Workflow
光伏发电
icon
Search documents
国家能源局组织召开风电和光伏发电资源普查试点中期工作会议
国家能源局· 2025-07-03 11:14
为更好推进风电和光伏发电资源普查试点工作,保障《风电和光伏发电资源普查试点工作方案》各 项任务高质量完成, 7 月 2 日上午,国家能源局组织召开了风电和光伏发电资源普查试点中期工 作会议。国家能源局党组成员、副局长、风电和光伏发电资源普查试点工作小组组长万劲松出席会 议并讲话。 会上,河北省、内蒙古自治区、上海市、浙江省、西藏自治区和青海省等六个试点省份能源主管部 门,水电水利规划设计总院、中国气象局公共气象服务中心和国家海洋技术中心等技术支撑单位汇 报了试点工作开展情况;国家能源局新能源司介绍了试点工作总体进展,国家发展改革委、自然资 源部、生态环境部、中国气象局、国家林草局等试点工作小组成员单位进行了工作交流。 会议 对普查工作取得的成效给予充分肯定,并对下一步工作做了部署, 强调风光资源普查试点工 作要坚持 "高站位、高标准、高效率"的要求, 进一步提高对资源普查试点工作重要性的认识,把 质量要求贯穿普查工作全过程 ,切实深化各方协同, 加快工作进展,注重成果应用价值挖掘,以 高水平普查试点工作成果 助推国家 新型能源体系 高质量 建设 。 会议审议通过了《风电和光伏发电资源普查试点技术指南》和《关于 ...
山西省高速公路200MW分布式光伏项目:打造“光”景靓丽的“绿色电力长廊”
Zhong Guo Fa Zhan Wang· 2025-07-02 07:36
Core Viewpoint - The project represents a significant advancement in the integration of distributed photovoltaic (PV) systems along highways in Shanxi Province, showcasing innovative approaches to utilizing idle spaces for renewable energy generation [1][3][7]. Group 1: Project Overview - The Shanxi Provincial Highway 200MW distributed photovoltaic project is the first large-scale distributed PV project in the transportation sector of the province, with a total installed capacity of 49.95MW and a construction area of 599,300 square meters [1]. - The project successfully revitalizes 64 idle spaces along the highway, installing 92,873 high-efficiency monocrystalline PV modules [3]. Group 2: Technological Innovations - The project team implemented several digital technologies to overcome operational challenges, including the integration of MPPT technology, which improved power generation efficiency by 8% [5]. - A 4G cloud monitoring system was deployed to enhance operational efficiency by enabling real-time monitoring and intelligent fault warning across 55 distributed sites [5]. Group 3: Construction Techniques - The team developed an L-shaped modular rooftop material lifting system, increasing lifting efficiency by 80% and reducing operational time by 65% [6]. - The project utilized PVsyst software for energy yield simulation and system optimization, enhancing the durability and efficiency of the PV system [6]. Group 4: Environmental Impact - The project employs a "self-consumption and surplus electricity grid connection" model, ensuring energy security for highway facilities while generating additional revenue from surplus electricity [7]. - Once fully operational, the project is expected to generate 72 million kilowatt-hours annually, reducing coal consumption by 24,000 tons and CO2 emissions by 71,800 tons, equivalent to planting 4 million trees [7].
三一硅能津巴布韦项目开工 新模式打开非洲新能源市场
Zheng Quan Ri Bao Wang· 2025-07-01 11:16
Core Viewpoint - SANY Group's subsidiary, SANY Silicon Energy, has commenced construction on a 10MW solar power project in Zimbabwe, marking its first solar initiative in Africa and utilizing an innovative "EP+F" model to address financial needs [1][2] Group 1: Project Details - The solar project will utilize SANY Silicon Energy's self-developed 710 high-efficiency solar modules, advanced inverters, and high-strength brackets, ensuring efficient power generation in complex environments [1] - The total installed capacity of the project is 10MW, with a construction period of only three months, and it is expected to be connected to the grid by the end of 2025, generating an average of 18 million kWh annually [1] - This project aims to alleviate Zimbabwe's electricity shortages, supporting both industrial and residential electricity needs while promoting low-carbon energy transition in the region [1] Group 2: Market Implications - Zimbabwe's rich mineral resources are constrained by a long-standing electricity supply-demand imbalance, which limits mining capacity and industrial upgrades [2] - The solar power system is seen as an ideal choice for the African renewable energy market due to its short construction cycle, quick investment returns, and high safety [2] - Successful completion of this project could set a benchmark for SANY Silicon Energy in the African market, potentially leading to more projects that enhance local production and living conditions [2]
能源绿色转型 中印尼合作新亮点(第一现场)
Ren Min Ri Bao· 2025-06-30 21:50
Core Insights - Indonesia aims to increase the share of clean energy from 13.09% to 31% by 2050, with significant participation from Chinese companies in developing clean energy projects [1] Geothermal Energy Projects - The Lumutbalai Phase II geothermal project, with a capacity of 55 MW, has successfully connected to the grid, showcasing advanced technology from Chinese enterprises [2] - Indonesia is the second-largest geothermal power producer globally, with over 40% of the world's geothermal resources, and plans to increase its geothermal capacity from 2.6 GW to 7.9 GW by 2035 [1][2] Hydropower Developments - The Batang Hydropower Station, with a total capacity of 510 MW, is set to be completed by the end of this year, expected to generate 2.228 billion kWh annually, significantly alleviating power supply pressure in North Sumatra [4][5] - The project will replace coal and diesel power plants, contributing to Indonesia's green energy transition and creating over 4,000 jobs during construction and operation [5][6] Solar Energy Initiatives - The Karawang 100 MW solar project is the largest land-based solar project in Indonesia, expected to provide over 150 million kWh of clean electricity annually, meeting the needs of approximately 112,000 households [7] - The project incorporates advanced smart technology, enhancing operational efficiency and reducing maintenance costs, while supporting Indonesia's industrial competitiveness [7]
晶科科技: 晶科电力科技股份有限公司2023年员工持股计划草案摘要(二次修订稿)
Zheng Quan Zhi Xing· 2025-06-30 16:33
Core Viewpoint - The company, Jinko Power Technology Co., Ltd., has proposed a revised employee stock ownership plan aimed at enhancing employee engagement and aligning their interests with the company's long-term goals. The plan is designed to attract and retain talent while ensuring compliance with relevant laws and regulations [1][2][3]. Summary by Sections General Principles - The employee stock ownership plan is established to create a profit-sharing mechanism between employees and owners, responding to national calls for common prosperity and enhancing company competitiveness [8][9]. - Participation in the plan is voluntary, and the company will not impose mandatory participation on employees [2][10]. Participants and Scope - The plan targets a maximum of 150 participants, including directors, supervisors, senior management, and other key personnel [10][11]. - The funding for the plan will come from employees' legal salaries, self-raised funds, and other legally permitted sources, with no financial assistance provided by the company [3][17]. Stock Source and Pricing - The stocks for the plan will be sourced from shares repurchased by the company, totaling 28.9092 million shares already completed and additional shares planned for repurchase with a total fund not exceeding 200 million yuan and not less than 100 million yuan [3][11][17]. - The average purchase price for the initial allocation of shares is set at 2.40 yuan per share, which is below the market price at the time of the plan's announcement [19][20]. Duration and Lock-up Period - The plan will have a duration of 60 months from the date the last share is transferred to the plan, with a lock-up period of 12 months during which trading is prohibited [5][21]. - The vesting of shares will occur in three phases based on the company's performance and individual assessments [5][31]. Performance Assessment - The performance assessment for the vesting of shares is based on company-level and individual-level metrics, with specific growth targets set for net profit over the assessment periods [31][32]. - The first vesting period requires a net profit growth rate of at least 50% compared to 2022, with subsequent periods having progressively higher targets [31][32]. Management and Governance - A management committee will oversee the plan, representing the interests of the participants and ensuring compliance with regulations [7][28]. - The committee will manage the daily operations of the plan and make decisions regarding the distribution of shares and any necessary adjustments [28][30].
经济日报丨累计装机规模超10亿千瓦——光伏发电实现历史性突破
国家能源局· 2025-06-30 04:18
Core Viewpoint - China's photovoltaic (PV) power generation capacity has achieved a historic breakthrough, with cumulative installed capacity surpassing 1 billion kilowatts, accounting for 30% of the country's total power generation capacity, and nearly half of the global PV installed capacity coming from China [1][2]. Group 1: Photovoltaic Installed Capacity Growth - In the first five months of this year, China's cumulative newly installed PV capacity reached nearly 200 million kilowatts, representing a year-on-year growth of 57% [1]. - The cumulative installed capacity of PV power generation in China has exceeded 1.08 billion kilowatts, with new projects continuously coming online [1]. - The month of May alone saw new PV installations equivalent to one-third of last year's total, marking a historical monthly high [2]. Group 2: Industry Development and Technological Advancements - Since the "dual carbon" goals were proposed in 2020, China's PV installed capacity has rapidly increased from over 200 million kilowatts to over 1 billion kilowatts in just over a year [2]. - The PV industry chain in China consists of over 1 million enterprises, generating an annual output value exceeding 1 trillion yuan [2]. - Key technological advancements include self-sufficiency in high-purity crystalline silicon, breakthroughs in large-sized silicon wafers, high-efficiency battery technology, and the integration of smart inverters and energy storage systems [2]. Group 3: Infrastructure and Energy Transmission - The construction of transmission projects has accelerated, enhancing the capacity for clean energy consumption [3]. - The completion of the ±800 kV UHVDC project from Longdong to Shandong marks the establishment of China's first integrated energy base for wind, solar, thermal, and storage [3]. - The Hami-Chongqing ±800 kV UHVDC transmission project, which has begun operation, supports a renewable energy base with over 10.2 million kilowatts of installed capacity, with renewable energy accounting for over 70% [3][4]. Group 4: Future Outlook and Market Dynamics - The new policy effective from June 1, which allows newly commissioned renewable energy projects to enter market trading, has led to increased uncertainty in future electricity prices and returns, prompting companies to accelerate installations [2]. - The ongoing development of large-scale wind and solar bases and their associated UHV transmission projects is expected to optimize the cross-regional allocation of energy resources [4].
华能水电中标结果:勐腊县2025年第一批集中式光伏发电项目投资主体优选中选结果公告
Sou Hu Cai Jing· 2025-06-28 12:23
Core Points - Huaneng Lancang River Hydropower Co., Ltd. has been awarded the bid for the first batch of centralized photovoltaic power generation project investment主体优选 in Mengla County for 2025 [1][2][3] Group 1: Bid Information - The bid number for the project is 云盛招字 F2025-023 [2] - Huaneng Lancang River Hydropower Co., Ltd. is the selected bidder for all three segments of the project [2][3][4] - The project includes the following segments: - Segment 1: Laojie Photovoltaic Power Generation Project - Segment 2: Tengmieshan Photovoltaic Power Generation Project (Phase III) - Segment 3: Xingshan Photovoltaic Power Generation Project [2][3][4] Group 2: Project Development Commitments - The company commits to complete project filing within one month after signing the investment development cooperation agreement [3][4] - The company must start construction within two months after project filing, with a maximum of two months of pre-construction procedure time excluded [3][4] - The company aims to achieve production conditions within eight months after construction begins and full capacity grid connection within one year from the start of construction [3][4] Group 3: Quality Assurance - Huaneng Lancang River Hydropower Co., Ltd. guarantees timely funding for the project and aims for smooth and steady progress towards on-time production [3][4] - The company commits to meeting the current acceptance standards for renewable energy projects [3][4]
太阳能(000591) - 2025年6月25日 投资者关系活动记录表
2025-06-26 01:22
Group 1: Company Operations and Technology - The company currently has a total energy storage capacity of approximately 1500 MWh, primarily supporting photovoltaic power stations, including lithium iron phosphate, all-vanadium flow, and supercapacitor storage types [2] - The main technology for the company's operational power stations is TOPCon, with pilot projects using HJT technology and plans to trial BC and perovskite components as needed [3] Group 2: Financial Performance and Dividends - In 2024, the company received a total of 1.366 billion CNY in electricity subsidies, with 1.233 billion CNY from national subsidies [3] - The company has distributed approximately 1.512 billion CNY in cash dividends over the past three years, with a dividend payout ratio averaging 36% of annual net profit attributable to shareholders [3] Group 3: International Expansion - The company is in discussions with relevant departments in Sri Lanka, Indonesia, and Uzbekistan, with some projects having signed MOUs [3] - Future plans include accelerating investment in overseas photovoltaic projects, focusing on development and acquisition in countries along the "Belt and Road" initiative [3] Group 4: Information Disclosure Compliance - The company adhered to information disclosure management regulations during the investor meeting, ensuring no significant undisclosed information was leaked [3]
人民日报海外版丨中国光伏发电装机突破10亿千瓦 火电装机占比降至约40%
国家能源局· 2025-06-25 04:55
Core Viewpoint - The total installed capacity of photovoltaic (PV) power in China has surpassed 1 billion kilowatts, marking a significant advancement in the development of renewable energy [1] Group 1: Installed Capacity Growth - In the first five months of this year, the cumulative newly connected capacity reached nearly 20 million kilowatts, representing a year-on-year growth of 57% [1] - The total installed capacity of PV power in China has reached 1.08 billion kilowatts, equivalent to approximately 48 Three Gorges power stations, accounting for 30% of the country's total power generation capacity and nearly half of the global PV installed capacity [1] Group 2: Industry Competitiveness - The achievement of 1 billion kilowatts in installed capacity not only signifies a substantial amount of clean electricity but also fosters a complete and internationally competitive PV industry chain [1] - There are over 1 million enterprises in China's PV industry chain, generating an annual output value exceeding 1 trillion yuan [1] Group 3: Technological Advancements - Key materials such as high-purity crystalline silicon are now under domestic control, with continuous breakthroughs in large-sized silicon wafers, high-efficiency battery technology, and record-high component efficiency [1] - The integration of smart inverters and energy storage systems showcases the leading technological level of various segments within China's PV industry chain [1] Group 4: Shift in Energy Mix - As of the end of May, the cumulative installed capacity of thermal power was approximately 1.46 billion kilowatts, with its share of the total power generation capacity in China decreasing to about 40% [1]
太阳能: 中节能太阳能股份有限公司主体及22太阳G12025年度跟踪评级报告
Zheng Quan Zhi Xing· 2025-06-23 12:20
东方金诚债跟踪评字【2025】0209 号 中节能太阳能股份有限公司: 东方金诚国际信用评估有限公司根据跟踪评级安排对贵公司及"22 太阳 G1"的信用状况进行了跟踪评级,经信用评级委员会评定, 此次跟踪评级维持贵公司主体信用等级为 AA+,评级展望为稳定, 同时维持"22 太阳 G1"信用等级为 AA+。 东方金诚国际信用评估有限公司 信评委主任 二〇二五年六月二十日 东方金诚债跟踪评字【2025】0209 号 信用评级报告声明 为正确理解和使用东方金诚国际信用评估有限公司(以下简称"东方金诚")出具的信用评级 报告(以下简称"本报告"),本公司声明如下: 的关联关系,本次项目评级人员与评级对象之间亦不存在任何影响本次评级行为独立、客 观、 公正的关联关系。 勤勉尽责和诚信义务,有充分理由保证本次评级遵循了真实、客观、公正的原则。 和第三方组织或个人的干预和影响。 准确性、完整性均由资料提供方和/或发布方负责,东方金诚按照相关性、可靠性、及时性的 原 则对评级信息进行合理审慎的核查分析,但不对资料提供方和/或发布方提供的信息合法性、 真 实性、准确性及完整性作任何形式的保证。 诚不对发行人使用/引用本报告产 ...