水利工程
Search documents
为了“更大的成都”,四川新建一个超级工程
3 6 Ke· 2025-11-24 02:52
一个非比寻常的信号。 为了"强省会"战略,四川省开建了一个投资额高达575亿元的超级引水工程,叫做"引大济岷",该工程的主要目的就是给成都平原引水。 575亿元是什么概念,比深中通道还高了100多亿,将其视为四川版的"深中通道"毫不为过。 分析认为,引水成功之后,成都继续做大做强,就没有后顾之忧了。 图片来自"智谷趋势" 四川为什么要新建这个引水工程? 这里涉及到一个冷知识,那就是:成都缺水。 岷江是成都主要的水源地,但同时经常给成都带来水患。战国时期,秦国派蜀郡太守李冰父子修建都江堰,用"鱼嘴分流"的方式将喜怒无常的岷江分成两 条河,一条河走灌溉用水(内江),一条河用来泄洪(外江)。 后来的事情大家都知道了,都江堰建成之后,成都平原变身一个"水旱从人、不知饥馑"的风水宝地。 然而,经过两千多年的发展,成都平原的人口和经济规模,远超战国时期,仅都江堰一个水源地是不够的。 01. 四川要花575亿,为成都引水 11月7日,一个叫做"引大济岷"的工程建设动员大会在四川雅安天全县举行。该工程工期8年,投资额超过575亿元,是四川有史以来投资最大、线路最长 的引水工程,堪称新时代的"都江堰"。 "引大济岷"是什么意思 ...
滇中引水攻坚克难实现新突破
Jing Ji Ri Bao· 2025-11-22 21:55
Core Points - The Yunnan Central Water Diversion Project is the largest water resource allocation project in Southwest China, with an investment of significant scale and expected to benefit over 11 million people across 36 counties [1][7] - The project includes the construction of the world's largest underground pump station and the largest water pumps in Asia, with a total installed capacity of 480 megawatts [1][7] - The project has faced numerous challenges, particularly in the construction of tunnels through complex geological conditions, requiring innovative engineering solutions [2][4][6] Project Overview - The first phase of the Yunnan Central Water Diversion Project consists of a main water conveyance line of 664 kilometers, with over 92% of it being tunnels [2][7] - The project began construction in October 2018 and has made significant progress, with 94% of the main water conveyance line completed as of mid-October [7] - The second phase will distribute the water to key areas, including major lakes and cities in Yunnan province [7] Engineering Challenges - The construction of the Xianglu Mountain tunnel, which is 63.1 kilometers long and located over 1,000 meters underground, presents significant geological challenges [2][3] - The project team has implemented various advanced support measures to address risks such as water and mud bursts during construction [2][4] - Innovative technologies, including geological radar and infrared water detection, have been employed to monitor and manage geological risks [4][5][6] Research and Innovation - A research group has been established to study the deformation mechanisms and control technologies related to the sandy limestone encountered in the tunnels, resulting in several patents [5][6] - The project emphasizes the importance of innovation in overcoming technical difficulties, with a focus on advanced construction methods [6][7]
中国之声一线调研丨水利工程开放 如何以“平急两用”之策盘活城市滨水空间?
Yang Guang Wang· 2025-11-22 02:59
Core Insights - The "Yongding River Collective" has become a popular new landmark in Beijing, combining urban life and nature while serving as part of the Yongding River Lu San Section Comprehensive Improvement Project, which aims to enhance flood resilience and create high-quality waterfront spaces [1][4][11] Group 1: Project Overview - The Yongding River Lu San Section Comprehensive Improvement Project is a post-disaster recovery initiative following the "23·7" flood, focusing on both flood safety and the development of surrounding areas [4][12] - The project spans 17 kilometers, with a 1.6-kilometer demonstration section where the "Yongding River Collective" is located, connecting Shijingshan and the Yongding River [8][12] Group 2: Design and Functionality - The design incorporates a "dual-use" strategy for the levee, allowing for emergency vehicle access during floods while also serving as a recreational space for the public [6][10] - The project emphasizes ecological considerations, aiming to restore the river to a "flowing, green, clean, and safe" state, while minimizing artificial structures to maintain natural aesthetics [10][11] Group 3: Community Impact - The "Yongding River Collective" has significantly increased foot traffic to the area, attracting families and enhancing the local economy [2][11] - Future plans include expanding the project to further enhance the waterfront experience and integrate more cultural and commercial activities [11][12]
桂中百万亩农田告别“望天渴” 壮族青年返乡逐梦田野
Zhong Guo Xin Wen Wang· 2025-11-21 09:11
桂中百万亩农田告别"望天渴" 壮族青年返乡逐梦田野 图为兴宾区水利局在古炼村打出的水井。刘锦莲 摄 水源的保障激发了村民的发展热情。壮族青年蒋永诚就是其中之一。他曾远赴广东打工,因家中老人需 要照顾而返乡务农。看到村里不少田地因年轻人外出而闲置,他主动上门与乡亲们协商,将零散田地集 中起来规模化种植。 中新网来宾11月21日电 (何州 韦兰)初冬时节,走进广西来宾市兴宾区三五镇古灯村委古炼村,村民覃 广看着喷涌而出的地下水,笑着说:"以后再也不用半夜守水,更不用挑水吃了。如今井水渠水'双保 险',心里特别踏实。" 古炼村这个美丽的壮族山村坐落在丘陵地带,300多亩梯田如金色壮锦铺展在山间。然而数百年来,村 民耕作全靠自然降雨,一遇干旱年份,良田便面临抛荒困境。 转机来自兴宾区水利局的精准施策。在深入勘查后,技术人员成功找到地下水源,仅用两天时间就打出 一口每小时出水量达50吨的水井,彻底解决了该村的灌溉和人畜饮水难题。 "以前种植最头疼的就是缺水,现在有了稳定水源,我感觉回村发展的决定做对了。"蒋永诚说,他计划 将水稻种植面积扩大到50亩以上,真正成为一名种粮大户。"我相信,有了水,乡村振兴会吸引更多年 轻人 ...
调研速递|深水规院接受全景路演等广大投资者调研 聚焦水利水务场景智慧赋能与AI应用
Xin Lang Cai Jing· 2025-11-20 11:28
深圳市水务规划设计院股份有限公司(简称"深水规院")于2025年11月20日通过全景网互动平台参与 2025年度深圳辖区上市公司投资者网上集体接待日活动,与广大投资者就公司业务发展等话题展开交 流。活动中,公司明确了在新兴产业领域的发展方向,聚焦水利水务行业场景的智慧化升级及AI技术 应用。 调研基本信息 投资者关系活动类别为"其他(2025年度深圳辖区上市公司投资者网上集体接待日活动)",活动时间为 2025年11月20日(周四)下午14:30-17:00,地点设为全景网"投资者关系互动平 台"(https://ir.p5w.net)。参与单位为通过"全景路演"网站远程参与的广大投资者,公司接待团队包括 副总经理兼董事会秘书李战、财务负责人雷冬梅、董事李文坤及独立董事李志平、郭晋龙、曾繁军等。 本次活动附件清单无特殊内容,相关信息已于2025年11月20日通过公告披露。 声明:市场有风险,投资需谨慎。 本文为AI大模型基于第三方数据库自动发布,任何在本文出现的信 息(包括但不限于个股、评论、预测、图表、指标、理论、任何形式的表述等)均只作为参考,不构成 个人投资建议。受限于第三方数据库质量等问题,我们无法对 ...
我为群众办实事丨确保农村供水饮水安全
Zhong Yang Ji Wei Guo Jia Jian Wei Wang Zhan· 2025-11-20 00:30
Group 1 - The core issue identified is the insufficient water supply in Wanzhong Town, Wanjing Village, due to low water pressure in the supply network during dry seasons, affecting over 3,000 residents [1] - The county's disciplinary inspection and supervision commission has prioritized the improvement of rural water supply capabilities and has taken action against corruption within the water management sector, resulting in the investigation and punishment of 11 individuals [1] - A total of 1.64 million yuan has been allocated for the renovation of the water supply network to address the water scarcity issue in the village [1] Group 2 - The county has established a four-level collaborative mechanism involving enterprises, towns, villages, and associations to address issues related to rural water supply, identifying 59 problems and rectifying 54 of them [2] - Innovative smart supervision has been implemented to provide timely warnings and quick resolutions for water quality issues, resolving 66 problems to ensure safe drinking water [2] - Over 12.8 million yuan has been invested in constructing 11 drought-resistant water source projects, benefiting more than 87,000 residents [2]
中国电建(601669) - 中国电力建设股份有限公司2025年1月至10月主要经营情况公告
2025-11-19 09:30
证券代码:601669 股票简称:中国电建 公告编号:临 2025-070 中国电力建设股份有限公司 2025 年 1 月至 10 月主要经营情况公告 本公司董事会及全体董事保证本公告内容不存在任何虚假记载、误导性陈述或 者重大遗漏,并对其内容的真实性、准确性和完整性承担法律责任。 现将中国电力建设股份有限公司2025年1月至10月主要经营情况公布如下,供 投资者参阅。 一、按业务类型统计 | 业务类型 | 新签项目数量(个) | 新签合同金额 | 同比增减 | | --- | --- | --- | --- | | 能源电力 | 4284 | 6195.19 | 7.62% | | 水电 | 845 | 1585.32 | 48.18% | | 其中:抽水蓄能 | 442 | 738.16 | 0.07% | | 风电 | 962 | 1915.59 | 39.74% | | 太阳能发电 | 812 | 1436.93 | -34.80% | | 火电 | 444 | 381.21 | -42.24% | | 新型储能 | 153 | 380.08 | / | | 其他 | 1068 | 496.07 | ...
百里长堤写史诗——运城市以姚暹渠、常硝渠防洪能力提升改造工程提升城市韧性
Xin Lang Cai Jing· 2025-11-19 09:13
Core Viewpoint - The enhancement of flood control capabilities in the Yao Xian Canal and Chang Xiao Canal is crucial for ensuring the safety of the urban area during flood seasons, aiming to eliminate the historical flooding issues in the central urban area of Yuncheng [1][3]. Group 1: Project Overview - The Yao Xian Canal flood control enhancement project includes significant modifications to the canal's structure, increasing its width from 3.5 meters to 8 meters, and improving its flood discharge capacity by nearly three times [2][6]. - The project is supported by substantial funding, with a total of 800 million yuan and 2.9 billion yuan allocated for the Yao Xian Canal and Chang Xiao Canal projects respectively, ensuring sufficient financial resources for construction [3][4]. Group 2: Construction Progress - The construction of the Yao Xian Canal has been expedited, with over 60 work fronts operating simultaneously, involving more than 600 workers and 300 machines daily, aiming to complete the project ahead of schedule [10]. - As of December 20, 2024, the Yao Xian Canal enhancement project has commenced, with significant progress made in earthworks and concrete pouring, targeting completion before the main flood season [10]. Group 3: Community and Government Involvement - Local government and community leaders have actively participated in the project, ensuring smooth coordination among various departments and minimizing disruptions during construction [6][7]. - The project has seen successful land acquisition for construction, with 96.57 acres secured in less than a month, demonstrating effective collaboration between government and local residents [5][6].
又一重大水利工程开工
中国能源报· 2025-11-17 11:25
Core Viewpoint - The construction of the Huai River flood control project below Fushan is a critical measure for addressing flooding issues in the Huai River basin and improving regional flood control and drainage capabilities, which will enhance the living conditions of the local population [1]. Group 1 - The Huai River project below Fushan is a key control project in the flood control system of the Huai River basin, aimed at solving the waterlogging problems in the middle reaches of the Huai River [1]. - The project will facilitate the rapid discharge of floodwaters from the Huai River, thereby reducing the flood control and drainage pressure in the middle reaches of the river [1]. - The project spans across Jiangsu and Anhui provinces, involving three cities and three counties, and is part of the comprehensive planning and flood control planning for the Huai River basin [1]. Group 2 - The project includes measures such as dredging the main river channel, opening the Fengtieying diversion channel, constructing and reinforcing levees, and implementing the treatment of the Lihua low-lying area [1]. - It is one of the 38 key projects for further flood control in the Huai River and is also part of the 150 major water conservancy projects prioritized by the national government [1].
南水北调山东段工程累计调水突破110亿立方米
Da Zhong Ri Bao· 2025-11-17 01:09
南水北调山东段工程累计调水突破110亿立方米 2024—2025年度,山东段工程累计调引长江水10.66亿立方米,调水量及调水时长再创历史新高, 打破了汛期不能调水的制约。年度调引长江水10.66亿立方米、省内水源7.49亿立方米,向受水市完成供 水13.22亿立方米,供水完成率100.15%,其中,德州、济南分别完成供水2.4亿立方米、1.34亿立方米, 完成率分别为120.3%、116.63%;北延过六五河闸向河北、天津供水1.63亿立方米,超额完成北延应急 供水任务。调水、供水双项指标连续3年创历史新高,工程综合效益持续提升,有力支撑受水区经济社 会高质量发展。(记者 方垒 通讯员 邓妍) 11月15日,南水北调东线一期山东段工程迎来建成通水12周年。记者从省水利厅了解到,12年来, 南水北调山东段工程累计调水突破110亿立方米,其中调引长江水超90亿立方米,直接受益人口超4000 万。该工程成为优化水资源配置、保障群众饮水安全、复苏河湖生态环境、畅通南北经济循环的生命 线。 调水供水双项指标连续3年创历史新高 ...