Workflow
供热
icon
Search documents
北京今冬供热准备情况如何?记者探访多家供热单位
Xin Jing Bao· 2025-10-30 13:09
Core Viewpoint - The company has completed extensive preparations for the upcoming heating season, ensuring that the heating systems are ready to operate efficiently and effectively in response to potential extreme weather conditions [1][5][7]. Group 1: Heating System Preparation - Beijing Thermal Power, a subsidiary of Jingneng Group, is responsible for a heating area of 376 million square meters in Beijing, serving 2.3 million users with 536 boiler rooms and a pipeline length of 2055 kilometers [5]. - The company has completed 544 maintenance projects across its facilities to eliminate equipment hazards and ensure stable operation for the heating season [3][5]. - The company has established a rapid response mechanism to address any issues that may arise during the heating season, ensuring timely resolution and stable operation of the heating system [5][7]. Group 2: New Infrastructure and Capacity - The newly constructed Rugou North Heavy Source Plant will officially operate this winter, featuring 10 gas-fired hot water boilers with a total heating capacity of 522 MW, covering an area of approximately 13.05 million square meters [2]. - The Jingxi Thermal Power Plant has a heating capacity of 919 MW, supporting over one-third of the western heating network in Beijing [2][3]. Group 3: Smart Heating System Upgrades - The company has implemented smart heating upgrades, covering an additional 25 million square meters this year, enhancing temperature stability for users during cold weather [4]. - The smart heating system allows for real-time monitoring and precise adjustments, reducing temperature fluctuations to within ±0.5°C, thus improving energy efficiency and reducing carbon emissions [4]. Group 4: Emergency Response and Service - The company has organized 15 emergency response teams with 276 personnel ready to address any heating emergencies, ensuring preparedness for the heating season [7]. - A multi-channel service network has been established to efficiently respond to user demands, including a hotline and online platforms, enhancing communication and service delivery [7].
北京全力备战供热,与“一老一小”相关热力站锅炉房将优先运行
Core Points - Beijing Thermal Group is fully preparing for the upcoming heating season, prioritizing the operation of heating stations and boiler rooms related to vulnerable groups and areas with concentrated heating demands from the previous season [1][3] - The company has completed maintenance on 19 core units across 7 gas power plants, ensuring optimal operational conditions at the start of the heating season [6] Group 1: Heating System Preparation - The heating area managed by Beijing Thermal has reached 376 million square meters, serving 2.3 million users with 536 boiler rooms and 5,350 heating stations [3] - A detailed scheduling system has been implemented, dividing the day into 48 time slots to match heating output with actual demand based on weather predictions [3][11] Group 2: Infrastructure Improvements - Over 40,000 equipment repairs and upgrades have been conducted, including the renovation of 555 kilometers of old heating pipelines and safety inspections of 12,700 heating small rooms [5] - The new Lugu North Peak Heating Source Plant, with a capacity of 522 MW and a heating area of approximately 13.05 million square meters, will officially start operation this heating season [7][9] Group 3: Smart Heating Initiatives - The company is advancing smart heating systems, having completed upgrades covering nearly 100 million square meters, with 25 million square meters added this year [11] - The implementation of intelligent monitoring systems in boiler rooms allows for real-time parameter tracking and emergency response capabilities, enhancing the resilience of the heating system [9][11]
全力备战今冬明春供热,与“一老一小”相关热力站锅炉房将优先运行
Core Points - Beijing Thermal Power is fully preparing for the upcoming winter heating season, prioritizing the operation of heating stations and boiler rooms related to vulnerable groups and previous heating season demands [1][2] - The company manages a vast heating network covering 3.76 billion square meters, serving 2.3 million households with 536 boiler rooms and 5,350 heating stations [2] - A meticulous scheduling system has been implemented, dividing the day into 48 time nodes to match heating output with actual demand based on weather predictions [2][3] Maintenance and Upgrades - Over 40,000 equipment repairs and upgrades were conducted during the summer, including the renovation of 555 kilometers of old heating pipelines [3] - A total of 544 maintenance projects were completed at the Beijing Western Gas Thermal Power Plant to ensure stable supply during peak winter demand [4] - All 19 core units across seven gas power plants have completed maintenance, ensuring optimal operation at the start of the heating season [4] Smart Heating Initiatives - The newly completed Rugus North Heavy Peak Heating Source Plant has a heating capacity of 522 megawatts, covering an area of approximately 13.05 million square meters [5] - The plant features an intelligent monitoring system for real-time parameter tracking and emergency response capabilities [6] - The smart heating initiative has expanded to cover nearly 100 million square meters, with over 20,000 temperature monitoring devices installed to address heating imbalances [6]
联美控股前三季净利润5.43亿元 同比增长6.88%
Zheng Quan Ri Bao Wang· 2025-10-30 10:45
Core Insights - Lianmei Quantum Co., Ltd. reported a slight decline in revenue for the first three quarters of 2025, totaling 2.155 billion yuan, while net profit attributable to shareholders increased by 6.88% to 543 million yuan [1] Group 1: Business Performance - The company focuses on urban clean heating services and has optimized its business layout through strategic partnerships and project acquisitions to enhance market share [1] - The implementation of a smart control pilot project for secondary pipelines marks a shift from traditional experience-based heating control to a modern data-driven approach [1] Group 2: Technological Innovation - Lianmei has developed the "Lianmei Smart Operation Platform," creating a complete technological closed loop from data perception to intelligent analysis and automatic execution [1] - The company aims for low-carbon, clean, and efficient development by exploring innovative clean energy technologies, contributing to the establishment of a modern energy system [1] Group 3: Urban Infrastructure Integration - Leveraging national funding for urban infrastructure updates, Lianmei integrates smart heating construction with urban renewal initiatives [2] - The company is upgrading traditional heating networks to smart heating networks equipped with sensing, analysis, and optimization capabilities through the installation of smart control devices and IoT sensor systems [2] - Lianmei actively participates in urban renewal and clean heating projects, expanding its heating coverage and solidifying its market leadership [2]
@供热企业:供暖季来临,这些税收政策可享受!
蓝色柳林财税室· 2025-10-30 10:14
Group 1 - The core viewpoint of the article is the tax exemption policy for heating enterprises providing heating services to residents, which includes VAT exemption on heating fees from January 1, 2019, to the end of the heating period in 2027 [3][4][11]. - The heating enterprises eligible for this policy include specialized heating enterprises, mixed heating enterprises, and self-supplying heating units [2][10]. - The regions that can enjoy these tax benefits include Beijing, Tianjin, Hebei, Shanxi, Inner Mongolia, Liaoning, Dalian, Jilin, Heilongjiang, Shandong, Qingdao, Henan, Shaanxi, Gansu, Qinghai, Ningxia, and Xinjiang [6][13]. Group 2 - The conditions for enjoying the VAT exemption include that the heating fees collected from residents must be separately accounted for, and the exemption is calculated based on the proportion of heating fees from residents to the total heating fee income [4][12]. - For mixed heating enterprises, the exemption calculation depends on whether the heating facilities can be distinguished from other business activities [12][13]. - The policy is based on several official documents, including the Ministry of Finance and the State Administration of Taxation's notifications regarding the extension of tax exemption policies for heating enterprises [7][14].
通州区市场监管局开展供暖季特种设备监督检查
Xin Jing Bao· 2025-10-30 05:05
Core Viewpoint - The Tongzhou District Market Supervision Administration is enhancing supervision and inspection of heating-related special equipment to ensure safe operation as the heating season approaches [1][2]. Group 1: Safety Inspections - The administration is conducting on-site inspections of heating units, focusing on the regular inspection status, operational conditions, and certification of personnel [1]. - Inspections include verifying equipment registration certificates, inspection reports, and the authenticity of qualifications for safety management and operational personnel [1]. Group 2: Safety Management and Compliance - The administration emphasizes the importance of safety management responsibilities for special equipment users, requiring immediate rectification of any issues found during self-inspections [2]. - A "zero tolerance" policy is enforced for safety management, with a focus on early detection and elimination of safety hazards [2]. Group 3: Ongoing Monitoring - After the official heating period begins, the administration will continue rigorous monitoring through a combination of strict regulation and service guidance, increasing the frequency of inspections [2].
11月8日郑州热力集团 各热源将陆续投热升温
Zheng Zhou Ri Bao· 2025-10-29 02:04
Core Points - Zhengzhou Thermal Group has fully initiated winter heating preparations in October, with heating sources set to gradually start heating from November 8 [3][4] - The city expects to add 12.48 million square meters of heating area by 2025, representing a 10% increase, with a total of 1.56 billion square meters of actual heating area [4] - The group is actively advancing integrated regional heating management, taking over 5.94 million square meters of heating tasks this winter, including 1.06 million square meters for new users [4] - By the 2025-2026 heating season, the group will operate 16 heating sources with a maximum comprehensive heating capacity of 7,921 MW [5] Heating Capacity and Infrastructure - The heating system is prepared with all necessary steps completed, including water injection, pressure testing, and defect elimination [4][6] - The northern region of Zhengzhou will see the completion of municipal centralized heating pipelines and supporting projects by 2025, introducing two power plants to enhance heating capacity by 2,100 MW [4][7] - The heating supply will be primarily from six combined heat and power plants, accounting for 80% of the total heating capacity, while ten gas boiler houses will contribute the remaining 20% [5] User Integration and Safety - Zhengzhou Thermal Group has been actively verifying new heating projects, with 119 new heating projects passing inspection so far this year [8] - The group follows a public announcement system for new users, determining heating eligibility based on project completion and inspection order [8] - Projects that do not meet safety or heating quality standards will not be allowed to use heating until they pass inspection [8]
低温来袭多地提前供暖 应急维护、24小时值守保障温暖过冬
Yang Shi Wang· 2025-10-28 01:55
央视网消息:按照入冬的标准,也就是连续5天平均气温均低于10℃。在这个标准下,上周,我国的冬季前沿已经抵达陕西南部、 河南北部、山东中部一线。近期,北方气温大幅偏低,特别是17日至22日,下半年来最强冷空气持续扩散南下,快速推动华北多地 提前进入冬季。对此,多地开始提前供暖。 陕西府谷:持续降雨低温 提前一个月开启集中供暖 受持续降雨低温影响,陕西榆林府谷县提前一个月开启集中供暖,成为陕西今年首个启动供暖的地区。针对老旧小区设施相对薄弱 的情况,供热企业组建了应急维护队伍,24小时全天候待命。 宁夏:多地提前供暖 新修订供热条例下月实施 近期宁夏多地气温也明显下降,固原、石嘴山、吴忠等地已提前供暖。下月起,宁夏将施行新修订的供热条例,提高了供热温度标 准,还推动供热计量收费改革,并首次以立法形式要求供热单位建设智能监测系统,进一步提升供热服务质量与效率。 新疆吐鲁番:启动全面供暖 持续至明年3月底 新疆吐鲁番市25日全面启动供暖,供热企业内供暖机组正满负荷运转,技术人员24小时轮班值守。 此外,供热企业还组建应急队伍配备应急人员,确保群众温暖过冬。据了解,供暖期将持续到明年3月25日。 ...
全长110公里!“超级暖气管”全线贯通
中国能源报· 2025-10-27 12:19
Core Points - The "Liaohe into Jinan" project has successfully completed the northern line, marking the longest and largest heat supply pipeline in China, with a total length of 110 kilometers and a diameter of 1.6 meters [1][3] - The project utilizes waste heat from the Xinyuan Power Plant in Liaocheng to provide clean heating to Jinan, significantly reducing coal consumption and carbon emissions during the heating season [3][5] - The southern line of the project is expected to be completed by the end of the year, bringing the total length of the north-south lines to approximately 150 kilometers, capable of heating 1 million square meters [5] Summary by Sections - **Project Overview**: The "Liaohe into Jinan" project aims to convert waste heat from Liaocheng's power plant into a clean heating source for Jinan, addressing the city's increasing heating demand and energy structure adjustment [3][7] - **Environmental Impact**: The project is projected to reduce coal consumption by 1.2989 million tons and cut carbon dioxide emissions by 3.564 million tons each heating season, equivalent to the carbon sequestration of four Saihanba forests in a year [5] - **Construction Challenges**: The project spans three cities and five counties, passing through 140 natural villages, with significant construction challenges, particularly the southern line's tunnel under the Yellow River, which required overcoming high water pressure and complex geological conditions [5][7] - **Future Developments**: By the end of the year, all 54 coal-fired heating boilers in Jinan's main urban area will be shut down, further enhancing the city's environmental sustainability [7]
渤海股份:10月27日召开董事会会议
Mei Ri Jing Ji Xin Wen· 2025-10-27 10:57
Group 1 - The core point of the article is that Bohai Co., Ltd. announced the results of its board meeting and provided insights into its revenue composition for the first half of 2025 [1] - The board meeting was held on October 27, 2025, and reviewed the Q3 2025 report among other documents [1] - As of the report, Bohai Co., Ltd. has a market capitalization of 2.6 billion yuan [1] Group 2 - For the first half of 2025, the revenue composition of Bohai Co., Ltd. is as follows: heating services accounted for 43.8%, raw water 24.45%, tap water 20.42%, sewage treatment 9.54%, and other businesses 1.8% [1]