Workflow
CGN POWER(01816)
icon
Search documents
又一核电项目开建,“华龙一号”上“新”
中国能源报· 2025-11-18 07:25
Core Viewpoint - The construction of the first unit of the Shandong Zhaoyuan Nuclear Power Project, featuring the "Hualong One" reactor, has officially commenced, marking a significant step in China's nuclear energy development [1][3]. Project Overview - The Zhaoyuan Nuclear Power Project plans to build six "Hualong One" nuclear reactors, with an expected annual electricity generation of 50 billion kilowatt-hours, sufficient to meet the needs of approximately 5 million people [3]. - The project aims to significantly reduce coal consumption by about 15.27 million tons and cut carbon dioxide emissions by approximately 46.2 million tons annually, equivalent to reforesting over 110,000 hectares [3]. Technological Innovations - The project features a high-level natural ventilation cooling tower, standing at 203 meters with a water collection area of 16,800 square meters, which utilizes secondary circulation cooling technology for the first time in "Hualong One" reactors [3][4]. - This cooling system replaces seawater with atmospheric air as the primary cooling source, enhancing water recycling and reducing energy consumption [4]. Safety and Efficiency Enhancements - The cooling tower can maintain continuous operation for at least 2 hours without external water supply, providing a buffer for safe shutdown in extreme conditions [5]. - The project also includes a nuclear-grade mechanical ventilation cooling tower, which can provide cooling for the reactor for at least 30 days without external water supply, further ensuring safety [5]. Construction Techniques - Advanced construction techniques such as electric climbing molds and automated welding are being employed to enhance construction efficiency while ensuring safety [7]. - The project incorporates digital applications for real-time monitoring and quality management, transitioning towards intelligent construction methods [7]. Comprehensive Utilization of Nuclear Energy - The project is also focusing on the comprehensive utilization of nuclear energy, with plans for nuclear heating that can provide up to 1,000 tons of steam per hour, covering an area of over 15 million square meters [8]. - Future expansions may include industrial steam supply, nuclear hydrogen production, and seawater desalination [8].
我国再添硬“核”力量 山东招远核电基地建设全面启动
Yang Shi Wang· 2025-11-18 07:07
Core Viewpoint - The construction of China's first "Hualong One" nuclear power plant using cooling towers has officially commenced with the successful pouring of the first concrete for the nuclear island, marking the full start of the Shandong Zhaoyuan nuclear power base [1][4]. Group 1: Project Details - The nuclear island at the Zhaoyuan site covers an area of over 2,000 square meters, equivalent to five basketball courts, and the pouring of 8,823 cubic meters of concrete took approximately 55 hours, executed at six points in a single pour [4]. - The "Hualong One" project utilizes a high-level natural ventilation cooling tower for the conventional island system's cooling, replacing seawater with atmospheric air as the direct cooling source, which significantly reduces water resource usage [6]. Group 2: Environmental Impact - Upon completion, the six "Hualong One" units at the Zhaoyuan nuclear project will have a total installed capacity of approximately 7.2 million kilowatts, capable of meeting the annual electricity needs of 5 million people [10]. - The project is expected to generate 50 billion kilowatt-hours of clean electricity annually, reducing standard coal consumption by about 15.27 million tons and cutting carbon dioxide emissions by approximately 46.2 million tons, equivalent to reforesting over 110,000 hectares [10].
中国广核(003816.SZ):招远1号机组即将开始全面建设
Ge Long Hui· 2025-11-18 04:13
Core Viewpoint - China General Nuclear Power Corporation (CGN) announced that its subsidiary, Shandong Zhaoyuan Nuclear Power Co., Ltd., will commence the construction of Zhaoyuan Unit 1 on November 18, 2025, marking the start of the civil construction phase [1] Group 1 - Zhaoyuan Unit 1 will utilize the Hualong One nuclear power technology [1] - The installed capacity of a single unit is 1,214 MW [1]
港股公告掘金 | 中国软件国际携手深开鸿与奕斯伟计算达成战略合作 共建“开源鸿蒙+RISC-V”双开源数字基础设施新生态
Zhi Tong Cai Jing· 2025-11-17 15:26
Major Events - Shandong Xinhua Pharmaceutical Co., Ltd. received the approval notice for the listing application of fumaric acid vonoprazan chemical raw materials [1] - HeYue Pharmaceutical showcased long-term efficacy and safety data from the clinical III MANEUVER study of pitmiprazole at the CTOS 2025 conference [1] - China Software International partnered with Deep Open Hong and Yiswei Computing to build a new ecosystem for "open-source HarmonyOS + RISC-V" digital infrastructure [1] - China General Nuclear Power Corporation's Zhaoyuan Unit 1 is set to begin full construction [1] - Hengrui Medicine's fumaric acid teglutide injection received approval for clinical trials [1] - China National Nuclear Corporation signed an intention procurement agreement for cobalt-60 irradiation sources with the Brazilian National Nuclear Energy Commission [1] Operating Performance - China Railway Construction Corporation recently won several major projects with a total investment of 49.629 billion yuan [1] - Geely Automobile reported a net profit of 3.82 billion yuan for the third quarter, a year-on-year increase of 59% [1] - China Resources Power's subsidiary power plants achieved a cumulative electricity sales volume of 185 million megawatt-hours in the first ten months, a year-on-year increase of 6.5% [1] - Leap Motor reported a net profit of 150 million yuan for the third quarter, maintaining the top sales position among new force brands in China for eight consecutive months [1] - Huazhu Group's net profit attributable to shareholders for the third quarter was 1.5 billion yuan, a year-on-year growth of 15.4% [1] - Air China saw a year-on-year increase of 8.7% in passenger turnover in October [1] - China Eastern Airlines reported a year-on-year increase of 10.58% in passenger turnover in October [1]
中国广核:关于招远1号机组即将开始全面建设的公告
Zheng Quan Ri Bao· 2025-11-17 13:38
证券日报网讯 11月17日晚间,中国广核发布公告称,中国广核电力股份有限公司(以下简称"公司") 的子公司山东招远核电有限公司的招远1号机组即将于2025年11月18日进行核反应堆主厂房第一罐混凝 土浇筑(FCD),即招远1号机组将于该日开始全面建设,进入土建施工阶段。 (文章来源:证券日报) ...
中国广核:关于参加2025年度深圳辖区上市公司投资者网上集体接待日活动的公告
(编辑 姚尧) 证券日报网讯 11月17日晚间,中国广核发布公告称,为进一步加强与投资者的互动交流,中国广核电 力股份有限公司(以下简称"公司")将参加由深圳证监局和中证中小投资者服务中心指导、深圳上市公 司协会与深圳市全景网络有限公司联合举办的"2025年度深圳辖区上市公司投资者网上集体接待日活 动"。活动时间为2025年11月20日。 ...
中广核电力(01816) - 海外监管公告 - 关於参加2025年度深圳辖区上市公司投资者网上集体接...
2025-11-17 10:16
香港交易及結算所有限公司及香港聯合交易所有限公司對本公告的內容概不負責,對其準確性 或完整性亦不發表任何聲明,並明確表示,概不對因本公告全部或任何部份內容而產生或因依 賴該等內容而引致的任何損失承擔任何責任。 CGN Power Co., Ltd.* 中國廣核電力股份有限公司 (在中華人民共和國註冊成立的股份有限公司) (股份代號:1816) 海外監管公告 本公告由中國廣核電力股份有限公司(「本公司」)根據香港聯合交易所有限公司證 券上市規則第13.10B條作出。 以下為本公司於深圳證券交易所網站發佈之《關於參加2025年度深圳轄區上市公 司投資者網上集體接待日活動的公告》,僅供參閱。 承董事會命 中國廣核電力股份有限公司 尹恩剛 財務總監、聯席公司秘書及董事會秘書 中國,2025年11月17日 於本公告日期,本公司董事會成員包括執行董事為高立剛先生;非執行董事為楊 長利先生、李歷女士、龐松濤先生、馮堅先生及劉煥冰先生;獨立非執行董事為 王鳴峰先生、李馥友先生及徐華女士。 | | | 债券代码:127110 债券简称:广核转债 中国广核电力股份有限公司 关于参加 2025 年度深圳辖区上市公司投资者网上集体接 ...
中广核电力:招远1号机组即将开始全面建设
Zhi Tong Cai Jing· 2025-11-17 10:08
中广核电力(01816)公布,公司附属公司山东招远核电有限公司的招远1号机组即将于2025年11月18日进 行核反应堆主厂房第一罐混凝土浇筑(FCD),即招远1号机组将于该日开始全面建设,进入土建施工阶 段。招远1号机组采用华龙一号核电技术,单台机组装机容量为1,214MW。 ...
中广核电力(01816.HK):附属招远1号机组即将开始全面建设
Ge Long Hui· 2025-11-17 10:08
格隆汇11月17日丨中广核电力(01816.HK)宣布,公司附属公司山东招远核电有限公司的招远1号机组即 将于2025年11月18日进行核反应堆主厂房第一罐混凝土浇筑(FCD),即招远1号机组将于该日开始全面 建设,进入土建施工阶段。招远1号机组采用华龙一号核电技术,单台机组装机容量为1,214MW。 ...
中广核电力(01816):招远1号机组即将开始全面建设
智通财经网· 2025-11-17 10:05
智通财经APP讯,中广核电力(01816)公布,公司附属公司山东招远核电有限公司的招远1号机组即将于 2025年11月18日进行核反应堆主厂房第一罐混凝土浇筑(FCD),即招远1号机组将于该日开始全面建 设,进入土建施工阶段。 招远1号机组采用华龙一号核电技术,单台机组装机容量为1,214MW。 ...