南凭高铁
Search documents
继续延伸81公里,中越边境有重大突破
虎嗅APP· 2025-12-06 09:33
Core Viewpoint - The completion of the Nanning-Pingxiang high-speed railway marks a significant enhancement in connectivity between Guangxi and Southeast Asia, establishing a new international transport corridor to ASEAN countries [6][13]. Group 1: High-Speed Railway Overview - The Nanning-Pingxiang high-speed railway, specifically the Chong-Ping section, officially opened on December 5, 2025, with the first train departing from Pingxiang East Station [6][11]. - This railway is the second high-speed line connecting Guangxi to the China-Vietnam border, enhancing the region's transportation infrastructure [9]. - The railway spans a total length of 201 kilometers, with the Chong-Ping section measuring 81 kilometers and designed for a maximum speed of 250 km/h [48][51]. Group 2: Historical Context - The railway's completion comes 130 years after the initial plans for a cross-border railway between China and Vietnam, which faced numerous historical challenges [63][95]. - The region of Longzhou, which the railway passes through, has historical significance as a former border trading hub and was intended to be part of the first international railway in China [91][95]. Group 3: Economic and Strategic Implications - The new railway significantly reduces travel time between Nanning and Pingxiang from 4 hours to under 2 hours, facilitating trade and tourism [100][105]. - The railway is expected to boost the economic integration of Guangxi with ASEAN, enhancing trade routes and passenger transport [13][110]. - The completion of this railway aligns with China's Belt and Road Initiative, promoting cross-border connectivity and economic cooperation [36][110].
南凭高铁全线贯通运营 形成南宁直通中越边境口岸城市快速通道
Ren Min Ri Bao· 2025-12-05 22:01
Core Viewpoint - The opening of the Chongzuo to Pingxiang section of the Nanning to Pingxiang high-speed railway marks the full operation of the Nanning-Pingxiang high-speed railway, significantly reducing travel time to the Vietnam border [1] Group 1: Project Overview - The Nanning to Pingxiang high-speed railway is a key project under the "14th Five-Year Plan" aimed at enhancing connectivity with neighboring countries [1] - The railway connects Nanning, the capital of Guangxi Zhuang Autonomous Region, with the border city of Pingxiang, consisting of two segments: Nanning to Chongzuo and Chongzuo to Pingxiang [1] - The Chongzuo to Pingxiang section, which opened on the 5th, has a total length of 81 kilometers [1] Group 2: Operational Details - After the full opening, the railway operates at a maximum speed of 250 kilometers per hour, with four pairs of trains running daily [1] - The new high-speed railway significantly improves transportation conditions along the route, facilitating travel for residents in Pingxiang, Ningming, and Longzhou [1]
南凭高铁南崇段通车 南凭高铁全线开通
Yang Shi Wang· 2025-12-05 10:14
Core Points - The Nanning-Pingxiang High-Speed Railway (南凭高铁) has officially opened its entire line with the recent launch of the Chongping section, enhancing connectivity between Nanning and Pingxiang [1][3] - This railway is the first fully state-funded high-speed rail project in Guangxi, spanning 201 kilometers with a design speed of 250 km/h and featuring eight stations [3] Group 1 - The Chongping section of the Nanning-Pingxiang High-Speed Railway is 81.522 kilometers long and connects with the previously opened Nanchong section [1][3] - The project was constructed by China Railway Electrification Bureau, which managed various engineering aspects including contact networks, communication, and power supply [3][4] Group 2 - The construction of the Chongping section emphasized high standards and quality, utilizing standardized management and intelligent construction techniques [4] - Advanced technologies such as BIM and intelligent monitoring systems were employed to ensure precision in construction, particularly in challenging geological conditions [4] - The completion of the railway will significantly reduce travel time between Nanning and Pingxiang from over four hours to just over one hour, facilitating better transportation links with ASEAN countries [4]
城市24小时 | 又一个2万亿大市,要来了
Mei Ri Jing Ji Xin Wen· 2025-12-03 13:57
Group 1: Economic Development in Shandong - Shandong Province aims to enhance regional coordination and has approved the construction of Jinan and Qingdao metropolitan areas, increasing the number of cities with over 1 trillion yuan in GDP to three [1] - The "15th Five-Year Plan" for Shandong emphasizes a development framework of "two circles linked, three cores leading, land and sea coordinated, and comprehensive efforts" [1] - The plan aims to elevate key cities' development capabilities, with Qingdao's GDP targeted to exceed 2 trillion yuan and the addition of Weifang as another city surpassing 1 trillion yuan [1][2] Group 2: Qingdao's Economic Goals - Qingdao's GDP is projected to reach 1.67 trillion yuan in 2024, ranking 13th among cities in the "trillion club" [2] - Qingdao has set a goal to achieve a GDP of 2 trillion yuan within five years, focusing on becoming a high-capacity city that drives regional development and participates in international cooperation [2][3] - The city is prioritizing marine economy development and aims to establish itself as a modern marine center and a world-class international shipping hub [3] Group 3: Innovation and Investment - Qingdao is initiating the construction of a Science and Technology Innovation Corridor, which will focus on key industries such as marine, digital intelligence, and health [3] - The corridor aims to attract high-end platforms and innovative enterprises, transforming technological advantages into developmental strengths [3]
最快75分钟可达 南凭高铁12月5日全线贯通运营
Yang Shi Xin Wen· 2025-12-03 02:34
Group 1 - The Nanning-Pingxiang High-Speed Railway segment from Chongzuo to Pingxiang is set to open on December 5, marking the full operation of the Nanning-Pingxiang High-Speed Railway, which will reduce travel time to 1 hour and 15 minutes [1][4] - The railway connects Nanning, the capital of Guangxi Zhuang Autonomous Region, to the border city of Pingxiang, with a total length of 81 kilometers and a design speed of 250 kilometers per hour [4][7] - Initially, four pairs of high-speed trains will operate daily, significantly reducing travel time compared to conventional trains, with the fastest journey from Nanning to Pingxiang taking 75 minutes, a reduction of 178 minutes [7] Group 2 - The opening of the Nanning-Pingxiang High-Speed Railway will create a rapid passenger transport corridor directly connecting Nanning to the border city, enhancing the connectivity of Guangxi's railway network [7] - The railway will integrate with the national high-speed rail network through the Nanning hub, further improving the structure of Guangxi's railway system and ushering in the high-speed era for Pingxiang, Ningming, and Longzhou [7]
两条高铁已修到边境,中越互联互通提速
Di Yi Cai Jing· 2025-08-25 12:35
Core Points - The second high-speed railway connecting Guangxi to the Vietnam border is expected to open within this year, enhancing connectivity between China and Southeast Asia [1][2] - The Nanning-Pingxiang high-speed railway segment is approximately 81.52 kilometers long with a design speed of 250 km/h, significantly reducing travel time between Nanning and Pingxiang from over 4 hours to just over 1 hour [2][3] - This railway is a key infrastructure project for the China-Vietnam border region, aimed at improving trade and personnel exchanges between Guangxi and Vietnam [2][3] Infrastructure Development - The Nanning-Pingxiang high-speed railway is the first high-speed railway independently constructed by Guangxi, funded by the Guangxi Transportation Investment Group and built by the Nanning Railway Bureau [2] - The railway will connect with Vietnam's planned standard gauge railway from Lang Son to Hanoi, further enhancing cross-border transportation [2][3] - The opening of this railway follows the recent launch of the Fangchenggang to Dongxing railway, which is the first high-speed railway directly reaching the China-Vietnam border [2] Trade and Economic Impact - The acceleration of railway connectivity has led to a significant increase in cross-border freight transport, with Guangxi's exports via the China-Vietnam railway increasing by 283% in the first half of 2025 [4][5] - The number of China-Vietnam freight trains has surged, with a 1153% year-on-year increase in shipments in 2024, indicating a growing trade relationship [5] - Guangxi's foreign trade with ASEAN countries has also seen substantial growth, with total imports and exports reaching 387.15 billion yuan in the first half of 2025, a 13% increase year-on-year [5][6]