州之间来回奔波,为用户维护电站。每到一处,他都 能看到令人揪心的场景:光是他们电站所在的区域,就有几十户居民家中被水淹没,水深竟达一米之高。 受损严重 8月6日上午,李先生来到东莞市茶山镇茶山圩社区,维护公司所负责的屋顶光伏电站。该社区临江而建,江水因暴雨而汹涌上涨。社区工作人员和居民们正 紧急垒砌防水沙包,试图阻挡即将涌入的洪水。"好多居民家里都被水淹了。"李先生对第一财经记者说。 一场罕见的强降水从8月3日左右开始集中侵袭广东省多个地区,给当地经济生活造成严重损害。 而就在前一天,8月5日,东莞市民向记者发来的视频中,樟木头镇原本宁静的别墅群,此刻已变成了一片泽国。积水淹至前院大门的腰部,大院里的车辆如 同无助的小船,在水中漂浮,动弹不得。在个别菜市场里,积水深达成人膝盖,商贩们望着被水淹没的摊位,满脸无奈。 暴雨不仅让居民生活陷入困境,还让交通陷入瘫痪。8月5日当天,东莞市塘厦镇大岭古隧道出现严重积水,积水深度近两米。一辆灰色轿车驶入隧道后 ...