Workflow
新能源发电
icon
Search documents
大唐新能源(01798)前7个月累计完成发电量约2135.63万兆瓦时 同比增加11.75%
智通财经网· 2025-08-11 13:00
Core Viewpoint - 大唐新能源 reported a significant increase in power generation for the year ending July 2025, with total generation reaching 2,480,506 MWh, representing a year-on-year growth of 24.95% compared to 2024 [1] Summary by Category Power Generation - The total power generation for the year ending July 2025 was 2,480,506 MWh, which is an increase of 24.95% from 2024 [1] - Wind power generation accounted for 1,882,564 MWh, reflecting a year-on-year growth of 14.74% [1] - Solar power generation reached 597,942 MWh, showing a substantial increase of 73.59% compared to 2024 [1] Cumulative Power Generation - As of July 31, 2025, the cumulative power generation for the year was 21,356,332 MWh, marking an 11.75% increase from 2024 [1] - Cumulative wind power generation stood at 18,375,476 MWh, which is an 8.80% increase year-on-year [1] - Cumulative solar power generation was 2,980,856 MWh, representing a 34.20% increase compared to 2024 [1]
大唐新能源前7个月累计完成发电量约2135.63万兆瓦时 同比增加11.75%
Zhi Tong Cai Jing· 2025-08-11 12:57
Core Insights - Datang New Energy (01798) reported a total power generation of 2,480,506 MWh for July 2025, representing a year-on-year increase of 24.95% compared to 2024 [1] - The wind power generation reached 1,882,564 MWh, showing a year-on-year growth of 14.74%, while solar power generation was 597,942 MWh, marking a significant increase of 73.59% compared to 2024 [1] - As of July 31, 2025, the cumulative power generation for the year stood at 21,356,332 MWh, which is an 11.75% increase from 2024 [1] - Wind power generation for the cumulative period was 18,375,476 MWh, reflecting an 8.80% year-on-year increase, and solar power generation totaled 2,980,856 MWh, up by 34.20% compared to 2024 [1]
山东:出台实施方案推动新能源电价全面市场化
Zhong Guo Fa Zhan Wang· 2025-08-11 08:45
《实施方案》明确,2025年6月1日前投产的存量新能源项目全电量参与市场交易后,机制电价水平按国 家政策上限执行,统一明确为每千瓦时0.3949元(含税),单个项目机制电量上限原则上与现行具有保障 性质的相关电量规模政策相衔接,执行期限按照全生命周期合理利用小时数剩余小时数与投产满20年较 早者执行。2025年6月1日起投产的增量新能源项目,由山东省发展改革委会同有关单位明确机制电量规 模、执行期限,通过价格竞争方式确定机制电价水平。《实施方案》同时强调,各地不得将配置储能作 为新建项目核准、并网、上网等前置条件。 中国发展网讯记者尹明波、高杨报道近日,山东省发展改革委、国家能源局山东监管办、省能源局印发 《山东省新能源上网电价市场化改革实施方案》,明确提出推动新能源上网电价全部由市场形成。新能 源项目(风电、太阳能发电)上网电量原则上全部进入电力市场,上网电价通过市场交易形成,同时根据 电力市场建设及行业发展状况适时推动生物质发电等其他新能源参与市场交易。 山东此番出台《实施方案》有一个大的背景。今年2月,国家发展改革委、国家能源局印发《关于深化 新能源上网电价市场化改革促进新能源高质量发展的通知》,对新能 ...
新天绿能: 7月发电量同比增加9.32%
公告同时显示,根据公司初步统计,今年7月,公司及子公司按合并报表口径完成输/售气量3.74亿立方 米,同比减少0.66%。其中,公司售气量3.26亿立方米,同比增加11.84%;代输气量4744.79万立方米, 同比减少43.81%。今年1至7月,公司累计完成输/售气量31.88亿立方米,同比减少15.43%。 8月11日,新天绿能发布公告,今年7月,公司及子公司按合并报表口径完成发电量84.42万兆瓦时,同 比增加9.32%。其中,公司风电业务发电量为80.55万兆瓦时,同比增加6.44%;太阳能业务发电量为 3.87万兆瓦时,同比增加149.53%。今年1至7月,公司累计完成发电量909.44万兆瓦时,同比增加 9.57%。 ...
协合新能源(00182):融资成本下降,提升市场交易能力
Guosen International· 2025-08-11 07:08
Investment Rating - The investment rating for the company is maintained at a PE of approximately 5 times for 2025, with a dividend yield exceeding 6% [6][11]. Core Insights - The company reported a decline in both revenue and net profit for H1 2025, with net profit dropping 44% year-on-year to 280 million RMB, and revenue decreasing 6.6% to 1.4 billion RMB [2][6]. - The company is focusing on quality in project development, prioritizing high-return projects with stable yields, and has added 191 MW of wind power capacity while selling 28 MW [4][6]. - The company is enhancing its market trading capabilities in response to industry changes, achieving a market trading volume share of 76.2% in H1 2025, with a significant increase in green certificate trading [5][6]. Summary by Sections Financial Performance - In H1 2025, the company's net profit fell to 280 million RMB, a 44% decrease year-on-year, while revenue decreased by 6.6% to 1.4 billion RMB [2][6]. - The core power generation business saw a slight revenue decline of 2.1% to 1.34 billion RMB, primarily due to stable generation volume and a slight drop in electricity prices [2][3]. Industry Context - The overall electricity consumption in China grew by 3.7% in H1 2025, but the growth rate slowed by 4.4 percentage points [3]. - The company’s installed capacity increased by 18% year-on-year to 4,778 MW, but the utilization hours for wind and solar projects decreased by 6.4% and 19.4%, respectively [3][4]. Project Development - The company is committed to developing new projects with a focus on quality rather than scale, emphasizing investment efficiency and strong return certainty [4][6]. - As of June 2025, the company had 1,755 MW of projects under construction and expects to add 1 GW of new capacity for the year [4]. Market Strategy - The company is adapting to market changes by enhancing its trading capabilities, with a focus on building a leading trading team and optimizing trading strategies [5][6]. - The average financing cost for the company decreased by 35 basis points to 3.63%, indicating a trend of declining financial costs [5].
华电新能等在甘肃成立民勤沙戈荒绿色能源公司
Group 1 - A new company named Gansu Minqin Shage Desert Green Energy Co., Ltd. has been established with a registered capital of 200 million yuan [1] - The legal representative of the company is Liu Zhiyong, and its business scope includes power generation, power transmission, and supply (distribution) of electricity [1] - The company is co-owned by Gansu Huadian Zheneng Tengger Energy Co., Ltd. and Huadian New Energy [1]
山东政商要情(8.4—8.10)
Jing Ji Guan Cha Wang· 2025-08-10 13:11
Group 1: Private Enterprises in Shandong - Shandong Provincial Government held a symposium with 37 private entrepreneurs to address issues such as private investment, debt collection, and market expansion [2][3] - The provincial government emphasized the need for targeted actions to support private enterprises, including enhancing project construction and investment guidance [3] - In the first half of the year, private investment in Shandong increased by 0.9% year-on-year, outperforming the overall investment growth rate by 1.1 percentage points, accounting for 61.6% of total investment [3] Group 2: Renewable Energy Pricing Reform - Shandong Province issued a market-oriented reform plan for renewable energy pricing, aiming to have all wind and solar power projects enter the electricity market [4][5] - A price difference settlement mechanism was established to ensure sustainable development of renewable energy, with the average market transaction price being settled by grid companies [5] - By April 2025, Shandong's renewable energy installed capacity reached 125 million kilowatts, exceeding 51% of the total installed capacity [5] Group 3: Elderly Care Subsidy Program - Shandong is implementing a subsidy program for elderly care services, available to residents aged 60 and above with moderate to severe disabilities, regardless of their household registration [6] - The program includes 17 types of subsidies for various elderly care services, aiming to enhance the quality of care for approximately 600,000 elderly individuals in need [6] Group 4: Qingdao Health Industry Development - Qingdao's government introduced a three-year action plan to develop the "China Health Bay," targeting a health industry scale of 100 billion yuan by 2027 [7] - The plan focuses on integrating real estate, healthcare, and tourism to create a comprehensive health ecosystem [7] Group 5: Jining Inland Waterway Shipping Center - A symposium was held in Jining to discuss the establishment of a northern inland waterway shipping center, aiming for a cargo throughput of 150 million tons by 2027 [8][9] - The strategic direction for this development is outlined in the Shandong Province Port and Waterway Layout Plan (2025-2035) [8]
山东推进新能源上网电价市场化改革 发布国内首个机制电价竞价实施细则
Core Viewpoint - Shandong Province has initiated a market-oriented reform of the on-grid electricity price for renewable energy, aiming to enhance market competition and provide a framework for investment in the sector [1][3]. Group 1: Implementation of Market Mechanism - The "Implementation Plan for Market-oriented Reform of On-grid Electricity Prices for Renewable Energy" was issued on August 7, establishing that all wind and solar power projects will enter the electricity market, with prices determined through market transactions [1]. - The "Bidding Implementation Details for Mechanism Electricity Prices" released on August 8 is the first provincial-level guideline in China for the bidding of incremental renewable energy projects, providing a reference for other provinces [1]. Group 2: Innovative Bidding Mechanism - The bidding mechanism employs a "marginal clearing + dynamic adjustment" approach, ensuring competitive and fair pricing by ordering projects based on their declared prices and using the last selected project's price as the unified mechanism price [1]. - A 50% threshold is set for marginal units; if the selected volume is less than 50% of the declared amount, the unit is disqualified, preventing economic losses due to insufficient selection [1]. Group 3: Support for Distributed Photovoltaics - The guidelines introduce a "self-declaration + agency" dual participation model for distributed photovoltaics, particularly benefiting small-scale household projects by removing the performance bond requirement, thus lowering entry barriers [2]. - Distributed projects must meet "four conditions" (observable, measurable, adjustable, controllable) to integrate into the power system, promoting their market participation and enhancing system compatibility [2]. Group 4: Stability of the Bidding Mechanism - A differentiated and refined performance bond system is established, requiring uncommissioned projects to pay bonds based on capacity and utilization hours, while commissioned projects are generally exempt [2]. - Agents managing multiple projects can consolidate bonds, significantly reducing operational costs and encouraging timely compliance from uncommissioned projects [2]. Group 5: National Implications - The release of the guidelines is a proactive response to national reforms in renewable energy pricing, addressing challenges in capacity recognition, qualification requirements, and bidding implementation [3]. - The "classified bidding + marginal clearing + credit management" system developed in Shandong provides valuable experience for transitioning the national renewable energy market from policy support to market competition, promoting high-quality development in the sector [3].
云南能投(002053.SZ):永宁风电场扩建项目(泸西片区)及永宁风电场扩建项目(弥勒片区)首批风机并网发电
智通财经网· 2025-08-10 09:17
Core Viewpoint - Yunnan Energy Investment (002053.SZ) announced the successful grid connection of the first batch of wind turbines from its Yongning Wind Power Plant expansion projects, significantly increasing its total installed capacity of renewable energy [1] Group 1: Project Details - The Yongning Wind Power Plant expansion in the Luxi area includes two wind turbines with a total installed capacity of 12.5 MW, while the expansion in the Mile area includes three turbines with a total capacity of 21.45 MW [1] - The total installed capacity of the company's operational wind power has now reached 1,854.35 MW, and the total capacity of all renewable energy sources, including wind and solar, has reached 2,030.35 MW [1] Group 2: Strategic Importance - The expansion projects are aligned with national and Yunnan provincial energy development strategies, contributing to the establishment of a new power system dominated by renewable energy [1] - The projects are expected to enhance the company's core competitiveness and support the achievement of its "14th Five-Year Plan" strategic development goals, positively impacting the company's operational performance in 2025 [1] - The initiatives also play a significant role in promoting local economic development and assisting Yunnan Province in achieving its dual carbon goals [1]
云南能投:永宁风电场扩建项目(泸西片区)及永宁风电场扩建项目(弥勒片区)首批风机并网发电
Zhi Tong Cai Jing· 2025-08-10 09:14
Core Viewpoint - Yunnan Energy Investment (002053.SZ) announced the successful grid connection of the first batch of wind turbines from its Yongning Wind Farm expansion projects, contributing to the company's total installed capacity of renewable energy [1] Group 1: Project Details - The Yongning Wind Farm expansion project in the Luxi area includes the installation of 2 wind turbines with a total capacity of 12.5 MW [1] - The Yongning Wind Farm expansion project in the Mile area includes the installation of 3 wind turbines with a total capacity of 21.45 MW [1] - The total installed capacity of wind power that has been put into operation by the company now stands at 1,854.35 MW [1] Group 2: Strategic Importance - The expansion projects align with national and Yunnan provincial energy development strategies, promoting a new power system centered on renewable energy [1] - The projects are expected to enhance the company's core competitiveness and contribute positively to its operational performance in 2025 [1] - The initiatives also support local economic development and assist in achieving Yunnan Province's dual carbon goals [1] Group 3: Overall Capacity - The total installed capacity of renewable energy (including wind and solar) for the company has reached 2,030.35 MW [1]