Workflow
公路建设
icon
Search documents
三大交旅融合示范区年底建成
Si Chuan Ri Bao· 2025-09-15 00:44
Group 1 - The core viewpoint is that Sichuan province is set to complete three integrated transportation and tourism demonstration zones by the end of the year, namely Dagger Emei, Dagger Shangri-La, and Dagger Jiuzhai, with a focus on enhancing travel experiences through improved infrastructure [1] - In 2023, Sichuan was the first in the country to propose the establishment of integrated transportation and tourism demonstration zones, planning four major zones including Dagger Emei, Dagger Shangri-La, Dagger Jiuzhai, and Dagger Shudao [1] - The Dagger Emei demonstration zone features a 333-kilometer "Three Mountains Tourism Ring Line," which has been upgraded from a lower-grade road to a first-class road, significantly reducing travel times and increasing tourist traffic to nearby attractions [1] Group 2 - Sichuan aims to accelerate the construction of thematic tourist roads such as G227 Liya Road, G544 Chuanjiu Road, and Yellow River Grassland Tourist Road, with a target of completing 500 kilometers of national and provincial trunk roads and 1,400 kilometers of beautiful rural roads by the end of the year [2] - The province is focusing on the integration of transportation, tourism, and services, with plans to enhance service supply by upgrading highway service areas and constructing over 10 ordinary road service facilities this year [2] - There will be an increase in direct transport services connecting cultural and tourism resource-rich areas to hubs and scenic spots, along with the promotion of flexible car rental services [2]
【砥砺奋进七十载 天山南北谱华章】天堑织网变通途
Yang Shi Wang· 2025-09-14 11:57
Core Points - Xinjiang has accelerated the construction of a modern comprehensive transportation network since the 18th National Congress of the Communist Party, transforming previously isolated areas into accessible regions [1][2] - The Uwei Expressway is nearing completion, expected to be operational in just over two months, enhancing connectivity between northern and southern Xinjiang [1] - New industrial parks and cold chain bases are being established along the expressway, indicating economic development in previously underserved areas [1] - The region has seen significant improvements in transportation infrastructure, including the first high-altitude airport in Xinjiang and the completion of the world's first desert-ring railway [1][2] Transportation Infrastructure - Xinjiang's railway operating mileage has reached 9,557 kilometers, covering over 80% of county-level administrative regions [2] - The region boasts 28 airports, the highest number in the country, with 628 operational flight routes [2] - The total length of highways in Xinjiang has reached 231,900 kilometers, with expressways connecting all prefecture-level cities [2] - Rural roads are improving access to local agricultural products, facilitating their distribution to major markets [2]
国道338线中卫至孟家湾段公路全线沥青铺设完毕
Zhong Guo Xin Wen Wang· 2025-09-12 00:37
Core Points - The asphalt paving of the Heishanxia Yellow River Bridge on the G338 highway from Zhongwei to Mengjiawan has been completed, with the entire G338 line expected to open by the end of the year [1] - The G338 project has a total length of 15.45 kilometers, with an additional 2.011 kilometers for the Shapotou South Bank Peninsula connecting line [1] - The project has faced significant construction challenges due to its high elevation, numerous bridges, and narrow working areas, making it one of the more difficult and larger-scale ordinary national highway construction projects in recent years [1] Investment and Economic Impact - The total fixed asset investment for the G338 highway from Zhongwei to Mengjiawan has reached 830 million yuan, with an engineering completion rate of 98% [1] - The completion of the project is expected to enhance the traffic capacity of the G338 line, ensuring safe and efficient transportation in Ningxia, and promoting economic and social development in Zhongwei and the broader Ningxia region [1] Technological Innovations - The project utilized high-elasticity and high-viscosity modified asphalt concrete for the Heishanxia Yellow River Bridge, and colored snow-melting modified asphalt concrete for high-standard applications on specific road sections [1] - These technological advancements not only improve road performance but also successfully integrate road functionality with ecological environment, creating a transportation landscape that reflects regional characteristics [1]
吉林高速公路股份有限公司 关于控股子公司工程施工项目中标的公告
Group 1 - The company, Jilin Expressway Co., Ltd., through its subsidiary Jilin Kewi Transportation Engineering Co., Ltd., won a bid for the construction of two highway segments, with a total bid price of 9,591,596,886 yuan [2][3] - The project includes the G12 highway segment from Fanchuan to Hunchun, with a duration of 1,095 days, and the G1131 highway segment from Laoyeling to Wangqing, with a duration of 1,460 days [2][3] - The bidding was conducted by Jilin Provincial Highway Group Co., Ltd., and the project constitutes a related party transaction [2][3] Group 2 - The joint venture for the project includes 10 companies, with China Communications Construction Company as the lead member, and Jilin Kewi Transportation Engineering Co., Ltd. holding a 3.39% share in the joint venture [3][4] - The project is expected to enhance the company's construction performance and positively impact its future business development [7]
国道338线中卫至孟家湾段公路全线沥青铺设完毕 预计年底通车
Zhong Guo Xin Wen Wang· 2025-09-11 21:23
中新网中卫9月11日电(记者于晶)9月11日,国道338线中卫至孟家湾段公路黑山峡黄河特大桥沥青铺设 完毕。至此,该国道全线的沥青全部铺设完毕,预计年底实现通车。 国道338项目主线全长15.45公里,沙坡头南岸半岛连接线工程全长2.011公里。起点顺接国道338线宁卫 段终点,途经中卫市常乐镇、迎水桥镇。先后跨越西气东输管道、明长城遗址及定武高速,经过黄河进 入沙坡头国家级自然保护区,终点于孟家湾村处接原338线。 据了解,由于国道338线中卫至孟家湾穿越香山北缘,线位高,桥多墩高,施工作业面狭窄,是近年来 施工难度、投资规模都较大的普通国道建设项目。此次沥青路面铺设最大的亮点是在黑山峡黄河特大桥 上应用了高弹高粘改性沥青混凝土,以及在沙坡头南岸半岛连接线的平交道口及纵坡超4%路段高标准 应用了彩色融雪改性沥青混凝土。这些技术的使用不仅提高路面性能,还成功实现道路功能与生态环境 的有机融合,打造了彰显区域特色的交通景观廊道。 截至目前,国道338线中卫至孟家湾段公路已累计完成固定资产投资8.3亿元,工程完成率达98%。工程 竣工后对提高国道338线通行能力、保障宁夏国道畅通安全便捷高效,促进中卫乃至宁夏经济 ...
吉林高速:控股子公司联合中标95.92亿元工程施工项目
Xin Lang Cai Jing· 2025-09-11 07:57
Core Viewpoint - Jilin Expressway (601518) announced that its subsidiary, Jilin Kowi Transportation Engineering Co., Ltd., won a bid for two highway construction projects with a total bid price of 9.592 billion yuan [1] Group 1: Company Announcement - The company’s subsidiary, Kowi Company, is part of a consortium that won the bid for the G12 highway segment from Fanchuan to Hunchun and the G1131 highway segment from Laoyeling (Heilongjiang-Jilin border) to Wangqing [1] - The bid price for the projects is 9.592 billion yuan, indicating a significant contract win for the company [1] - Kowi Company holds approximately 3.39% of the consortium [1]
吉林高速(601518.SH)子公司联合体中标95.92亿元相关施工总承包项目
智通财经网· 2025-09-11 07:56
Group 1 - The core point of the article is that Jilin Expressway (601518.SH) announced that its subsidiary, Jilin Kowi Transportation Engineering Co., Ltd., won a bid for two highway construction projects with a total bid price of 9.592 billion yuan [1] Group 2 - The projects include the G12 highway section from Fanchuan to Hunchun and the G1131 highway section from Laoyeling (Heilongjiang-Jilin border) to Wangqing [1] - A total of 10 units participated in the bidding process for the construction contract [1]
吉林高速子公司联合体中标95.92亿元相关施工总承包项目
Zhi Tong Cai Jing· 2025-09-11 07:52
Core Viewpoint - Jilin Expressway (601518.SH) announced that its subsidiary, Jilin Kowi Transportation Engineering Co., Ltd., won a public bidding contract for two highway construction projects with a total bid price of 9.592 billion yuan [1] Group 1 - The company’s subsidiary, Kowi Company, won the bid for the G12 highway segment from Fanchuan to Hunchun and the G1131 highway segment from Laoyeling (Heilongjiang-Jilin border) to Wangqing [1] - A total of 10 units participated in the bidding process for the contract [1] - The total contract value is 9.592 billion yuan, indicating a significant project for the company [1]
湖北孝昌以“四好农村路”建设推动城乡融合—— 昔日“烦心路” 今日“幸福线”
Jing Ji Ri Bao· 2025-09-10 22:10
Core Viewpoint - The article highlights the significant improvements in rural transportation infrastructure in Xiaochang County, Hubei Province, which have facilitated economic development and enhanced the quality of life for residents [1][2][4]. Group 1: Infrastructure Development - Xiaochang County has invested 9.6 billion yuan to upgrade over 1,200 kilometers of rural roads, creating a modern rural road network exceeding 3,200 kilometers [1]. - The implementation of a "road long system" at county, township, and village levels has established a management mechanism involving government, departments, and community participation [2]. Group 2: Economic Impact - The upgraded transportation has led to the emergence of over 50 family-run farms and agritourism businesses along the newly constructed Zhangzhou Line, significantly boosting local income [1]. - The annual sales of high mountain green tea in Xiaochang County have surpassed 10 million yuan, with individual farmers seeing an income increase of over 30,000 yuan due to improved access to markets [2]. Group 3: Tourism Development - The county has developed multiple tourism routes that integrate red culture, ecological tourism, and local industries, attracting over 1.1 million visitors annually and generating 5.15 billion yuan in tourism revenue [4]. - The establishment of various agritourism and cultural experiences has enhanced local economic vitality, with specific projects like the peach orchard generating an annual output value of 1.6 billion yuan [3][4].
达卡绕城高速公路打造孟加拉国通衢
人民网-国际频道 原创稿· 2025-09-07 09:58
Core Points - The Dhaka Bypass Expressway, partially opened on August 24, significantly reduces travel time from 1.5 hours to 20 minutes, enhancing transportation efficiency for goods like chicken feet [1][4] - The project, spanning approximately 48 kilometers with a total investment of $412 million, connects key industrial areas in northern and northeastern Bangladesh and serves as a vital route between Dhaka and Chittagong, the country's second-largest city [2][4] - The expressway is the first public-private partnership (PPP) road project in Bangladesh since the PPP law was enacted and represents a significant achievement in the "Golden Bangladesh" vision and the Belt and Road Initiative [4] Economic Impact - The expressway alleviates traffic congestion in Dhaka, a city with over 20 million residents, thereby facilitating economic development and improving living standards [4] - Local residents, such as those in Dorjibari village, benefit from reduced travel times, allowing for better market access for agricultural products like mangoes and jackfruits, which can now be sold at higher prices [4] - The project is expected to create approximately 800 long-term jobs in toll management and smart operations, contributing to local employment and skill development [6] Technological and Environmental Innovations - The construction utilized local materials, such as fine sand from riverbeds, to address the scarcity of gravel, and introduced cement-stabilized sand technology to improve road durability [5] - The project incorporates clean energy and waste recycling measures, aligning with Bangladesh's ecological and sustainable development goals [5] - The introduction of Chinese technology and standards during construction is expected to enhance local infrastructure development and provide a model for future projects [5][6] Strategic Significance - The expressway is seen as a physical manifestation of the friendship between China and Bangladesh, symbolizing mutual aspirations for a better future and the strengthening of bilateral strategic cooperation [7]