CHINA RAILWAY(601390)
Search documents
晚间公告丨8月24日这些公告有看头
第一财经· 2025-08-24 12:15
Major Events - China Railway announced an investigation into the construction accident at the Qianzhai Yellow River Bridge, which resulted in 12 fatalities and 4 missing persons. The bridge is 1596.2 meters long with a contract value of approximately 436 million yuan. The company stated that this incident will not have a significant impact on its operations and performance [4] - Greenme announced plans to issue H-shares and list on the main board of the Hong Kong Stock Exchange [5] - Jingwang Electronics plans to invest 5 billion yuan in the Zhuhai Jinwan base expansion project, focusing on high-growth areas such as AI computing power and automotive intelligence [6][7] - Mingtai Aluminum intends to sell a 2.5% stake in Sanmenxia Aluminum to Jiaozuo Wanfang, with the share price set at 5.39 yuan per share, expecting to receive 149 million shares [8] - Dingsheng New Materials also plans to sell a 0.57% stake in Sanmenxia Aluminum under similar terms [9] Performance Overview - Xiyu Co. reported a net profit of 1.062 billion yuan for the first half of 2025, a year-on-year increase of 32.76%, with total revenue of 21.093 billion yuan, up 12.35% [10] - Jintailang reported a net profit of 358 million yuan, a 3.95% increase, with revenue of 9.528 billion yuan, up 2.49% [11] - Huaxia Eye Hospital achieved a net profit of 282 million yuan, a 6.2% increase, with revenue of 2.139 billion yuan, up 4.31% [12] - Juxin Technology reported a net profit growth of 123.19%, reaching 91.375 million yuan, with revenue of 449 million yuan, up 60.12% [13][14] - Zhendong Pharmaceutical reported a net profit of 7.9313 million yuan, a decline of 74.13%, with revenue of 1.457 billion yuan, down 3.3% [15] - China Merchants South Oil reported a net profit decline of 53.28%, totaling 570 million yuan, with revenue of 2.772 billion yuan, down 21.43% [16] - Chongqing Construction reported a net loss of 249 million yuan, with revenue of 14.359 billion yuan, down 7.97% [17] - Huacan Optoelectronics reported a net loss of 115 million yuan, with revenue of 2.532 billion yuan, up 33.93% [18] - Digital Government reported a net loss of 18.6927 million yuan, with revenue of 321 million yuan, down 40.34% [19] Major Contracts - Zhonggong International signed a contract for an overseas road engineering project in Nicaragua, valued at approximately 513 million yuan, which represents 4.2% of the company's total revenue for 2024 [20] Shareholding Changes - Tiancheng Technology announced that shareholder Qingxun Electronics plans to reduce its stake by up to 119,000 shares, representing no more than 0.1% of the total share capital [22] - Ailong Technology's controlling shareholder plans to reduce its stake by up to 1.69% through various trading methods [23]
中国中铁(00390.HK):尖扎黄河特大桥事故已致12人遇难4人失联 原因正在调查之中
Ge Long Hui· 2025-08-24 11:04
Core Viewpoint - A tragic accident occurred during the construction of the Qinchuan Railway's Qinghai section, resulting in 12 fatalities and 4 missing persons due to the sudden failure of a suspension cable on the tower [1] Group 1 - The accident took place on August 22, 2025, at approximately 3:10 AM, involving a full subsidiary of the company, China Railway Bridge Bureau Group Co., Ltd [1] - The company and its subsidiary immediately activated emergency response plans following the incident [1] - Relevant personnel were dispatched to the scene to assist government departments in emergency rescue and investigation efforts [1] Group 2 - Search and rescue operations are currently being conducted in an orderly manner at the accident site [1] - The cause of the accident is under investigation [1]
中国中铁:尖扎黄河特大桥事故原因正在调查之中 已致12人遇难4人失联
智通财经网· 2025-08-24 10:48
Core Viewpoint - China Railway (601390.SH) reported a tragic accident involving its wholly-owned subsidiary, China Railway Bridge Bureau Group Co., Ltd., resulting in 12 fatalities and 4 missing persons during the construction of the Qinchuan Railway in Qinghai Province [1] Group 1 - The accident occurred on August 22, 2025, at approximately 3:10 AM, when a suspension cable suddenly broke during the installation of auxiliary steel beams at the Jianzhai Yellow River Super Bridge [1] - Following the incident, the company and its subsidiary promptly activated an emergency response plan, with relevant personnel dispatched to the site to assist government authorities in rescue and investigation efforts [1] - Currently, emergency and rescue operations are being conducted in an orderly manner, and the cause of the accident is under investigation [1]
刚刚,中国中铁道歉!
券商中国· 2025-08-24 10:38
Core Viewpoint - The accident involving the construction of the Qingshan Railway's Yellow River Bridge resulted in 12 fatalities and 4 missing persons, prompting the company to initiate emergency response measures and express condolences to the victims' families [1][2]. Group 1: Accident Details - The accident occurred on August 22 at approximately 3:10 AM, when a suspension cable on the tower for auxiliary steel beam installation suddenly broke [1]. - The bridge, known as the Qingshan Yellow River Bridge, has a total length of 1596.2 meters and a contract value of approximately 436 million yuan [2]. Group 2: Company Response - The company and its subsidiary, China Railway Bridge Bureau Group Co., Ltd., activated their emergency plan immediately after the incident [1]. - The company is committed to learning from this tragedy and ensuring proper handling of subsequent matters while fulfilling its corporate responsibilities [1]. Group 3: Impact on Operations - The company stated that this incident will not have a significant impact on its production operations or financial performance [2].
尖扎黄河特大桥事故已致12死4失联,中国中铁致歉
21世纪经济报道· 2025-08-24 10:36
Core Viewpoint - The accident involving the construction of the Qianzhai Yellow River Bridge by China Railway's subsidiary resulted in 12 fatalities and 4 missing persons, but it is not expected to significantly impact the company's operations or financial performance [1][2][4]. Group 1 - The accident occurred on August 22, 2025, at approximately 3:10 AM, when a cable on the tower supporting auxiliary steel beams suddenly broke [1][4]. - The bridge spans 1,596.2 meters and has a contract value of approximately 436 million yuan [2][4]. - The company has initiated an emergency response plan and is cooperating with government authorities for rescue and investigation efforts [2][4]. Group 2 - The company expressed deep condolences for the victims and their families, committing to learn from the incident and fulfill its corporate responsibilities [2][4]. - Ongoing emergency and rescue operations are being conducted in an orderly manner, with the cause of the accident under investigation [2][4].
晚间公告丨8月24日这些公告有看头
Di Yi Cai Jing· 2025-08-24 10:28
Group 1 - China Railway announced an investigation into the construction accident at the Qianzhai Yellow River Bridge, resulting in 12 fatalities and 4 missing persons. The bridge is 1596.2 meters long with a contract value of approximately 436 million yuan. The company stated that the accident will not have a significant impact on its operations and performance [3] - Greenme announced plans to issue H-shares and list on the main board of the Hong Kong Stock Exchange [4] - Jingwang Electronics plans to invest 5 billion yuan in the Zhuhai Jinwan base expansion project, focusing on high-growth areas such as AI computing power and autonomous driving from 2025 to 2027 [5] Group 2 - Xiyu Co. reported a net profit of 1.062 billion yuan for the first half of 2025, a year-on-year increase of 32.76%, with total revenue of 21.093 billion yuan [9] - Jintai Co. reported a net profit of 358 million yuan for the first half of 2025, a year-on-year increase of 3.95%, with total revenue of 9.528 billion yuan [10] - Huaxia Eye Hospital reported a net profit of 282 million yuan for the first half of 2025, a year-on-year increase of 6.2%, with total revenue of 2.139 billion yuan [11] - Juxin Technology reported a net profit of 91.375 million yuan for the first half of 2025, a year-on-year increase of 123.19%, with total revenue of 449 million yuan [13] - Zhendong Pharmaceutical reported a net profit of 7.9313 million yuan for the first half of 2025, a year-on-year decrease of 74.13%, with total revenue of 1.457 billion yuan [14] - China Merchants Nan Oil reported a net profit of 570 million yuan for the first half of 2025, a year-on-year decrease of 53.28%, with total revenue of 2.772 billion yuan [15] - Chongqing Construction reported a net loss of 249 million yuan for the first half of 2025, with total revenue of 14.359 billion yuan, a year-on-year decrease of 7.97% [16] - Huacan Optoelectronics reported a net loss of 115 million yuan for the first half of 2025, with total revenue of 2.532 billion yuan, a year-on-year increase of 33.93% [17] - Digital Government reported a net loss of 18.6927 million yuan for the first half of 2025, with total revenue of 321 million yuan, a year-on-year decrease of 40.34% [18] Group 3 - Zhonggong International signed a contract for an overseas road engineering project in Nicaragua worth approximately 513 million yuan, which accounts for 4.2% of the company's total revenue for 2024 [20]
中国中铁最新公告!向遇难者家属致歉
Zheng Quan Shi Bao· 2025-08-24 10:23
Core Viewpoint - A tragic accident occurred during the construction of the Qiangqing Railway's Qianzhai Yellow River Bridge, resulting in 12 fatalities and 4 missing persons. The company expresses deep condolences and is cooperating with investigations [4][5]. Group 1: Accident Details - On August 22, 2025, at approximately 3:10 AM, a steel strand broke during the construction of the Qianzhai Yellow River Bridge, leading to the casualties [4]. - The bridge spans 1,596.2 meters and has a contract value of approximately 436 million yuan [4]. - The company and its subsidiary immediately activated emergency plans and are conducting rescue and investigation efforts [4]. Group 2: Government Response - The State Council's Work Safety Committee has decided to supervise the investigation of the major accident [5]. - A dedicated investigation team has been established by the Qinghai provincial government, led by the Executive Vice Governor, to thoroughly examine the incident [6]. - The investigation will follow principles of scientific rigor and legal compliance, aiming to determine the cause and responsibility for the accident [6]. Group 3: Company Impact - The company asserts that the accident will not have a significant impact on its production operations or financial performance [4].
中国中铁(601390.SH):尖扎黄河特大桥事故原因正在调查之中 已致12人遇难4人失联
Zheng Quan Zhi Xing· 2025-08-24 10:20
智通财经APP讯,中国中铁(601390.SH)发布公告,2025年8月22日3时10分左右,公司全资子公司中铁 大桥局集团有限公司施工的川青铁路青海段尖扎黄河特大桥,辅助钢梁架设的吊索塔架前端扣索突然崩 断,截至目前造成12人遇难、4人失联。事故发生后,公司及中铁大桥局集团有限公司立即启动应急预 案,相关负责人第一时间赶赴现场,配合政府有关部门开展应急抢险、人员搜救和相关调查工作。目 前,现场应急和搜救等相关工作正有序开展,事故原因正在调查之中。 (原标题:中国中铁(601390.SH):尖扎黄河特大桥事故原因正在调查之中 已致12人遇难4人失联) ...
中国中铁就尖扎黄河特大桥事故致歉,原因正调查!合同额披露
Nan Fang Du Shi Bao· 2025-08-24 10:20
Core Viewpoint - On August 24, China Railway Group Limited announced a tragic accident during the construction of the Qianzhai Yellow River Bridge, resulting in 12 fatalities and 4 missing persons [2] Summary by Relevant Sections Accident Details - The accident occurred on August 22 at approximately 3:10 AM during the installation of auxiliary steel beams for the Qianzhai Yellow River Bridge, which is part of the Sichuan-Qinghai Railway [2] - The front cable of the tower suddenly broke, leading to the casualties [2] Company Response - The company and its subsidiary, China Railway Bridge Bureau Group Co., Ltd., activated emergency plans immediately after the incident [2] - Relevant personnel were dispatched to the site to assist government departments in rescue operations and investigations [2] - The company expressed deep condolences to the victims and their families, committing to learn from the incident and fulfill corporate responsibilities [2] Project Information - The Qianzhai Yellow River Bridge spans 1,596.2 meters with a contract value of approximately 436 million yuan [2] - The company stated that this incident would not have a significant impact on its production operations or financial performance [2]
中国中铁(00390):尖扎黄河特大桥事故原因正在调查之中 已致12人遇难4人失联
智通财经网· 2025-08-24 10:17
智通财经APP讯,中国中铁(00390)发布公告,2025年8月22日3时10分左右,中国中铁股份有限公司(以 下简称"公司")全资子公司中铁大桥局集团有限公司施工的川青铁路青海段尖扎黄河特大桥,辅助钢梁 架设的吊索塔架前端扣索突然崩断,截至目前造成12人遇难、4人失联。事故发生后,公司及中铁大桥 局集团有限公司立即启动应急预案,相关负责人第一时间赶赴现场,配合政府有关部门开展应急抢险、 人员搜救和相关调查工作。目前,现场应急和搜救等相关工作正有序开展,事故原因正在调查之中。 ...