铁路建设
Search documents
企业合规第121期 | 中国证券业协会修订发布《证券公司履行社会责任专项评价办法》
Sou Hu Cai Jing· 2025-08-22 15:10
Group 1 - The "Corporate Compliance" column will provide major compliance-related legislative and enforcement alerts for state-owned enterprises in Shenzhen, enhancing their ability to mitigate compliance risks and support their international expansion [2] Group 2 - The China Securities Association revised and published the "Special Evaluation Measures for Securities Companies' Social Responsibility," which includes 18 articles and 13 evaluation indicators focusing on rural revitalization, investor education, social welfare, and industry ecological construction [3] - Securities companies are advised to align their annual social responsibility plans with the evaluation measures and actively disclose their social responsibility performance through various channels [3] Group 3 - The Ministry of Transport announced the revised "Management Measures for Survey and Design of Railway Construction Projects," which includes 10 chapters and 56 articles outlining compliance obligations throughout the railway construction process [4] - Railway construction companies are encouraged to strengthen compliance management and ensure quality control throughout the entire process [4] Group 4 - Six departments, including the National Intellectual Property Administration, jointly issued the "Guidelines for the Construction and Operation of Patent Pools," aimed at guiding high-quality patent pool development and promoting patent resource integration [5] - High-tech and patent-intensive companies are advised to establish clear standards for patent pool entry and optimize licensing mechanisms to ensure fair conditions [5] Group 5 - A company in Hainan was penalized for concealing over 200 million yuan in unbilled sales revenue, resulting in a total penalty of approximately 29 million yuan [7] - Companies are advised to maintain accurate accounting records and ensure all transactions are conducted through official accounts to avoid tax evasion [7] Group 6 - Two insurance companies had their business licenses revoked due to multiple violations, including discrepancies in governance reports and unauthorized transactions [8][9] - Insurance companies are recommended to establish mechanisms for verifying the accuracy of reports submitted to regulators and to ensure compliance with governance standards [9] Group 7 - The State Administration for Market Regulation published ten typical cases of illegal advertising across various sectors, highlighting issues in internet advertising [10] - Companies are urged to conduct thorough advertising reviews to prevent false claims and ensure compliance with advertising regulations [10] Group 8 - The U.S. Department of Justice released new guidelines for the Foreign Corrupt Practices Act (FCPA), focusing on reducing burdens on U.S. companies operating overseas while targeting corruption [12] - Companies are advised to stay informed about these guidelines to ensure compliance in international operations [12] Group 9 - The European Data Protection Board issued guidelines on data transfer to third countries under GDPR, emphasizing the need for legal bases and safety measures [12][13] - Companies should evaluate the legality of data transfers and ensure compliance with GDPR requirements when responding to data requests from third countries [13] Group 10 - The UK Parliament passed the Data Use and Access Bill, which aims to balance data innovation with privacy protection [15] - Companies should be aware of the new data protection principles and the requirements for data sharing under this legislation [15]
川青铁路尖扎黄河特大桥施工绳索断裂事故已致12人遇难
Xin Hua Wang· 2025-08-22 11:12
新华社西宁8月22日电(记者王浡、周盛盛)记者从"8·22"川青铁路尖扎黄河特大桥施工绳索断裂 事故应急指挥部获悉,截至22日18时,事故已造成12人遇难、4人失联,救援和应急处置各项工作正在 紧张进行中。 目前,应急管理部派工作组抵达现场指导事故救援处置工作。 22日凌晨3时10分许,中铁大桥局川青铁路11标项目部尖扎黄河特大桥在钢绞线张拉作业中断裂, 导致108米钢梁主拱肋垮塌。 ...
西部超级工程:新藏铁路投资约五千亿
Jing Ji Guan Cha Wang· 2025-08-22 09:48
Core Viewpoint - The establishment of the New Tibet Railway Company marks a significant advancement in infrastructure development in the Tibetan Plateau, with a focus on connecting Xinjiang and Tibet through a railway that spans approximately 2063 kilometers [2][4]. Infrastructure Development - The New Tibet Railway will be the fourth railway to Tibet, complementing existing lines and enhancing connectivity with surrounding regions [4]. - The project is expected to have a construction period exceeding 16 years, longer than the Sichuan-Tibet Railway [2]. - The total investment for the New Tibet Railway is estimated to reach around 500 billion yuan, comparable to the Sichuan-Tibet Railway's investment of over 370 billion yuan [6][7]. Economic Impact - The railway is anticipated to promote regional economic development, improve trade routes, and enhance the living standards of local populations [2][9]. - It will facilitate the development of tourism in previously inaccessible areas of Tibet, potentially increasing tourism revenue [9]. - The project aligns with China's broader strategy of regional coordination and economic integration, particularly in the context of the Belt and Road Initiative [10][12]. Environmental Considerations - The construction of the New Tibet Railway will face significant ecological challenges due to its location in a fragile ecological zone, necessitating eco-friendly construction practices [3][12]. - Special ecological protection plans will be required to minimize disruption to local wildlife and ecosystems [3]. Strategic Importance - The railway is crucial for national security and defense, enabling efficient transportation of strategic materials to border areas [11]. - It will enhance Xinjiang's connectivity with southern China and improve Tibet's access to external markets, fostering economic ties with neighboring countries [9][10]. Funding Sources - Funding for the New Tibet Railway will come from a mix of central government financing, special bonds, policy financial institutions, and social capital [8][7].
决胜“十四五” 打好收官战|世界最长海底高铁隧道中的火热干劲
Xin Hua She· 2025-08-22 05:25
Core Points - The Ningbo-Zhoushan Railway's underwater tunnel, known as the Jintang Submarine Tunnel, is a record-breaking engineering project, measuring 16.18 kilometers in total length, with an underwater section of 11.21 kilometers, making it the world's longest underwater high-speed rail tunnel [1][5] - The construction employs two shield machines that start from both Ningbo and Zhoushan sides, facing each other to ensure precise alignment after traversing complex geological conditions [1][2] - The project is significant for the integration of the Yangtze River Delta region, as it will end the historical lack of railway access to Zhoushan upon completion [5] Construction Details - As of May 2024, the shield machine has advanced nearly 2,400 meters, currently located about 65 meters below sea level, marking a critical phase as it transitions from land to marine construction [2] - The shield machine must navigate through various geological layers, including four soft soil sections and eight hard rock sections, with hard rock layers comprising nearly 70% of the total [2][4] - Advanced technologies, such as a proactive geological forecasting system, are utilized to monitor geological conditions ahead of the shield machine, enhancing safety and efficiency [4] Workforce and Timeline - The project employs over 200 workers who operate in two shifts around the clock, with the tunnel expected to connect with the Zhoushan side by the end of 2026 [5] - The project is positioned as a key initiative within China's 14th Five-Year Plan, emphasizing the urgency and commitment to high-quality project execution [5]
决胜“十四五” 打好收官战
Xin Lang Cai Jing· 2025-08-22 03:04
Core Points - The Ningbo-Zhoushan Railway's underwater tunnel, known as the Jintang Submarine Tunnel, is a record-breaking engineering project, measuring 16.18 kilometers in total length, with an underwater section of 11.21 kilometers and a maximum depth of 78 meters, making it the world's longest underwater high-speed rail tunnel [2][3] - The construction employs two shield machines that start from both Ningbo and Zhoushan sides, advancing towards each other while navigating high water pressure and complex geological conditions [2] - The project is significant for the integration of the Yangtze River Delta region, as it will end the historical lack of railway access to Zhoushan upon completion in late 2026 [7] Construction Details - As of May 2024, the shield machine has advanced nearly 2,400 meters, currently located about 65 meters below sea level, marking a critical phase as it transitions from land to marine construction [3] - The shield machine must traverse various geological layers, including 4 segments of soft soil and 8 segments of hard rock, with hard rock layers comprising nearly 70% of the total [3] - Advanced technologies, such as a proactive geological forecasting system, are utilized to enhance the precision of geological assessments and improve construction safety [5] Workforce and Project Management - The project employs over 200 workers who operate in two shifts around the clock to ensure continuous progress [7] - The project team is committed to maintaining high-quality standards and timely completion, aligning with the goals of the 14th Five-Year Plan [7]
金建高铁兰溪至建德段开始铺轨
Xin Hua Wang· 2025-08-22 02:53
21日,在金建高铁兰溪东站高铁站内,随着第一对500米长钢轨在工人与大型设备的精准配合下稳 稳落定,新建金华至建德高速铁路兰溪至建德段铺轨施工正式启动,项目建设取得重大进展。 金建高铁作为国家中长期铁路网规划和浙江省铁路建设"八八计划"项目之一,自既有金华站引出, 向北经兰溪市、建德市,在建德站接入杭黄高铁,全长64.51公里,设计时速250公里。沿线设金华、兰 溪东、大洋、建德等4座车站,其中兰溪东站和大洋站为新建车站。本次启动铺轨的兰溪至建德段,需 完成正线铺轨87.1公里,站线铺轨6.63公里,并铺设道岔30组。 截至7月底,金建高铁累计完成投资83.033亿元。当前,项目路基、桥梁、隧道工程均已全部贯 通,站房工程与"四电"工程正有序推进,铺轨工程全面加速实施。(记者 张帆 金思成 通讯员 徐张 时 宽兵) 为确保铺轨工程安全、优质、高效推进,建设者高峰期可组织1000余名建设者同步奋战,单日铺轨 进度最高可达4.5公里。 ...
川青铁路青海段尖扎黄河特大桥施工绳索断裂,4人遇难12人失联
第一财经· 2025-08-22 01:20
Core Viewpoint - A construction accident occurred at the Qianqing Railway's Qianza Yellow River Bridge, resulting in casualties and ongoing rescue efforts [3][5]. Group 1 - The accident involved a rope failure during construction, with multiple workers present at the site [3]. - As of 8 AM on August 22, the incident has led to 4 confirmed deaths and 12 individuals reported missing [5]. - Rescue operations are currently underway to locate the missing workers [5].
渝昆高铁首座超二十公里特长隧道贯通
Ren Min Ri Bao· 2025-08-21 22:01
Core Points - The Bianghui Tunnel, a key project of the Yukun High-speed Railway, has successfully completed its construction, marking it as the first super-long tunnel over 20 kilometers in the southwest region of China [1] - The tunnel, located in Yiliang County, Zhaotong City, Yunnan Province, features a dual-tube single-line design and is classified as a high-risk tunnel due to its complex geological conditions [1] - With the completion of the Bianghui Tunnel, the overall tunnel construction progress in Yunnan for the Yukun High-speed Railway has reached 85%, and over 95% of bridge and tunnel construction has been completed [1] Industry Progress - The Yukun High-speed Railway is entering a critical construction phase, with the main body of the roadbed, bridges, and tunnels nearly completed [1] - The project is now accelerating the construction of the "four electrics" and station building works, preparing to fully enter the ballastless track construction phase [1]
广西构建标准化交流合作机制解决涉东盟合作堵点
Zhong Guo Xin Wen Wang· 2025-08-21 17:42
Group 1 - The core viewpoint of the articles highlights Guangxi's efforts to enhance standardization cooperation with ASEAN countries, addressing existing challenges in policy communication and collaboration [1][2] - Guangxi has established the ASEAN National Standardization Cooperation Exchange Center to facilitate standardization negotiations and improve cooperation with ASEAN [1] - The center has participated in the negotiation of the standardization chapter of the China-ASEAN Free Trade Area 3.0 agreement and strengthened collaboration with the International Organization for Standardization (ISO) [1] Group 2 - In the first half of 2025, Guangxi's cross-border e-commerce import and export volume exceeded 25 billion RMB, with a year-on-year growth of over 140%, and nearly 70% of this trade involved ASEAN countries [2] - Guangxi is addressing issues related to differing cross-border express delivery standards and challenges in returning cross-border e-commerce goods by implementing logistics service standard enhancement projects [2] - In agriculture, Guangxi has initiated standardized demonstration projects in Vietnam, resulting in a 51% increase in rice yield through standardized planting and agricultural technology training [2]
甘其毛都—嘎舒苏海图跨境铁路建设稳步推进
Shang Wu Bu Wang Zhan· 2025-08-21 17:19
(原标题:甘其毛都—嘎舒苏海图跨境铁路建设稳步推进) 据蒙古政府新闻网报道,由中国企业承建的甘其毛都—嘎舒苏海图跨境铁路工 程正在按计划推进。该铁路全长32.6公里,采用1520毫米宽轨与1435毫米标准 轨并行,设计年货运量4000万吨,总投资9020亿图格里克(约18.11亿元人民 币),计划两年内完工。线路包括19.5公里干线铁路及多座8至31米高的单、 双线桥梁,配套有边境检查综合楼、技术楼等基础设施。目前,地基开挖、土 壤压实、混凝土浇筑和模板安装工作已完成,杆柱安装进度41%,围栏施工同 步进行。该铁路桥中国境内段由国家能源集团投资建设,蒙古境内段由蒙额尔 登斯塔旺陶勒盖股份公司融资。 ...