Workflow
铁路建设
icon
Search documents
中企承建的非洲最长重载铁路桥顺利贯通
Zhong Guo Xin Wen Wang· 2025-12-11 07:41
Core Viewpoint - The completion of the PK330 bridge, the longest heavy-load railway bridge in Africa, marks a significant milestone in the construction of the western railway mining line in Algeria, showcasing the engineering capabilities of China Railway Construction International Group [1] Group 1: Project Overview - The PK330 bridge is located in the Tindouf Province of Algeria, spans 6 kilometers, and is noted for being the longest and most challenging bridge in terms of construction on the entire line [1] - The project is part of a larger 575-kilometer western railway mining line that connects Bechar Province to the Gara Djebilet iron ore mine, enhancing the transportation network in Algeria [1] Group 2: Construction Challenges - The project faced extreme environmental conditions, including high temperatures, sandstorms, and freshwater shortages, which posed significant challenges to construction [1] - The geological conditions at the bridge site, characterized by loose sand and gravel layers, complicated machinery operations, concrete pouring, and continuous work [1] Group 3: Significance and Impact - The completion of the PK330 bridge is described as an "unprecedented engineering feat" and is one of the largest railway construction projects in North Africa to date [1] - This project is a landmark initiative under the Belt and Road Initiative, aimed at improving transportation and economic development in Algeria's southwestern region [1]
中企承建非洲最长重载铁路桥顺利贯通
Xin Hua She· 2025-12-11 02:56
新华社阿尔及尔12月10日电(记者徐永春)日前,由中国铁建承建的非洲最长重载铁路桥PK330大 桥在阿尔及利亚顺利实现轨道铺通,标志着阿尔及利亚西部铁路矿业线建设取得阶段性成果。 据介绍,PK330大桥位于阿尔及利亚廷杜夫省,地处撒哈拉沙漠,全长6公里。该桥8日晚顺利贯 通,是阿尔及利亚西部铁路矿业线跨度最长、施工难度最大、工期最紧的桥梁。 目前,阿尔及利亚西部铁路矿业线项目累计为当地创造了7000多个工作岗位,培训了1000多名技术 工人。 阿尔及利亚西部铁路矿业线项目由中国铁建与阿国有企业共同实施。项目主要内容为新建575公里 铁路,连接该国贝沙尔省和廷杜夫省加拉杰比莱特铁矿区。项目建成后,将进一步完善阿尔及利亚国家 铁路网,助力阿西南部省份互联互通和经济发展。 当地自然环境恶劣,项目建设面临极端高温、沙尘暴频繁、淡水紧缺等挑战。桥址地质以松散沙土 与卵石夹层为主,给机械运转、混凝土浇筑和连续作业带来严峻考验。当地媒体报道说,PK330大桥的 建成是一项"工程壮举",是北非迄今最庞大的铁路施工工程之一。 ...
我国时速350公里最长高铁隧道贯通
Huan Qiu Wang· 2025-12-10 14:25
Core Viewpoint - The successful completion of the Yiliang Tunnel, a critical project for the Yukun High-Speed Railway, marks a significant achievement in China's high-speed rail construction under complex geological conditions, laying a solid foundation for the entire line's operation [1][3]. Group 1: Project Details - The Yiliang Tunnel, located in Zhaotong City, Yunnan Province, spans 24.8 kilometers with a design speed of 350 kilometers per hour and a maximum depth of 920 meters, making it the longest and fastest high-speed rail tunnel in China [3]. - The tunnel traverses the Umon Mountain area, known for its complex geological structures, including rock bursts, high ground temperature, water inflow, and soft rock deformation, presenting significant construction challenges [3][5]. Group 2: Construction Techniques - The construction team implemented various measures to address high ground stress rock bursts, including stress release, fiber-reinforced concrete spraying, and increased prestressed anchor rods to ensure safety and progress [5]. - To tackle high-temperature environments and drainage issues, an intelligent temperature control system was developed, maintaining working conditions around 30°C, and a multi-level drainage system was established with a daily capacity of 345,000 cubic meters [5]. Group 3: Technological Innovations - A research team led by experts was formed to address the unique challenges of the Umon Mountain range, resulting in a proprietary technology system with three provincial-level construction methods and seven national patents, along with one international patent application [5]. Group 4: Economic Impact - The Yukun High-Speed Railway, approximately 700 kilometers long with a 388.6-kilometer segment in Yunnan, will reduce travel time between Chongqing and Kunming to about two and a half hours, significantly enhancing connectivity and promoting high-quality economic development in the Chengdu-Chongqing economic circle and the central Yunnan urban agglomeration [6].
铁路建设优质高效推进 前11月完成固定资产投资7538亿元
Xin Hua Wang· 2025-12-10 10:50
Group 1 - The core viewpoint of the articles highlights the significant progress in railway construction in China, with a fixed asset investment of 753.8 billion yuan from January to November, representing a year-on-year increase of 5.9%, which supports high-quality economic development [1][2] - The China National Railway Group is focusing on serving national strategies and regional economic development, advancing railway planning and construction to build a world-class modern railway network [1] - Key railway projects are making substantial progress, including the opening of the Panxian to Xingyi high-speed railway, which boosts tourism and regional economic development, and the trial operation phases of several other high-speed rail lines [1][2] Group 2 - Ongoing construction projects are progressing smoothly, with construction units optimizing organization and enhancing safety, quality, and environmental protection [1] - Specific projects include the Yujialiang Tunnel of the Xiyu High-speed Railway, which has surpassed 10,000 meters in excavation, and the successful completion of the Hongwu High-speed Railway's major bridge [1][2] - The China National Railway Group plans to accelerate the construction of modern railway infrastructure, optimize construction resources, and ensure the completion of annual investment tasks to achieve the goals of the 14th Five-Year Plan [2]
我国时速350公里高铁最长隧道贯通 渝昆行车时间将压至2.5小时
Yang Shi Wang· 2025-12-10 09:30
央视网消息:12月10日,我国时速350公里高铁最长隧道——渝昆高铁彝良隧道顺利贯通。 彝良隧道位于云南省昭通市境内,全长24.8公里,设计时速350公里,最大埋深920米,采用双洞单线的设计形式,是我国目前贯 通里程最长、时速最快的高铁隧道。 渝昆高铁全长约700公里,其中云南段长388.6公里,是云南省内首条时速350公里的高速铁路,目前已进入全面冲刺阶段,全线 建成通车后,重庆到昆明的行车时间将压缩至两个半小时左右,对促进成渝地区双城经济圈与滇中城市群之间互联互通,推动沿线 地区经济社会高质量发展具有重要意义。 中国铁建大桥局渝昆高铁项目负责人 饶胜斌:针对高地应力岩爆,我们采取提前应力释放、喷射纤维混凝土、增加预应力锚杆 等措施,有效保障了施工安全和工程推进。 隧道穿越素有"地质博物馆"之称的乌蒙山腹地,施工面临岩爆、涌水、瓦斯等复杂地质条件考验,建设难度极大。 ...
兰合铁路重难点控制性工程曲奥隧道顺利贯通
Xin Hua Wang· 2025-12-10 08:42
Core Viewpoint - The successful completion of the Qucao Tunnel marks a significant breakthrough in the construction of the Lanzhou-Hohhot Railway, laying a solid foundation for the entire line's operation [1] Group 1: Project Overview - The Qucao Tunnel, located in Gansu Province, is a single-hole double-track tunnel with a total length of 10,669 meters [1] - The tunnel faces challenging geological conditions, with over 70% of the surrounding rock classified as grade four and five, presenting high construction risks [1] Group 2: Technological Implementation - The construction team utilized BIM+GIS technology to create a three-dimensional geological model, allowing for precise monitoring of tunnel deformation and timely adjustments to support parameters [1] Group 3: Economic and Social Impact - The Lanzhou-Hohhot Railway is a crucial part of the national "Eight Vertical and Eight Horizontal" high-speed railway network, with a new main line length of 147.42 kilometers and a design speed of 200 kilometers per hour [1] - Once operational, the railway will connect with the Xining-Chengdu Railway, enhancing the regional railway network and ending the historical lack of railway access in certain areas of Gansu Province, which is expected to promote high-quality economic and social development along the route [1]
中国时速350公里高铁最长隧道贯通
Zhong Guo Xin Wen Wang· 2025-12-10 08:36
编辑:万可义 中国时速350公里高铁最长隧道贯通 广告等商务合作,请点击这里 中新社北京12月10日电 (记者 刘文文)记者10日从京昆高铁西昆公司获悉,渝昆高铁重难点控制性工程 彝良隧道当日安全贯通,标志着中国高铁建设在长大复杂地质条件下再次取得重大突破,为全线建成通 车打下坚实基础。 本文为转载内容,授权事宜请联系原著作权人 彝良隧道位于云南省昭通市境内,全长24.8公里,设计时速350公里,最大埋深920米,采用双洞单线的 设计形式,是中国目前贯通里程最长、时速最快的高铁隧道。隧道穿越素有"地质博物馆"之称的乌蒙山 腹地,这里山高谷深,地势险峻,地质构造复杂多变,建设难度极大。 中新经纬版权所有,未经书面授权,任何单位及个人不得转载、摘编或以其它方式使用。 关注中新经纬微信公众号(微信搜索"中新经纬"或"jwview"),看更多精彩财经资讯。 面对乌蒙山脉特有的软岩大变形、高地温、岩溶发育、高地应力等世界级建设难题,建设团队组建科研 攻关团队,形成了具有自主知识产权的成套技术体系。截至目前,获得国家专利7项,申报国际专利1 项,相关技术已推广应用于重大铁路建设项目,为中国长大高铁隧道施工积累了宝贵经验。 ...
渝昆高铁最长隧道贯通
Xin Lang Cai Jing· 2025-12-10 04:37
Core Viewpoint - The successful completion of the Yiliang Tunnel marks a significant milestone for the Yukun High-Speed Railway, laying a solid foundation for the entire line's construction and operation [1] Group 1: Project Details - The Yiliang Tunnel, the longest tunnel of the Yukun High-Speed Railway, is located in Zhaotong City, Yunnan Province, with a total length of 24.8 kilometers [1] - The construction of the tunnel is managed by China Railway Erju, China Railway Construction Bridge Bureau, and China Railway Fifth Bureau, highlighting the collaboration among major construction firms [1] Group 2: Importance of the Project - The Yiliang Tunnel is considered a critical and challenging control project for the Yukun High-Speed Railway, emphasizing its significance in the overall infrastructure development [1]
通苏嘉甬常熟西站桩基施工 同时容纳近2000名旅客 预计后年底完工
Su Zhou Ri Bao· 2025-12-10 00:56
作为高铁常熟西站依托的重大交通项目,通苏嘉甬铁路是国家"八纵八横"高速铁路网中沿海通道的 重要组成部分,也是长三角地区南北向的骨干高铁线路。该条铁路在常熟境内线路全长25.2公里,从常 熟西部区域穿越,途经常福街道、虞山街道、尚湖镇和辛庄镇,共4个镇(街道)12个村组,并在虞山 尚湖风景区西侧设常熟西站。通苏嘉甬铁路建成后,将促进常熟与长三角周边城市的区域融合发展。 昨天(12月9日),随着两台钻机的隆隆启动,通苏嘉甬铁路常熟西站站房项目启动桩基施工。 常熟西站站场规模为2台6线,站房总建筑面积约15000平方米,可同时容纳近2000名旅客,预计 2027年底与通苏嘉甬铁路同步完工。 常熟西站配套工程建设同步推进,目前正加紧办理相关前期手续,同步推进征地搬迁、水系调整、 交通导改等工作,确保与铁路站房同步建成投用。 ...
通苏嘉甬高铁张家港东站房首桩顺利开钻
Yang Zi Wan Bao Wang· 2025-12-09 14:44
Core Viewpoint - The construction of the Zhangjiagang East Station project, part of the Nantong to Ningbo high-speed railway, has officially entered a substantial construction phase with the successful drilling of the first engineering pile [1] Group 1: Project Details - The East Station building will cover an area of approximately 20,000 square meters, with an additional 12,000 square meters allocated for an underground parking lot and 1,400 square meters for the main structure of the rail transit [1] - The design concept of the East Station is inspired by "cloud sails navigating the vast sea," complementing the West Station's theme of "bravely standing at the forefront, welcoming distant sails" [1] - The station will feature a dual-layer drop-off and boarding system, with the underground level reserved for future metro extensions and the first underground level housing the exit hall, distribution hall, and parking [1] Group 2: Connectivity and Infrastructure - An underground passage will effectively connect the East and West station buildings, utilizing space under the bridge to create dedicated transfer corridors for seamless integration of various transportation modes [1] - The East Station is expected to be completed by the end of 2027, in sync with the Tong-Su-Jia-Ning railway, and will add 1,738 social parking spaces to meet passenger parking needs once surrounding municipal infrastructure is completed [1]