Workflow
公路建设
icon
Search documents
星火成炬|中国基建的硬核浪漫
Yang Shi Wang· 2025-08-14 09:09
Group 1 - The article highlights China's impressive infrastructure achievements, including the construction of the Hong Kong-Zhuhai-Macao Bridge and the Huajiang Gorge Bridge, which have set multiple world records [2] - It mentions the extensive railway operating mileage of 162,000 kilometers and the vast network of hardened rural roads totaling 4,643,700 kilometers, showcasing the country's commitment to infrastructure development [2] - The narrative emphasizes the idea of "hardcore romance" in China's infrastructure, illustrating the dedication to making roads accessible to all areas in need [2]
科技打造中国交通“新标杆”
Ke Ji Ri Bao· 2025-08-14 01:11
Core Points - The article highlights significant achievements in China's transportation sector during the "14th Five-Year Plan" period, emphasizing technological advancements and infrastructure development [4][10] - It discusses the integration of new technologies such as digital economy, artificial intelligence, and smart logistics into the transportation industry, aiming for enhanced efficiency and connectivity [4][3] - The article showcases specific projects like the CR450 high-speed train and the Shenzhen-Zhongshan Link, which have set world records and improved transportation efficiency [6][8] Group 1: Transportation Infrastructure Achievements - The completion of the Shenzhen-Zhongshan Link, a major engineering project, has created multiple world records and significantly improved travel time across the Pearl River Delta [8] - The CR450 high-speed train, capable of reaching speeds of 450 km/h, represents a breakthrough in high-speed rail technology, marking China's leadership in this field [6][7] - By the end of 2024, over one-third of provinces in China will have high-speed rail connections, with a record of over 23 million passengers transported in a single day [7][4] Group 2: Technological Innovations - The article emphasizes the importance of autonomous innovation in achieving breakthroughs in high-speed rail technology, with a focus on overcoming geological challenges [7][6] - The development of the world's longest highway tunnel, the Tianshan Victory Tunnel, showcases China's engineering capabilities and commitment to infrastructure improvement [9] - The introduction of green transportation solutions, such as the first domestic dual-fuel ship and zero-carbon highways, reflects China's commitment to sustainable development in the transportation sector [11][12] Group 3: Future Directions - The article outlines plans for further integration of smart technologies and green initiatives in transportation, aiming to enhance efficiency and reduce carbon emissions [12][11] - The transportation sector is expected to play a crucial role in supporting China's broader goals of modernization and national rejuvenation, with a focus on safety, intelligence, and sustainability [12][4] - The commitment to maintaining technological leadership through independent innovation is emphasized as essential for future advancements in the transportation industry [10][6]
驻陕央企承建的马拉维姆卡公路开工
Shan Xi Ri Bao· 2025-08-13 22:22
该工程全线预计2027年7月底建成通车。通车后,沿线咖啡、木薯等特色农产品可实现当日采摘、 次日入市,林木及矿产资源运输效率将提升40%,直接带动沿线特色产业产值增长。 中铁二十局项目负责人商向前表示,针对该区域雨季道路泥泞、运输成本高的现状,项目将采用路 基加固、边坡防护等工程技术,解决季节性通行难题,为沿线16个村庄超2.5万名居民带来便利。(记 者 陶玉琼 通讯员 高珊) 记者从驻陕央企中铁二十局获悉:马拉维当地时间8月10日,由该局承建的姆坦加坦加至卡富库莱 公路正式开工建设。 姆卡公路全长52公里,途经姆坦萨,线路向北直达马拉维第三大城市姆祖祖,建成后将成为马拉维 北部山区与中部经济带物资流通的"黄金走廊"。 ...
广发证券:重申建筑业共同富裕投资主线 重视相关省区基建等工程服务标的
智通财经网· 2025-08-12 07:46
Group 1: Infrastructure Investment - The report emphasizes the importance of infrastructure investment in regions such as Xinjiang, Tibet, and Sichuan-Chongqing as part of the new era of western development [1] - In Xinjiang, railway investment is expected to remain strong, with significant projects like the New Tibet Railway and Yining-Aksu Railway set to commence this year [2] - The planned public road investment in Xinjiang for 2025 is projected at 80 billion yuan, reflecting a year-on-year increase of 13.5% [3] Group 2: Coal Chemical Industry - The coal chemical industry in Xinjiang is accelerating, with a projected coal output of 541 million tons in 2024, marking a year-on-year growth of 17.5% [4] - The coal consumption for thermal power generation in Xinjiang is expected to reach 195 million tons in 2024, accounting for approximately 36% of the total coal production [4] Group 3: Mining Development and Services - The acceleration of resource exploration and development in Xinjiang is highlighted, with the region set to add six large resource bases during the 14th Five-Year Plan [5] - Xinjiang has led the nation in the number of mining rights granted, with 146, 227, and 558 rights issued from 2022 to 2024 respectively [5]
凌绥高速公路全线沥青路面摊铺完成
Xin Hua Cai Jing· 2025-08-12 06:21
Core Viewpoint - The completion of the asphalt pavement for the Liaoning Ling Sui Expressway marks a significant milestone, paving the way for subsequent construction activities and ensuring the expressway is on track for opening in September [1] Group 1: Project Overview - The Ling Sui Expressway spans a total length of 175.439 kilometers and is a crucial part of the national expressway network, connecting major routes from Daqing to Guangzhou, Changchun to Shenzhen, and Beijing to Harbin [1] - The project is funded by China Railway Construction Investment Group and constructed by China Railway 16th Bureau Group [1] Group 2: Construction Quality and Challenges - The project team has implemented strict quality control measures for asphalt mixture ratios and all construction phases, including mixing, transportation, and paving, to ensure high standards [1] - The construction faced challenges such as tight schedules, heavy workloads, and adverse weather conditions, which were effectively managed through a comprehensive quality control system [1] Group 3: Economic Impact - Once completed, the Ling Sui Expressway is expected to significantly improve traffic conditions in the western Liaoning and eastern Inner Mongolia regions, thereby stimulating regional economic development [1]
吴(起)华(池)高速公路全线隧道贯通
Xin Hua Wang· 2025-08-12 06:08
新华社西安7月31日电(记者刘彤)由中铁二十局承建的陕西吴起至甘肃华池高速公路庄科峁隧道 双洞31日顺利贯通,标志着这条高速公路全线3座隧道全部贯通,为早日实现通车奠定了基础。 全长约47.6公里的吴华高速公路,是连接陕甘两省的交通大动脉。项目建成后,将极大改善革命老 区交通条件,进一步优化陕甘两省路网结构,对带动沿线地区乡村全面振兴和经济社会高质量发展具有 重大意义。 中铁二十局项目负责人张雷说,施工单位成立技术攻关小组,按照"短开挖、强支护、早封闭、勤 量测"原则,通过智能监测系统等数字化手段,实现全过程精细化管控,成功攻克渗水、坍塌等难题, 确保隧道施工安全高效推进。 【纠错】 【责任编辑:刘阳】 地处陕西省志丹县境内的庄科峁隧道、马宋梁隧道、庙沟梁隧道,是吴华高速公路的关键性工程。 3座隧道均穿越黄土高原沟壑区,属于典型的湿陷性黄土隧道,地质条件复杂,隧身土质富含水、强度 低、易变形,围岩自稳能力差,大断面开挖面临极高的安全风险。 ...
中国经济半年报丨流动中国彰显经济发展活力——透视上半年我国交通运输运行数据
Xin Hua Wang· 2025-08-12 05:40
Core Insights - The transportation sector in China shows stable growth in the first half of the year, reflecting the vitality of economic development [1][5] Group 1: Passenger Transportation - Beijing Capital International Airport reported a passenger throughput of 34.17 million, a year-on-year increase of 4.5% [1] - The total cross-regional passenger flow in China reached 33.76 billion, growing by 4.2% year-on-year [1] - The civil aviation industry saw a total passenger volume of 370 million, with international route passenger volume increasing by 28.5% [1] Group 2: Rail Transportation - National railways sent 2.24 billion passengers, marking a 6.7% year-on-year increase, achieving a historical high for the same period [2] - An average of 11,183 passenger trains operated daily, up by 7.5% [2] - On May 1, a record single-day passenger volume of 23.12 million was recorded [2] Group 3: Port and Cargo Transportation - Ningbo-Zhoushan Port's container throughput exceeded 21 million standard containers, reflecting a year-on-year growth of 9.8% [3] - The total port cargo throughput in China reached 8.9 billion tons, with a year-on-year increase of 4% [3] - Container throughput was 17 million standard containers, growing by 6.9%, with foreign trade container throughput increasing by 8.9% [3] Group 4: Infrastructure Investment - China's transportation fixed asset investment reached 1.6474 trillion, with road investment at 1.1291 trillion [4] - The completion of the 57-kilometer Wuma Expressway section enhances regional economic connectivity [4] Group 5: Overall Economic Indicators - Key transportation production indicators, including cargo volume and cross-regional passenger flow, maintained a growth rate around 4% [5] - The second quarter saw an acceleration in the growth rates of port cargo throughput and cross-regional passenger flow compared to the first quarter [5]
近十年长沙完成农村公路提质改造约15000公里
Chang Sha Wan Bao· 2025-08-12 02:18
近日,交通运输部、财政部、自然资源部联合印发《新一轮农村公路提升行动方案》(以下简称 《行动方案》),部署实施新一轮农村公路提升行动相关工作,持续推动"四好农村路"高质量发展。8 月11日,从长沙市交通运输局获悉,近年来,长沙市推动建立"四好农村路"建设、管理、养护、运营长 效机制,结合全市乡村振兴美丽宜居村庄建设,已实现县县有一条"县级样板路",2025年将实现乡乡有 一条"美丽农村路"。 在浏阳市东南片区的文家市、小河、大围山等乡镇,秋收起义纪念园、苍坊旅游区、千年罗汉松公园、 李白烈士故居、道官冲非遗生态村、大围山国家森林公园等诸多景点犹如珍珠,而通达的农村公路则是 串珠成链的丝带,不仅吸引了诸多游客前往游玩打卡,也带动了农家乐、露营、民宿等当地经济的发 展。 修路兴业富民,这样的例子在长沙还有不少。从长沙市交通运输局了解到,近十年来,长沙共完成农村 公路提质改造约15000公里,完成资源路、旅游路、产业路建设超1000公里,不断促进"农村公路+旅 游""农村公路+产业"等深度融合,实现所有乡镇通三级路、建制村通硬化路和客班车、具备条件的自然 村通硬化路。 截至目前,全市已成功创建长沙县、望城区、浏阳市 ...
蕰川高速新建工程主线桥梁上部结构施工将启
Jie Fang Ri Bao· 2025-08-12 01:56
记者 张海峰 摄 昨天,记者从城投公路获悉:近日,由城投公路投资建设的S16蕰川高速(G1503公路-省界)新建工程主线 即将启动桥梁上部结构施工。工程全线位于宝山区,全长约17.5千米。项目建成后,将进一步构建北部出省的高 等级通道,强化沪苏联系。 ...
四川路桥等成立甘肃靖会高速公路项目管理公司,注册资本5亿
Qi Cha Cha· 2025-08-11 06:49
Group 1 - The establishment of Gansu Jinghui Expressway Project Management Co., Ltd. has been announced, with a registered capital of 500 million yuan [1] - The company's business scope includes construction engineering, highway management and maintenance, engineering surveying, and engineering design [1] - The company is jointly held by Sichuan Road and Bridge (600039) and its wholly-owned subsidiary, Sichuan Highway and Bridge Construction Group Co., Ltd. [1]