能量管理系统

Search documents
海博思创股价小幅回落 上半年储能系统出货量跻身全球前三
Jin Rong Jie· 2025-08-19 16:58
Group 1 - The stock price of Haibo Sichuang as of August 19, 2025, is 107.90 yuan, down 1.00% from the previous trading day [1] - The opening price for the day was 108.48 yuan, with a high of 109.50 yuan and a low of 106.60 yuan, and the trading volume reached 14,534 hands with a transaction amount of 1.56 billion yuan [1] - Haibo Sichuang operates in the power equipment industry, focusing on energy storage system integration, including the research and manufacturing of energy storage battery DC systems, inverter boost systems, and energy management systems [1] Group 2 - In the first half of 2025, Haibo Sichuang ranked second among domestic energy storage system integrators in terms of shipment volume and third globally [1] - In the domestic market, the company is second only to CRRC Zhuzhou Institute, while in the global market, it ranks above companies like Envision Energy [1] - The company participated in large-scale procurement and framework procurement, achieving a bidding scale that ranks among the top in the industry [1] Group 3 - On August 19, 2025, the net inflow of main funds into Haibo Sichuang was 24.5769 million yuan, accounting for 0.6% of the circulating market value [1] - Over the past five trading days, the cumulative net inflow reached 120 million yuan, representing 2.94% of the circulating market value [1]
浙江110MW/220MWh电网侧储能项目储能设备采购招标
中关村储能产业技术联盟· 2025-07-03 05:19
Core Viewpoint - The article discusses the public tender announcement for the procurement of energy storage equipment for the 110MW/220MWh grid-side energy storage project in Zhoushan City High-tech Zone, highlighting the project's specifications and requirements for potential bidders [1][2]. Summary by Sections Project Overview - The project involves the procurement of a grid-side energy storage system with specifications of 110MW/220MWh, including energy storage battery cabins, power conversion systems, energy management systems, and associated cabling and accessories [2][4]. Tender Details - The tender is managed by Hangzhou Energy Group Engineering Technology Co., Ltd., with a project budget of 142 million yuan and a maximum bid limit of 116.6 million yuan [7]. - The tender announcement was published on June 30, 2025, and the online registration period for bidders is from the announcement date until July 21, 2025 [3][8]. Bidder Qualifications - Bidders must be registered enterprises in mainland China with independent legal status and must not have any disqualifying records in the past three years [5]. - Joint bids are not accepted, and bidders must provide complete and valid documentation [5]. Registration and Submission Process - Bidders must register on the Hangzhou City Investment Procurement Platform and complete the necessary certifications before the deadline [6][8]. - The submission of bid documents must be done in person by the specified deadline, with no acceptance of mailed submissions [10]. Contact Information - The contact details for the tendering authority and the consulting agency are provided for further inquiries [12][13].
新疆立新能源三塘湖200MW/800MWh储能及800MW风电场储能设备招标
中关村储能产业技术联盟· 2025-03-31 10:05
Core Viewpoint - The article discusses the public tender for a large-scale energy storage project in Xinjiang, China, which includes a 200MW/800MWh energy storage system and an 800MW wind power project, highlighting the project's significance in the renewable energy sector [2][3]. Project Overview and Tender Scope - The project is located in the town of Santanghu, Barkol County, Hami City, Xinjiang, with a construction scale of 200MW/800MWh for energy storage and 800MW for wind power [3]. - The site is approximately 175km from Hami City and 62km from Santanghu Town, featuring favorable construction conditions due to its accessible transportation routes [3]. - The project includes the construction of a 220kV booster station with plans for four 240MVA transformers, with the first phase involving three transformers [3]. Tender Content and Requirements - The procurement includes equipment for a grid-connected energy storage system, specifically lithium iron phosphate battery prefabricated cabins, power conversion systems (PCS), energy management systems (EMS), and related components [4][5]. - The tender specifies a five-year warranty for the complete equipment, with lithium iron phosphate batteries guaranteed for 6000 charge-discharge cycles or eight years [5]. Bidder Qualifications - Bidders must be independent legal entities registered in China and demonstrate manufacturing capabilities for at least one core component of the energy storage system [7]. - Bidders are required to provide third-party certification for their lithium iron phosphate batteries and other key components, along with evidence of a quality management system [7][8]. - The tender mandates that bidders have a cumulative contract signing performance of no less than 3GWh for lithium iron phosphate energy storage systems over the past three years [8]. Bid Submission Details - The bid submission deadline is set for April 20, 2025, at 10:30 AM, with the submission location specified [10][14]. - Bidders must obtain the tender documents by April 19, 2025, and the cost for the documents is set at RMB 2500 per section [11][13]. Event Information - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) will take place from April 10-12, 2025, in Beijing, featuring over 800 leading companies and 500 new product launches [18][20]. - The event aims to attract over 200,000 professional visitors and includes more than 40 thematic forums focusing on energy storage development opportunities [18][20].