Workflow
HEGC(000883)
icon
Search documents
湖北能源(000883) - 2019年7月23日投资者关系活动记录表(一)
2022-12-04 09:04
Group 1: Hydropower Performance - In the first half of the year, hydropower generation was significantly affected, with a cumulative output of 3.842 billion kWh, a year-on-year decrease due to low water levels and insufficient rainfall [2] - The hydropower sector is expected to enter the flood season after February, but the company cannot accurately predict the annual water situation [2] Group 2: Thermal Power Generation - Thermal power generation saw a substantial increase, with a cumulative output of 1.504 billion kWh, representing a year-on-year growth of 77.14% [2] - The company anticipates that thermal power generation will continue to maintain high growth rates throughout the year [2] Group 3: Market Transactions and Pricing - In 2018, the company’s cumulative direct trading volume was 5.194 billion kWh, accounting for 25.79% of the total annual generation of 20.143 billion kWh [3] - The market transaction volume is expected to see significant growth in 2019 due to new thermal power installations [3] Group 4: Future Installations - Future hydropower projects include Jiangpinghe Hydropower Station (450,000 kW), Linxi River Hydropower Station (175,200 kW), and Xiakoutang Hydropower Station (58,000 kW) [3] - The company plans to add two thermal power units in Yingkou, totaling 1,000,000 kW [3] Group 5: Coal Supply and Costs - The Menghua Railway, as the longest coal transportation line in China, will improve coal supply channels for Hubei and surrounding provinces, benefiting local coal-fired power plants [3] - The impact of coal price reductions on thermal power generation costs remains uncertain due to various influencing factors [3]
湖北能源(000883) - 2019年5月28日投资者关系活动记录表
2022-12-03 10:20
Group 1: Company Operations - The coal storage and distribution base in Jingzhou, Hubei, is designed to connect with the Menghua Railway, facilitating coal supply to Hubei, Jiangxi, Hunan, and Anhui provinces [2] - The construction of the Jingzhou coal storage base is synchronized with the Menghua Railway project, which is expected to lower procurement costs for the company once completed [2] - The company’s coal procurement mainly comes from Shanxi, Shaanxi, Anhui, and Henan provinces, with long-term contracts accounting for over 70% of the procurement [2] Group 2: Power Trading - Direct electricity trading in Hubei province is set to fully commence in June 2019, currently in the training phase [2] - The company is preparing for the direct electricity trading, which is anticipated to enhance operational efficiency [2]