Workflow
CH ENERGY ENG(03996)
icon
Search documents
中国能建江苏院申请一种考虑断面潮流功率波动优化与源网荷储协同的储能配置与调度方法和装置专利,避免容量冗余或不足
Jin Rong Jie· 2025-08-16 07:15
Group 1 - The company, China Energy Construction Group Jiangsu Electric Power Design Institute Co., Ltd., has applied for a patent related to energy storage configuration and scheduling methods, focusing on optimizing power flow fluctuations and coordination among sources, networks, loads, and storage [1] - The patent application was filed on May 2025, and the public number is CN120497982A, indicating the company's active engagement in innovative energy solutions [1] - The proposed method involves a dual-layer mixed-integer programming model to determine optimal energy storage capacity and daily scheduling curves, ensuring economic efficiency and avoiding redundancy or insufficiency in storage capacity [1] Group 2 - China Energy Construction Group Jiangsu Electric Power Design Institute Co., Ltd. was established in 1990 and is located in Nanjing, with a registered capital of 600 million RMB [2] - The company has invested in 23 enterprises and participated in 4,312 bidding projects, showcasing its extensive involvement in the energy sector [2] - The company holds 957 patents and has 99 administrative licenses, reflecting its strong focus on research and development in the energy industry [2]
从“智”的突破到“质”的跃升 中国能建安徽电建二公司以数智引擎驱动高质量发展
Core Viewpoint - The company is leveraging digital intelligence to enhance project construction efficiency and quality, focusing on innovation and strategic development in the energy sector [3][8]. Group 1: Digital Transformation and Innovation - The company utilizes drones equipped with laser radar for high-precision surveying, creating 3D digital twin models for solar panel layout [1]. - A self-developed AI platform covers over 40 applications, enhancing safety management and construction efficiency [5]. - The company has established a comprehensive digital management platform that integrates various core functions, enabling real-time project monitoring [6]. Group 2: Strategic Development and Focus Areas - The company is optimizing its business structure and focusing on dual main businesses: energy construction and urban development, while ensuring seamless integration of traditional and new energy sectors [3][4]. - It aims to strengthen its capabilities in four key areas: new energy, new infrastructure, new industries, and new materials, with significant investments in R&D [3][4]. Group 3: Project Management and Quality Control - The company has implemented advanced monitoring systems and technologies, such as 3D laser scanning and robotic welding, to enhance construction precision and efficiency [6]. - It has achieved notable project management milestones, including the development of 14 national patents and 4 provincial engineering standards [6]. Group 4: Commitment to Sustainable Development - The company is actively pursuing projects that align with carbon neutrality goals, such as integrated renewable energy bases and zero-carbon supply chain initiatives [4][8]. - It is investing in strategic emerging industries like hydrogen and energy storage, positioning itself for future growth in the clean energy sector [8]. Group 5: Talent Development and Employee Empowerment - The company has implemented targeted talent development programs to enhance employee skills and prepare them for critical roles in project execution [8]. - A smart learning platform is in place to provide customized training for employees, fostering a culture of continuous improvement and innovation [8].
中国能建(601868) - 中国能源建设股份有限公司H股公告
2025-08-15 10:46
香港交易及結算所有限公司及香港聯合交易所有限公司對本公告的內容概不負責,對其 準確性或完整性亦不發表任何聲明,並明確表示,概不對因本公告全部或任何部份內容 而產生或因倚賴該等內容而引致的任何損失承擔任何責任。 3996 董事會會議通告 中國能源建設股份有限公司(「本公司」)董事會(「董事會」)謹此宣佈,本公司將於二零二 五年八月二十八日(星期四)舉行董事會會議,藉以(其中包括)批准本公司及其附屬公司 截至二零二五年六月三十日止六個月的中期業績及其發佈。 承董事會命 中國能源建設股份有限公司 副董事長 倪真 CHINA ENERGY ENGINEERING CORPORATION LIMITED* 中國,北京 2025年8月15日 於本公告日期,本公司執行董事為倪真先生;非執行董事為劉學詩先生及司欣波先生; 及獨立非執行董事為程念高先生、魏偉峰博士、牛向春女士及裴振江先生。 * 僅供識別 ...
重大工程系列报告之四:又一重大水利投资:三峡新航道
Hua Yuan Zheng Quan· 2025-08-15 09:47
Investment Rating - Investment rating: Positive (maintained) [5] Core Viewpoints - The shipping capacity of the Three Gorges ship lock is under pressure, necessitating the expansion of the "golden waterway." The Three Gorges-Gezhouba hub has been a key shipping channel since its completion, with a designed annual throughput capacity of 100 million tons, which was exceeded in 2011. In 2023, the cargo volume reached 169 million tons, nearly 70% above the design capacity, leading to significant delays in shipping [5][6] - The Three Gorges New Channel project has been officially initiated, marking a systematic upgrade for water transport hubs. The project, with an estimated total investment of 76.6 billion yuan and a construction period of 100 months, aims to enhance the shipping capacity from 100 million tons to 280 million tons annually, significantly reducing waiting times for vessels [5][9][10] - The project is expected to save approximately 468 million yuan in shipping time, 61 million yuan in reduced cargo transport time, and 5.742 billion yuan in cost savings from replacing land transport, thereby lowering logistics costs and enhancing operational efficiency in the region [12][19] Summary by Sections 1. Shipping Hub Capacity Constraints - The Three Gorges hub's capacity is nearing saturation, with increasing shipping demands leading to significant bottlenecks. The average waiting time for vessels has exceeded 200 hours, with extreme cases reaching 400 hours, severely impacting logistics efficiency [6][9] 2. Project Development and Timeline - The Three Gorges New Channel project has undergone extensive planning and has now entered the implementation phase, with feasibility studies approved and construction set to begin in mid-August 2025. The project includes the construction of a new channel and the expansion of the Gezhouba lock [10][11] 3. Investment Analysis - The estimated investment for civil engineering in the Three Gorges New Channel project is approximately 38.3 billion yuan, with total project costs projected at 76.6 billion yuan. The project emphasizes the need for advanced design and construction capabilities, suggesting a focus on companies with expertise in large-scale infrastructure [14][16] 4. Key Companies to Watch - Companies such as China Communications Construction Company, China Electric Power Construction Company, and China Energy Engineering Group are highlighted as key players due to their extensive experience in similar large-scale projects and their capabilities in complex engineering [16][17][18] 5. Cement Demand and Regional Impact - The construction of the Three Gorges New Channel is expected to require approximately 930,000 cubic meters of concrete, leading to a demand for about 4.185 million tons of cement, significantly benefiting regional cement suppliers like Huaxin Cement [19][20]
中国能源建设(03996.HK)拟8月28日举行董事会会议批准中期业绩
Ge Long Hui· 2025-08-15 08:54
格隆汇8月15日丨中国能源建设(03996.HK)宣布,本公司将于2025年8月28日(星期四)举行董事会会 议,藉以(其中包括)批准本公司及其附属公司截至2025年6月30日止六个月的中期业绩及其发布。 ...
中国能源建设(03996) - 董事会会议通告
2025-08-15 08:31
香港交易及結算所有限公司及香港聯合交易所有限公司對本公告的內容概不負責,對其 準確性或完整性亦不發表任何聲明,並明確表示,概不對因本公告全部或任何部份內容 而產生或因倚賴該等內容而引致的任何損失承擔任何責任。 中國能源建設股份有限公司(「本公司」)董事會(「董事會」)謹此宣佈,本公司將於二零二 五年八月二十八日(星期四)舉行董事會會議,藉以(其中包括)批准本公司及其附屬公司 截至二零二五年六月三十日止六個月的中期業績及其發佈。 承董事會命 中國能源建設股份有限公司 副董事長 倪真 中國,北京 2025年8月15日 CHINA ENERGY ENGINEERING CORPORATION LIMITED* 3996 董事會會議通告 * 僅供識別 於本公告日期,本公司執行董事為倪真先生;非執行董事為劉學詩先生及司欣波先生; 及獨立非執行董事為程念高先生、魏偉峰博士、牛向春女士及裴振江先生。 ...
中国能建等在河北成立资源循环公司,注册资本1亿元
Qi Cha Cha· 2025-08-15 07:19
Group 1 - The establishment of Zhongnengjian Longjin (Hebei) Resource Recycling Co., Ltd. has been announced, with a registered capital of 100 million yuan [1] - The company is co-owned by China Energy Engineering Group Equipment Co., Ltd. and Wanlong New Materials (Beijing) Technology Co., Ltd. [1] - The business scope includes power generation, power transmission, power supply and distribution, new material technology research and development, and recycling resource sales and processing [1]
中国能建间接控股子公司7.7亿元项目环评获同意
Mei Ri Jing Ji Xin Wen· 2025-08-15 06:21
Group 1 - The core viewpoint of the news is that China Energy Construction (SH601868) has received environmental approval for the first phase of the Tiandong Yincheng photovoltaic project, with a total investment of 770 million yuan [1] - The "A-share Green Report" project aims to enhance transparency in environmental information of listed companies, utilizing authoritative environmental regulatory data from 31 provinces and 337 cities [1] - The project includes regular updates on environmental risks associated with listed companies, with the latest report indicating that 10 companies have recently exposed environmental risks [2] Group 2 - China Energy Construction's main business segments include engineering construction in new energy (29.84% of revenue), real estate (4.14%), and other sectors [3] - The company's projected financials for 2023 and 2024 show a revenue increase from 40.6 billion yuan in 2023 to 43.67 billion yuan in 2024, with a net profit increase from 798.6 million yuan to 839.6 million yuan [4] - The company's gross profit margin is projected to decrease from 12.64% in 2023 to 12.41% in 2024, while the return on equity is expected to be 7.06% [4]
中国能建西北区域总部发布招聘公告
Group 1 - The company, China Energy Construction Group Northwest Regional Headquarters, serves as a regional headquarters and investment platform, responsible for market development and investment in five provinces: Shaanxi, Gansu, Ningxia, Qinghai, and Xinjiang [1] - The company has a registered capital of 2.5 billion yuan and is located in Xi'an, Shaanxi [1] - It focuses on traditional energy, new energy, smart energy, water conservancy, ecological protection, comprehensive transportation, municipal projects, housing construction, new urbanization, building materials, civil explosives, equipment manufacturing, and financial capital [1] Group 2 - The company has established deep cooperation with multiple cities and regions in Northwest China, providing comprehensive solutions and services throughout the project lifecycle [1] - It aims to develop into a modern, specialized, and efficient central enterprise headquarters base [1] Group 3 - The company is currently recruiting for various positions, including two heads of affiliated institutions and several development specialists for the five provinces [2][3] - The recruitment emphasizes high political quality, innovative thinking, and strong organizational and communication skills [4][5][6] Group 4 - Applicants for the head positions should generally be under 45 years for males and 40 years for females, while those for specialist positions should be under 40 years for males and 35 years for females [10] - A master's degree from a key university is preferred, with flexibility for exceptional candidates in specific fields [10][12] Group 5 - The recruitment process includes application submission, qualification review, initial screening, comprehensive testing, candidate selection, medical examination, and employment [17][19][20][21] - The company offers competitive compensation and benefits, including social insurance and paid leave [23]
三一集团与中国能建葛洲坝集团深化战略合作,并达成联合研发无人自卸车应用课题
Xin Lang Cai Jing· 2025-08-14 02:29
Group 1 - The core viewpoint of the article highlights the strategic collaboration between SANY Group and China Energy Engineering Group Gezhouba Company, focusing on technology innovation, intelligent construction, major equipment research and development, talent cultivation, market development, and capital cooperation [1] - On August 12, SANY Group and China Energy Engineering Group Gezhouba Company held a technical exchange meeting and reached an agreement on joint research and development of unmanned dump truck applications, establishing a solid technical foundation for national strategic hydropower engineering construction [1] - The discussion between the leaders of both companies emphasizes the importance of deepening cooperation in various fields to enhance their competitive edge in the industry [1]