Workflow
电力
icon
Search documents
山西出台意见,加快能源科技创新支撑转型发展
Zhong Guo Dian Li Bao· 2026-01-06 09:05
Core Viewpoint - Shanxi Province has introduced the "Implementation Opinions on Accelerating Energy Technology Innovation to Support Energy Transition Development," aiming to enhance energy technology innovation capabilities and explore new paths for energy transition by 2030 [1][4]. Group 1: Energy Technology Innovation Goals - By 2030, Shanxi aims to establish a more complete energy technology innovation system, achieving over 100 landmark technological achievements and a technology transaction volume exceeding 50 billion yuan [1][7]. - The implementation focuses on nine new paths for energy transition, including coal mining, flexible and efficient power generation, coal chemical industry, and carbon capture [1][3]. Group 2: Policies for Technology Transfer and Enterprise Innovation - The implementation outlines 44 policy measures to promote deep integration of technology and industry innovation, focusing on technology transfer, enterprise innovation, and resource assurance [2][3]. - It emphasizes the role of leading enterprises in innovation, proposing 13 measures to support enterprises in forming innovation consortia and enhancing their innovation capabilities [2][16]. Group 3: Resource Assurance for Innovation - The implementation includes 14 policy measures to improve the innovation resource assurance system, such as establishing a task-oriented support mechanism and a long-term support mechanism for talent teams [3][19]. - It aims to integrate innovation chains, industry chains, and funding chains to create a favorable environment for energy transition technology innovation [3][20]. Group 4: Key Technology Breakthroughs - The implementation identifies key technology areas for breakthroughs, including advanced coal mining techniques, flexible power generation technologies, and carbon capture and utilization technologies [8][12]. - Specific initiatives include the development of high-efficiency coal power generation technologies and the promotion of intelligent mining equipment [10][11]. Group 5: Strengthening Enterprise Innovation - The implementation encourages enterprises to take the lead in technology innovation decisions and research organization, with measures to support technology transfer and collaboration with research institutions [16][17]. - It aims to enhance the role of technology-driven enterprises and promote the establishment of innovation platforms [16][18].
电力板块1月6日涨0.77%,金房能源领涨,主力资金净流入2.7亿元
证券之星消息,1月6日电力板块较上一交易日上涨0.77%,金房能源领涨。当日上证指数报收于 4083.67,上涨1.5%。深证成指报收于14022.55,上涨1.4%。电力板块个股涨跌见下表: | 代码 | 名称 | 收盘价 | 涨跌幅 | 成交量(手) | 成交额(元) | | | --- | --- | --- | --- | --- | --- | --- | | 001210 | 金房能源 | 20.72 | 9.98% | 8.94万 | | 1.81亿 | | 002256 | 兆新股份 | 3.78 | 7.69% | 246.26万 | | 9.25 6 | | 601778 | 晶科科技 | 4.13 | 6.44% | 300.85万 | | 12.29亿 | | 001376 | 百通能源 | 17.95 | 5.28% | 27.34万 | | 4.85亿 | | 619109 | 嘉泽新能 | 4.87 | 5.18% | 146.17万 | | 7.06亿 | | 600149 | 廊坊发展 | 5.19 | 3.59% | 12.48万 | | 6416.14万 | | 6000 ...
西北电网2025年跨区直流及750千伏工程投产规模创历史新高
Core Insights - The Northwest Power Grid is set to achieve a record scale of cross-regional direct current and 750 kV projects by 2025, with the addition of 4 cross-regional direct current projects and 35 new 750 kV projects, enhancing national energy security and supporting high-quality regional economic development [1][3] Group 1: Project Developments - By 2025, the Northwest Power Grid's direct current transmission capacity will exceed 95 million kilowatts, an increase of 24.6 million kilowatts compared to 2024, surpassing the total increase during the "13th Five-Year Plan" period [1] - Key 750 kV projects, including the Shaanxi Xiazhou to Gansu Qingyang North and Xinjiang Huan Tarim Basin ring network, will further optimize the main grid structure, enhancing both power transmission capacity and supply reliability [3] Group 2: Infrastructure Expansion - In 2025, the Northwest Power Grid will see the construction of 15 new substations, 36 main transformers, and 57 new lines, marking a historic high in scale [3] - The total scale of the Northwest Power Grid is expected to grow by over 50% compared to the end of the "13th Five-Year Plan," reinforcing its role in power security and cross-regional resource optimization [3]
淮河能源:休宁里庄抽水蓄能电站项目暂未启动开工建设
Mei Ri Jing Ji Xin Wen· 2026-01-06 08:49
淮河能源(600575.SH)1月6日在投资者互动平台表示,投资者您好,长电(休宁)能源发展有限责任 公司系公司全资子公司电力集团的参股公司。据公司了解的情况,截至目前,该公司负责的休宁里庄抽 水蓄能电站项目暂未启动开工建设,安徽省发改委已同意该项目延期至2026年12月31日前开工建设。感 谢对本公司的关注! 每经AI快讯,有投资者在投资者互动平台提问:贵公司参股的休宁里庄抽水蓄能电站什么时候有实质 性进展啊,马上距离省发改委批复就到期了。 (文章来源:每日经济新闻) ...
福建电源装机容量突破1亿千瓦 清洁能源占比超65%
Core Viewpoint - Fujian Province has achieved significant economic growth supported by clean energy, with a clean energy installed capacity target of over 100 million kilowatts by the end of 2025, accounting for 65.8% of total installed capacity [1] Group 1: Clean Energy Development - As of the end of 2025, Fujian's total installed power capacity is expected to exceed 100 million kilowatts, with clean energy making up 65.8% of this capacity [1] - The province is accelerating the construction of a new power system demonstration area, enhancing grid resource allocation capabilities to support green and low-carbon energy development [1] - The Fujian-Guangdong interconnection project will facilitate energy resource optimization and efficient clean energy utilization between the two provinces [2][6] Group 2: Grid Infrastructure - The State Grid Fujian Electric Power Company is focused on building a robust grid infrastructure, connecting to major economic regions and enhancing the capacity for clean energy transmission [4] - The 1000 kV Fuzhou-Xiamen ultra-high voltage AC project, operational by December 2023, will increase the grid's capacity to transmit power from the north to the south by 3 million kilowatts [8] - The construction of a flexible resource adjustment system aims to improve the grid's ability to absorb clean energy and manage its variability [10] Group 3: Microgrid Initiatives - The integration of wind, solar, and storage systems in microgrids is being implemented across various scenarios, including islands and urban areas, to enhance clean energy utilization [16][18] - The first large-scale shared energy storage station in Fujian will support the development of offshore wind energy and improve its absorption capacity [22] - The microgrid projects in Nan'an and Meizhou Island are designed to achieve 100% local consumption of distributed solar energy, enhancing energy efficiency [23]
绿发电力:累计回购约664万股
Mei Ri Jing Ji Xin Wen· 2026-01-06 08:38
每经AI快讯,绿发电力1月6日晚间发布公告称,截至2025年12月31日,公司通过股份回购专用证券账 户以集中竞价方式累计回购公司股份约664万股,占公司总股本约20.67亿股的0.32%,最高成交价8.46 元/股,最低成交价8.25元/股,成交总金额约5541万元。 每经头条(nbdtoutiao)——原指导价34.99万的宝马裸车价22.5万元,多家车企还补贴购置税!2026开 年车市火爆,销售从早到晚忙到没空吃饭 (记者 曾健辉) ...
人民网┃“绿”潮涌动 能源低碳转型释放发展活力
Xin Lang Cai Jing· 2026-01-06 08:06
Group 1 - The core viewpoint emphasizes the acceleration of energy transition in China, focusing on the optimization of energy structure and the promotion of renewable energy to replace fossil fuels, which aids in reducing carbon emissions and ensuring energy security [1][4] - The latest data from the National Energy Administration indicates that by the end of November 2025, the total installed power generation capacity in China will reach 3.79 billion kilowatts, a year-on-year increase of 17.1%. Among this, solar power capacity will be 1.16 billion kilowatts, up 41.9%, and wind power capacity will be 600 million kilowatts, up 22.4% [1] - The development of clean and efficient coal utilization is crucial for achieving carbon neutrality goals, with new policies aimed at enhancing coal utilization efficiency and promoting high-value coal products [2] Group 2 - Yunnan province is advancing its energy transition towards a "new energy dominant" structure, with renewable energy installations exceeding 70 million kilowatts and clean energy accounting for 90% of the total installed capacity [3] - The integration of solar thermal power and photovoltaic projects in Gansu is expected to produce 1.45 billion kilowatt-hours of clean electricity annually, equivalent to saving 480,000 tons of standard coal [3] - The "fishing and solar" project in Dalian is projected to save 51,100 tons of standard coal and reduce carbon dioxide emissions by 134,900 tons annually, while generating over 13 million yuan in profit [3] Group 3 - The energy transition is creating new employment opportunities and contributing to regional economic growth, with a focus on sustainable development through the development and utilization of renewable energy [4] - It is essential to ensure that the power grid can accommodate the increased renewable energy supply, with recommendations for enhancing grid flexibility, safety, and intelligence to address the variability of renewable sources [4]
中国长江电力股份有限公司 2025年发电量完成情况公告
股票代码:600900 股票简称:长江电力公告编号:2026-001 中国长江电力股份有限公司 2025年发电量完成情况公告 本公司董事会及全体董事保证本公告内容不存在任何虚假记载、误导性陈述或者重大遗漏,并对其内容 的真实性、准确性和完整性承担法律责任。 根据公司初步统计,2025年,乌东德水库来水总量约1051.35亿立方米,较上年同期偏枯6.44%;三峡水 库来水总量约3962.68亿立方米,较上年同期偏丰5.93%。 2025年,公司境内所属六座梯级电站总发电量约3071.94亿千瓦时,较上年同期增长3.82%。其中,第四 季度公司境内所属六座梯级电站总发电量约720.68亿千瓦时,较上年同期增长19.93%。各电站发电量具 体如下: ■ 注:原始数据为小数点后四位,本表格按照惯例保留两位,为了保持原始数据精度,求和值未做调整。 特此公告。 中国长江电力股份有限公司董事会 2026年1月5日 ...
广西桂冠电力股份有限公司 2025年年度发电量完成情况公告
特此公告。 股票代码:600236 股票简称:桂冠电力 编号:2026-001 广西桂冠电力股份有限公司 2025年年度发电量完成情况公告 2025年公司发电量同比增长的主要原因:一是2025年公司主要水电厂流域来水同比增长,发电量同比增 长;二是2025年新能源装机规模增加,新能源发电量同比增长。 现将公司2025年年度累计发电量完成情况公告如下: ■ 本公司董事会及全体董事保证本公告内容不存在任何虚假记载、误导性陈述或者重大遗漏,并对其内容 的真实性、准确性和完整性承担个别及连带责任。 截至2025年12月31日,广西桂冠电力股份有限公司(以下简称公司)直属及控股公司电厂累计完成发电 量461.42亿千瓦时,同比增长26.68%。其中:水电415.68亿千瓦时,同比增长35.92%;火电10.92亿千瓦 时,同比下降58.89%;风电19.67亿千瓦时,同比下降4.42%;光伏15.15亿千瓦时,同比增长34.43%。 广西桂冠电力股份有限公司董事会 2026年01月06日 ...
花旗:纳入华能国际电力股份至30日下行催化剂观察名单
Zhi Tong Cai Jing· 2026-01-06 07:53
花旗发布研报称,由于华能国际(600011)电力股份(00902)2026年的市场基本电价似乎低于市场预 期,因此将公司纳入30日下行催化剂观察名单。该行予华能目标价7.2港元,评级为"买入"。 该行表示,华能国际电力股份2025年前三季的中国电力销售中,有63.5%来自广东、浙江和江苏三省, 而2026这三省的加权平均市场基本电价同比下降13.4%。同时,中国煤电厂的电产能将同比增长65%。 该行预计,华能2026年的平均煤电电价将同比减少8.9%。 ...