Workflow
节能降碳
icon
Search documents
深入贯彻“双碳”战略 我省加快推进绿色转型
Xin Hua Ri Bao· 2025-12-21 23:16
Core Viewpoint - Jiangsu province has made significant progress in implementing its "dual carbon" strategy, focusing on high-quality development through innovative reforms and precise policies to achieve green transformation in its industrial sector [1][3]. Energy Consumption Reduction - Since the beginning of the 14th Five-Year Plan, Jiangsu has achieved a cumulative reduction of 13.0% in energy consumption intensity per unit of GDP and 13.2% in energy consumption per unit of industrial added value [3][4]. - In the first three quarters of 2025, these two indicators further decreased by 5.6% and 6.1% year-on-year, respectively, laying a solid foundation for meeting the energy reduction targets of the 14th Five-Year Plan [1][3]. Green Manufacturing Initiatives - Jiangsu has introduced a "standard-led, unlimited quota" application mechanism for green factories, resulting in the addition of 901 new provincial-level green factories in 2025, bringing the total to 2,550 [1][6]. - The province has also cultivated 30 zero-carbon (near-zero carbon) factories, leading the nation in this initiative [1][7]. Resource Recycling and Utilization - The province has advanced the comprehensive utilization of industrial solid waste and promoted a waste-free production model, with 126 enterprises now recognized for their comprehensive utilization of renewable resources [8][9]. - Jiangsu has established 1,123 collection points for used batteries, with 7 companies recognized for their compliance with national standards, collectively recovering 13,300 tons of used batteries this year [8]. Regulatory and Supervisory Measures - Jiangsu's industrial sector has implemented strict energy consumption management, with targeted actions for regions that fail to meet energy reduction goals [4][10]. - The province has conducted special energy audits for 218 key enterprises and 93 major projects, ensuring compliance and enhancing energy efficiency [4][10]. Future Directions - Jiangsu aims to continue promoting high-quality development with a focus on carbon peak and carbon neutrality, enhancing green production methods and achieving its carbon reduction targets [10].
破解AIDC“能耗巨兽”难题 三大路径浮现新“卖水人”
相较于传统数据中心,耗电更多、用电负荷波动更大的人工智能数据中心(AIDC)对于供能产业链提 出新要求,安全、经济、绿色成为能源产品迭代的主要方向。专家认为,绿色能源、节能降碳是解决 AIDC用能问题的两大路径,虚拟电厂、储能、燃气轮机等能源解决方案提供商迎来发展机遇,相关领 域已成为企业重点布局的赛道。 ● 本报记者 郑萃颖 企业积极布局 AIDC独特的能源需求正在重塑能源产业链发展格局。阳光慧碳科技有限公司总裁周文闻表示,相较于 传统数据中心,AIDC更专注于提供算力服务,其能源消耗呈倍数增长;与此同时,随着算力密度不断 提高,对能源设备的功率密度、散热方式提出了更高要求。 国际能源署今年4月发布的报告显示,到2030年,全球数据中心的电力需求将增长1倍以上,达到约945 太瓦时(TWh);AI是这一增长的主要驱动力,预计到2030年,AIDC的电力需求将增长四倍以上。业 内人士认为,AIDC的高速发展,始终离不开电力供应安全、经济、绿色三大核心需求。周文闻表示, AI应用的普及正推动AIDC能源需求向多维度升级。"在此过程中,AIDC能源供应的经济性成为市场首 要考量目标。绿色低碳发展的大趋势,则利好风 ...
“信息通信行业赋能社会节能降碳典型应用场景”正式发布
人民财讯12月18日电,根据《信息通信行业绿色低碳发展行动计划(2022—2025年)》相关任务安排,聚 焦赋能产业绿色转型、赋能居民绿色生活、赋能城乡绿色治理三大方向,中国信息通信研究院总结并发 布"信息通信行业赋能社会节能降碳三十个典型应用场景"。场景涵盖了工业制造、能源管理、智慧交 通、绿色建筑、低碳生活、生态治理等多个关键领域,旨在为产业界提供可借鉴、可推广的实践路径, 合力加快经济社会发展全面绿色转型。 ...
张翔:“十四五”时期,山西省能源重点办了四件事
中国能源报· 2025-12-18 00:05
Core Viewpoint - The article discusses the achievements and future plans of Shanxi Province in energy development during the "14th Five-Year Plan" period, emphasizing the transition towards a cleaner, safer, and more efficient energy system, while ensuring national energy security and supporting economic growth [4][10]. Group 1: Transition to Comprehensive Energy Province - Shanxi has shifted from being a "coal resource province" to a "comprehensive energy province," enhancing energy supply resilience and security through the development of coal, electricity, natural gas, and renewable energy [5]. - The province produced approximately 6.5 billion tons of coal, accounting for nearly 30% of the national output, and net electricity output exceeded 740 billion kWh, supporting the national "West-East Power Transmission" strategy [5][6]. Group 2: Green and Intelligent Coal Mining - The coal industry in Shanxi has advanced towards "green and intelligent" mining, with hundreds of mines adopting intelligent mining technologies, significantly reducing labor intensity and enhancing safety [6]. - The proportion of advanced coal production capacity reached 84%, an increase of 15 percentage points compared to five years ago [6]. Group 3: Clean Electricity Development - Shanxi has strengthened the role of coal power while significantly increasing the share of clean energy, with clean power generation capacity surpassing coal power for the first time in January 2023 [7]. - The province has closed over 4 million kW of outdated coal power units and established the first provincial-level electricity spot market in the country [7]. Group 4: Natural Gas Development - The province has developed a multi-gas extraction approach, establishing six gas fields with an annual output of 1 billion cubic meters, significantly enhancing natural gas supply [8]. - The total length of natural gas pipelines reached 9,259 kilometers, improving accessibility for residents [8]. Group 5: Energy Management and Efficiency - Shanxi has implemented a dual control system for energy consumption, achieving an average energy consumption growth rate of 2.3%, supporting an average GDP growth of 5.3% [10]. - The province has established energy management archives for 1,156 key energy-consuming enterprises, promoting precise energy management [24]. Group 6: Renewable Energy Growth - From 2021 to 2024, Shanxi's wind and solar power installed capacity has grown at an average annual rate of 16.8%, with renewable energy and clean energy installed capacity exceeding 50% [11]. - The province has launched multiple policies to support renewable energy development, achieving significant breakthroughs in energy structure optimization [13]. Group 7: Future Plans for Energy Development - Shanxi aims to achieve a 60% share of renewable and clean energy installed capacity by the end of the "15th Five-Year Plan" period, focusing on building a modern energy system that is clean, low-carbon, safe, and efficient [11][30]. - The province plans to double the production and value of unconventional natural gas by 2030, contributing to national energy security and carbon neutrality goals [29][35].
北元集团:系统推进节能降碳技术改造与产业升级
证券日报网讯 12月17日,北元集团在互动平台回答投资者提问时表示,北元集团系统推进节能降碳技 术改造与产业升级。近年来,公司已通过实施离子膜电解槽节能改造、汽轮机通流改造等一系列项目, 持续提升公司主产品核心生产环节的能效水平。中央经济工作会议进一步明确"坚持'双碳'引领,推动 全面绿色转型",并明确要求深入推进重点行业节能降碳改造,这为公司的绿色低碳发展提供了更为清 晰的政策指引与良好机遇。未来,公司将继续紧密围绕政策导向与行业趋势,加快推进绿色技术集成与 清洁能源利用,努力在能效提升和碳排放强度降低等方面取得新进展,不断增强可持续发展竞争力。 (编辑 姚尧) ...
打造能源新支点,北部湾首个跨海联网工程海底电缆开始敷设
Group 1 - The Southern Power Grid's 220 kV undersea interconnection project for Weizhou Island has commenced cable laying, marking the first domestic use of insulated materials for this voltage level [1] - This project will end the "isolated network operation" of Weizhou Island, providing a strong impetus for the development of the marine economy in Guangxi [1] Group 2 - Upon operation, the project is expected to reduce carbon dioxide emissions by 4,318 tons based on gas-fired power generation calculations [4] - The cost of diesel power generation for local guesthouses, which can reach 300 yuan per hour during peak season, will be significantly reduced by the stable power supply from the grid, leading to lower operational burdens and notable energy-saving and carbon reduction effects [4] Group 3 - The project will also support the integration of offshore wind power near the island, providing a crucial transmission channel for future offshore wind energy in the Beibu Gulf [6] - This initiative aims to establish a new energy support point for the region's maritime development [6]
打造能源新支点 北部湾首个跨海联网工程海底电缆开始敷设
Yang Shi Xin Wen· 2025-12-16 04:50
Core Viewpoint - The commencement of the 220 kV undersea interconnection project for Weizhou Island marks a significant advancement in the energy infrastructure of the Beibu Gulf, utilizing domestically produced insulation materials for the first time in China [1][6]. Group 1: Project Overview - The undersea cable laying operation began on December 16, with the deployment of the cable ship in the designated area near Weizhou Island [1]. - This project will end the "isolated grid operation" of Weizhou Island, providing a robust power supply that will stimulate the development of the marine economy in Guangxi [1]. Group 2: Environmental Impact - Upon operation, the project is expected to reduce carbon dioxide emissions by 4,318 tons based on calculations related to gas-fired power generation [4]. - The transition from diesel generators, which cost 300 yuan per hour during peak season for local guesthouses, to a stable power grid will significantly lower operational costs and enhance energy efficiency [4]. Group 3: Future Potential - The project will also support the integration of offshore wind power in the vicinity, establishing a crucial transmission channel for future offshore wind energy development in the Beibu Gulf [6].
北部湾首个跨海联网工程海底电缆开始敷设
Ge Long Hui· 2025-12-16 04:37
Core Viewpoint - The commencement of the 220 kV undersea cable project for Weizhou Island marks a significant advancement in energy infrastructure, utilizing domestically produced insulation materials and aiming to enhance the economic development of Guangxi while reducing carbon emissions [1] Group 1: Project Details - The undersea cable project is the first of its kind in China to use domestically produced insulation materials for 220 kV undersea cables [1] - The project began with the cable-laying vessel entering the designated area near Weizhou Island on December 16 [1] Group 2: Environmental Impact - Upon operation, the project is expected to reduce carbon dioxide emissions by 4,318 tons based on calculations from gas-fired power generation [1] - The project will replace the high cost of diesel power generation, which can reach 300 yuan per hour during peak seasons for local accommodations, with stable grid power, significantly lowering operational costs [1] Group 3: Future Prospects - The project will also support the integration of offshore wind power near the island, providing a crucial transmission channel for future offshore wind energy development in the Beibu Gulf [1] - It aims to establish a new energy hub that aligns with the region's maritime economic ambitions [1]
能源早新闻丨中国华能:连续4年破亿吨!
中国能源报· 2025-12-15 22:33
◐ 国家工业和信息化领域节能降碳技术装备推荐目录( 2 02 5年版)发布。 据工信部网站1 2月15日消息,为加快推广节能降碳先进 技术,加强重点行业领域技术改造升级和大规模设备更新,工信部将《国家工业和信息化领域节能降碳技术装备推荐目录( 20 25 年版)》予以公告。 【更多详情】 ◐ 我国机械工业规上企业达13.7万家。 据新华社12月15日报道,从中国机械工业联合会获悉,"十四五"期间,我国机械工业在 产业规模、对外贸易、创新能力等方面取得显著成就。其中,机械工业规模以上企业数量从2 020年底的9 .2万家增至20 25年10月 底的13.7万家。 ◐ 我国离岸距离最远海上风电项目全容量并网。 据央视新闻报道,12月1 5日,随着最后一台风机成功启动,我国离岸最远海上 风电项目——三峡江苏大丰800兆瓦海上风电项目实现全容量并网,标志着我国海上风电向深远海迈进取得了又一重大突破。 新闻聚焦 ◐ 国家统计局发布最新能源生产情况。 12月15日,国家统计局发布202 5年11月份能源生产情况。11月份,规模以上工业原煤生 产保持稳定,原油生产增速加快,天然气生产平稳增长,电力生产保持增长。 【更多详情 ...
中华人民共和国工业和信息化部公告
中国能源报· 2025-12-15 09:43
中华人民共和国工业和信息化部公告 2 02 5年第37号 12月1 5日,工信部发布《国家工业和信息化领域节能降碳技术装备推荐目录( 2025年版)》。 以下为原文 为贯彻落实《国务院办公厅关于印发〈制造业绿色低碳发展行动方案( 2 025- 2027年)〉的通知》(国办发〔2 025〕21号),加快推广节能 降碳先进技术,加强重点行业领域技术改造升级和大规模设备更新,现将《国家工业和信息化领域节能降碳技术装备推荐目录( 2025年 版)》予以公告。 附件: 国家工业和信息化领域节能降碳技术装备推荐目录( 202 5年版) 工业和信息化部 20 25年12月8日 来源:工信部网站 End 欢迎分享给你的朋友! 出品 | 中国能源报(c ne ne rgy) 责编丨李慧颖 人民服系社主管主办 能源领域最大的原创内容基地 010-6536 9497 发行热线 中国的话报 010-6536 9481 传 真 @ 人工 . Dast 践行央媒使命 守望能源变革 2026年《中国能源报》 全年定价480元/份 每周一出版 012 国内邮发代号1-6 百姓5 国内统一刊号为CN11—0068 中国能源网(含官方微博、官方 ...