POE产品

Search documents
鼎际得POE项目进入投料开车倒计时,首船乙烯原料成功完成接卸
Zheng Quan Shi Bao Wang· 2025-09-11 11:32
Group 1 - The high-end new materials POE project of Dingjide (603255) has entered the countdown to production after a year and a half of construction [1] - The first ship carrying 4,887 tons of ethylene has successfully completed unloading and has been stored in low-temperature ethylene tanks [1] - The current raw material storage has approached 10,000 tons, with all other raw materials in place and auxiliary facilities fully debugged, preparing for production by September 30 [1] Group 2 - The construction of the POE project site is in the final stages, with the main device and electromechanical instrument systems already debugged [1] - Once all conditions for feeding are met, ethylene and catalysts can be introduced, allowing for the production of qualified products within 24 hours [1]