Workflow
机场扩建
icon
Search documents
深圳机场三跑道扩建工程通过竣工验收
Group 1 - Shenzhen Airport's third runway expansion project has successfully passed the completion acceptance, laying a solid foundation for subsequent test flights and industry acceptance, with formal operation expected within the year [1] - The project includes the construction of a new third runway, parallel taxiways, and supporting facilities such as navigation lights, power supply, water supply, and fire rescue systems, with comprehensive inspections conducted by five specialized acceptance groups [1][2] - Shenzhen Airport aims to enhance project standards and ensure smooth completion of follow-up works to meet industry acceptance requirements [2] Group 2 - Shenzhen Airport is a key national project and a major engineering initiative in Guangdong Province, designed to accommodate large passenger aircraft with a runway length of 3,600 meters and a width of 45 meters [2] - By the end of 2024, Shenzhen Airport is expected to have a peak hour capacity of 65 aircraft movements, ranking first among domestic dual-runway airports, with 186 passenger destinations and a total passenger throughput of 61.48 million, second in the country for domestic passenger volume [2] - The airport has reported steady growth in performance, with a projected net profit for the first half of 2025 expected to be between 287 million and 337 million yuan, representing a year-on-year increase of 64.78% to 93.47% [3] - In the first half of the year, international and regional passenger traffic at Shenzhen Airport exceeded 3 million for the first time, with flight numbers surpassing 20,000, both figures exceeding those of the same period in 2019 [3]
中南空管局“双塔台”首次联动保障 全力护航广州白云机场第五跑道投产飞行校验
Core Points - The fifth runway at Guangzhou Baiyun Airport has commenced its flight calibration tasks, marking a critical milestone in the airport's Phase III expansion project [1] - The new runway is designed to 4E standards, measuring 3,600 meters in length and 45 meters in width, located 1,530 meters east of the existing East No. 2 runway [1] - The Central South Air Traffic Management Bureau has implemented a "dual tower" coordination system for air traffic control, enhancing operational efficiency and safety during the calibration flights [1][2] Group 1 - The flight calibration tasks are expected to last approximately 20 days, during which communication, navigation, and lighting facilities of the new runway will be thoroughly tested [2] - The dual tower system includes a new second tower responsible for low-altitude monitoring and landing procedures, while the existing first tower oversees overall command [1][2] - This marks the first significant operational task for the newly constructed second tower, indicating a new phase of collaborative operations at Guangzhou Baiyun Airport with "five runways and dual towers" [1]
安置房提速交付惠及1.8万户居民,白云机场T3年内启用
Nan Fang Du Shi Bao· 2025-06-09 14:47
Group 1 - The Guangzhou Baiyun Airport Phase III expansion project is the largest airport expansion project in China's civil aviation history, with a total investment exceeding 100 billion yuan [1] - The project involves the relocation of 62 villages and approximately 62,000 residents, with the first batch of housing for displaced residents expected to be completed six months ahead of schedule [1] - The total planned area for the Phase III housing project is over 12.5 million square meters, making it the largest housing project under construction in Guangdong Province [1] Group 2 - The fifth runway (East Third Runway) of Guangzhou Baiyun International Airport has entered the flight calibration phase, marking a critical verification stage before its operation [2][4] - The calibration will test key systems such as communication navigation, approach lighting, and overall flight procedures, significantly improving operational efficiency during peak flight times once completed [4] - Upon full completion, the airport's annual passenger throughput capacity will exceed 120 million, and cargo throughput will reach 3.8 million tons, reinforcing its status as a core aviation hub in the Guangdong-Hong Kong-Macao Greater Bay Area [4]
济南或将瞄准“双机场”
Qi Lu Wan Bao· 2025-05-21 21:10
Group 1 - The core viewpoint is that the expansion of airports in China is driven by urbanization and high-quality development, with a focus on enhancing the role of airports as economic engines for cities [2] - The Guangzhou Baiyun Airport Phase III expansion is noted as the largest and most complex airport reconstruction project in China's civil aviation history, utilizing shield tunneling technology for the first time in the domestic civil aviation sector [1] - Jinan International Airport is planning for future expansions, including a third terminal, and aims to enter a "dual airport era" with the potential construction of a second airport as outlined in the Shandong Province Comprehensive Transportation Network Planning Outline (2023-2035) [1][2] Group 2 - The current wave of airport expansions in China reflects the increasing demand for air travel due to population concentration in urban centers, making airport expansion a necessary choice [2] - The Jinan Airport Phase II expansion is seen as a microcosm of the construction of a strong transportation network in Shandong Province, highlighting the competitive nature of cities [2] - Airports are evolving from merely serving as transport hubs to becoming vital components of urban economic development, indicating a shift from "capacity expansion" to "functional enhancement" [2]