Workflow
智能化矿山
icon
Search documents
数智赋能 山西华阳集团泊里煤矿描绘煤业新图景
Xin Hua Cai Jing· 2025-07-22 03:02
Group 1 - The core viewpoint of the articles highlights Shanxi Huayang Group's innovative approach in transforming traditional coal mining through technology, automation, and smart mining construction [2][3] - The company has implemented a smart control platform that allows remote monitoring and management of mining operations, enhancing operational efficiency and safety [2] - The integration of intelligent systems has led to a significant reduction in personnel, with over 30 positions eliminated, while improving equipment efficiency by more than 25% [3] Group 2 - The shift from a traditional "one person, one post" model to a more flexible "multi-skilled" workforce has liberated human resources from repetitive tasks, allowing them to focus on higher-value work [3] - The company aims to build an innovative system that connects production units, integrates information operations, fully utilizes data elements, and efficiently empowers innovative applications, positioning itself as a model for intelligent mining [3] - The strategic transformation emphasizes safety, efficiency, and intensive development, showcasing a successful path for the coal industry to evolve [2]
国家电投内蒙古公司:全力以赴稳保供 迎峰度夏战酷暑
Core Viewpoint - The National Power Investment Corporation (SPIC) Inner Mongolia Company is actively ensuring stable electricity supply during the extreme heat wave affecting 16 provinces in China, with record electricity demand reaching 15.06 billion kilowatts on July 16, marking a historical high [2][3]. Group 1: Electricity Supply and Demand - The company has initiated a "peak summer supply" mode to meet the rising local electricity demand while efficiently transmitting surplus power to regions with high demand, such as Liaoning, Jiangsu, and Shandong [2][3]. - Since the start of the summer peak on June 15, the company's thermal power generation has reached approximately 4.388 billion kilowatt-hours, an increase of about 1.01 billion kilowatt-hours compared to the same period last year [5]. - The company has also generated around 1.099 billion kilowatt-hours from renewable energy sources, reflecting a year-on-year increase of approximately 1.05 billion kilowatt-hours [5]. Group 2: Coal Supply and Production - The company operates five coal mines in Tongliao and Xilin Gol League, which are currently running at full production capacity, having produced 6.38 million tons of coal since the peak summer period began, a month-on-month increase of 570,000 tons [6][8]. - Advanced technology is being utilized in coal production, including smart slope monitoring systems and automated machinery, which have significantly improved operational efficiency [8]. Group 3: Transportation and Logistics - The company leverages its 627-kilometer Jinhu Railway to facilitate coal transportation, achieving a daily average of 26 train deliveries, with a total coal transportation volume exceeding 800,000 tons during the peak summer period [8]. - The Jinzhou Port, a key coal storage base in Liaoning, has a capacity to quickly mobilize 200,000 tons of coal within 72 hours to address emergency situations, ensuring uninterrupted electricity supply [8]. Group 4: Overall Commitment - The company emphasizes its commitment to energy security and supply, coordinating every ton of coal and every kilowatt of electricity to enhance cross-regional power collaboration, thereby contributing to the well-being of millions during the heat wave [9].
海域金矿投产预期进一步强化,招金矿业(01818)有序推进项目节奏再释积极信号
智通财经网· 2025-07-01 08:40
Core Viewpoint - The recent developments in the Haidi Gold Mine project signify a crucial milestone for Zhaojin Mining, marking a transition from construction to production phase, with expectations for increased output and operational efficiency [1][6]. Group 1: Project Milestones - The Haidi Gold Mine project has officially commenced water-linked trial operations for its intelligent processing line, designed to handle an annual processing capacity of 3.96 million tons [1]. - The project has achieved significant breakthroughs, including the successful one-time pouring of over 4,420 cubic meters of concrete, a first in the domestic gold mining sector [2]. - The completion of the "Five Vertical and One Inclined" project has resolved ventilation and transportation issues, facilitating further underground construction [5]. Group 2: Technological Advancements - The processing system employs advanced "SABC grinding + flotation" technology, positioning it among the top tier in China's gold industry for processing capacity [1]. - The project has overcome challenges related to high temperature, humidity, and corrosive environments, enhancing operational efficiency and equipment lifespan [2][5]. Group 3: Strategic Importance - The Haidi Gold Mine is designated as the number one project during the company's "14th Five-Year Plan," with a projected annual gold output exceeding 15 tons, which could solidify its status as a world-class single gold mine [6]. - The company is actively pursuing a "dual H" strategy, expanding its resource network through acquisitions in Africa, which supports its growth in both domestic and international markets [7]. Group 4: Market Context - The backdrop of rising gold prices due to global trade protectionism and geopolitical uncertainties presents a favorable environment for Zhaojin Mining to capitalize on its resources [6][7]. - The company's proactive approach in expanding its overseas resource portfolio is expected to yield significant performance contributions in the future [7].
平庄煤业元露天矿:生态与科技的“双向奔赴”
Core Viewpoint - The company is transforming its mining operations into a green and intelligent model, integrating advanced technology with ecological restoration to achieve sustainable development and enhance overall efficiency [1][10]. Group 1: Technological Integration - The mining site utilizes a 5G network to create a comprehensive sensing system, enabling real-time tracking of over 450 workers and monitoring equipment status through intelligent inspection robots [9]. - The mining operations have adopted a digital twin system, allowing for millisecond-level coordination among various subsystems, enhancing the efficiency and safety of the mining process [9][10]. - The introduction of autonomous vehicles and smart machinery has reduced the need for manual labor, allowing for a more efficient and less hazardous working environment [9][10]. Group 2: Ecological Restoration - Since 2018, the company has invested 174 million yuan in land reclamation and ecological restoration, achieving a 100% reclamation rate and an 86.53% vegetation coverage rate [4][14]. - The company has planted over 2.2 million trees and completed various greening projects, significantly improving the landscape and biodiversity of the mining area [4][5]. - The mining site has been recognized as a national-level green mine, maintaining compliance with environmental standards through continuous monitoring and improvement [4][10]. Group 3: Sustainable Practices - The company has established a dual water recycling system, treating an average of 107,000 cubic meters of wastewater annually, thus maximizing water resource utilization [14]. - Dust control measures have led to a one-third reduction in PM2.5 concentration, showcasing the effectiveness of the implemented strategies [14]. - The introduction of energy-efficient technologies, such as the permanent magnet direct drive electric drum, has improved transmission efficiency by 22% and reduced carbon emissions by 810 tons annually [15]. Group 4: Future Development Goals - The company aims to further integrate cultural and tourism elements into its operations, creating a unique industrial heritage experience while promoting ecological tourism [6][10]. - The ongoing commitment to achieving carbon neutrality and sustainable development is central to the company's long-term strategy, positioning it as a leader in the green mining sector [15].
禾草沟煤业:绿色引领矿山高质量发展
延安市禾草沟煤业有限公司(以下简称禾草沟煤业)位于陕西省延安市子长市境内,自2010年9月全面开工建设以来,现年产能力500万吨。一直以来,禾草 沟煤业坚定践行绿水青山就是金山银山理念,坚定不移地将绿色发展融入矿山建设和员工生活中,致力于打造安全环保低碳的现代矿山。先后荣获"全国煤 炭系统文明单位""环境优美矿区"等称号。 安全环保置于首位 安全环保是矿山高质量发展的首要条件。禾草沟煤业立足新发展阶段,推动绿色低碳、清洁生产。禾草沟煤业党委今年多次召开环保专题会议,强调要践 行"人民至上、生命至上"和"生态优先、绿色发展"理念,履行生态环保第一责任人职责,统筹推进生态环境保护和安全生产工作。 禾草沟煤业领导通过现场办公强化源头污染防控,深化环保排查整治提升专项行动,建立督查组执行日巡查、旬通报、月考核制度,实施地面规范化管理, 开展动态巡查与集中检查,实现矿区环境"双提升"。修订30余项安全制度,完善411个岗位安全生产责任制;开展"三违"专项整治,编制八项措施并搭建AI 视频监控平台,构建"人防+技防"体系;推进安全文化建设,职工形成标准化作业习惯。 在生态治理方面,完成生活水净化站改造和污水处理厂扩容,实 ...