Workflow
公共交通
icon
Search documents
北京拟再对6条公交线路优化调整,涉及丽泽路等地
Group 1 - The Beijing Municipal Transportation Commission is seeking public opinions on the optimization adjustment plan for six bus routes, including routes 74 and 83, to accommodate the reopening of Lize Road [1][2] - Route 74 will revert to its original route, with the starting and ending stations at Caihuying West Road and the New Palace Gate of the Summer Palace, adding stops at East Guantou Station, Lize Business District, and Lize Business District East, while canceling temporary detours [2] - Route 83 will also return to its original route, with starting and ending stations at Yihai Garden West Gate and Xidan South Road, adding the same stops as Route 74 and canceling temporary detours [4] Group 2 - Route 26 will be adjusted to add stops at Guang'anmen West Street and Shoupakou North Street to meet the travel needs of residents in nearby communities [11] - Route 618 will be adjusted to reduce overlap with the subway Line 2, adding stops at Bingjiao Kou West (one-way) and Deshengmen West, while canceling stops at Xinjiekou Huokou (one-way), Yutao Garden, Xizhimen South, Fuchengmen North, Fuchengmen South, and Yuetan Sports Center [14] Group 3 - The public feedback process for bus route adjustments has shifted to the Beijing Municipal Transportation Commission, which will implement a new mechanism for regular public consultation [18] - A total of 28,056 people participated in the feedback process, with 10,840 expressing disapproval, including 9,844 through online channels, 846 via phone, 148 by email, and 2 by registered mail [18] - The feedback indicated high approval rates for several routes, with 99.30% for Route 53, 96.59% for Night Route 17, and 19.78% for Route 458, which will undergo further optimization due to its low approval rate [18]
尊重乘客意见,北京将再优化两条低赞成率公交线路调整方案
Xin Jing Bao· 2025-05-27 03:36
Core Viewpoint - The Beijing Municipal Transportation Committee is actively seeking public opinions on bus route adjustments, with a focus on optimizing services while addressing citizen concerns regarding specific routes, particularly the 106 and 458 lines, which have faced significant opposition [1][2][3]. Group 1: Public Opinion Collection - A total of 28,056 individuals participated in the opinion collection, with 10,840 expressing disapproval, indicating a notable level of engagement from the public [3]. - The approval rates for most bus route adjustments were high, with routes like the 53 line receiving 99.30% approval, while the 458 line had a low approval rate of 19.78% [3][4]. Group 2: Route Adjustments - The proposed adjustments for the 458 line include the removal of certain stops and the withdrawal of the route from Beijing South Station, with new endpoints at Caihuying Bridge West [4]. - The 106 line's adjustments aim to enhance service to local communities while also removing it from Beijing South Station, with new endpoints at Cuilin Community [4]. Group 3: Community Concerns - Residents have expressed concerns that the removal of the 458 and 106 lines could significantly inconvenience them, especially during weekends and holidays when demand for these routes is higher [5].
小巷公交提升居民幸福感
Jing Ji Ri Bao· 2025-05-27 00:32
Core Viewpoint - The development of small alley buses in Jinan is enhancing urban mobility by filling service gaps in traditional public transport, providing convenience for daily commuting, and connecting cultural and commercial areas [1][2][3] Group 1: Small Alley Bus Implementation - Jinan has launched 33 small alley bus routes as of May this year, with a daily ridership exceeding 30,000 [1] - These buses are designed for narrow roads and alleys, offering point-to-point and door-to-door services, thus improving connectivity between residential areas and major transport hubs [1][2] Group 2: Economic and Operational Benefits - The use of small buses addresses the operational challenges of traditional large buses, which are often uneconomical for low passenger volumes [2] - Smaller buses have lower acquisition and maintenance costs, reducing operational pressure on companies amid declining passenger numbers [2] Group 3: Focus on Community Needs - The development of small alley buses is guided by community needs, with a focus on precise research and resource allocation based on road conditions and passenger flow [3] - The service aims to cater to specific demographics, such as the elderly, children, and commuting workers, enhancing the overall public transport experience [3]
北京地铁1号线八角游乐园站将于6月2日起封站 将加强公交运力、加大共享单车投放
Bei Jing Shang Bao· 2025-05-23 12:46
Core Viewpoint - The Beijing Municipal Transportation Commission announced the closure of the Bajiao Amusement Park Station on Line 1 for renovation starting June 2, 2025, with plans to restore operations by May 2027, aiming to enhance transportation convenience in the southwestern part of the city [1]. Group 1: Renovation Details - The renovation will involve expanding the station into a two-level underground facility, adding four new entrances and two pedestrian overpass passages, and improving the interchange between Line 1 and its branch line [1]. - The branch line will be approximately 21 kilometers long, consisting entirely of underground tracks with a total of 10 stations, including 9 new stations and the renovated Bajiao Amusement Park Station [1]. Group 2: Transportation Measures During Closure - To mitigate the impact of the station closure, the transportation department will enhance bus services during peak hours, optimize bus transfer points, and increase the number of buses on routes connecting to nearby subway stations [2]. - Specific bus routes, such as 527, 597, and specialized routes, will have their services adjusted to ensure efficient connections to the subway [2]. - Shared bicycle services will be expanded in the vicinity, with additional parking areas and increased availability to facilitate local residents' mobility [2]. Group 3: Passenger Information and Support - The transportation authority will implement a passenger information plan, including announcements at stations, electronic displays, and media outreach to keep passengers informed about travel updates [3]. - Staff training and emergency drills will be conducted to ensure personnel are well-prepared to assist passengers during the renovation period [3].
“幸福专线”来了 老人“抬脚上车”
Hang Zhou Ri Bao· 2025-05-23 02:22
Group 1 - The introduction of a new bus stop at Hangzhou's Third Social Welfare Institute has significantly improved transportation access for the elderly residents, allowing them to travel more easily for various purposes such as visiting family or going to the bank [2][3] - The previous bus route, 535, no longer stopped at the institute, requiring residents to walk 20 minutes to the nearest bus stop, which was inconvenient for the average age of 84 among the 1300 residents [2] - The collaboration between the welfare institute and Hangzhou Bus Group led to the establishment of a dedicated bus service (Route 135) that directly serves the institute, enhancing mobility for the elderly [3] Group 2 - The new bus service operates daily from 7:30 AM to 5:00 PM, transforming the institute from an "island of isolation" to a more accessible location for the elderly [3] - Security measures have been implemented at the bus stop, including personnel to assist residents and ensure safety during boarding and alighting [3] - Future plans include making the bus stop more senior-friendly by adding supportive seating and wheelchair-accessible pathways, as well as providing information on public transport connections [3]
地铁公交部分线路运营服务时间有变
Zheng Zhou Ri Bao· 2025-05-23 00:24
Group 1 - Zhengzhou Olympic Sports Center will host a large event on May 24, prompting the Zhengzhou Metro to prepare and optimize passenger transport services to ensure smooth travel for attendees [1] - The metro will adjust its operational capacity and train schedules, extending the last train departure times for Line 6 to 22:40 and Line 10 to 23:00 to meet passenger demand [1] Group 2 - On the same day, Zhengzhou Bus will launch a "Concert Special Line" to facilitate smooth travel for concert-goers [2] - The special line will operate immediately after the concert ends, with buses departing from the North Gate of the Olympic Sports Center and following a designated route to the West Construction Road [3] - Zhengzhou Bus will adjust the operation plans of several bus routes starting from 15:00 to accommodate the expected passenger flow, deploying additional vehicles and increasing service frequency [3] - Volunteers from the "Tiger Ping Party Member Help Team" will assist in maintaining order and guiding concert-goers [3] - The "Concert Special Line" will offer complimentary services such as drinking water, emergency medicine, and umbrella rentals, along with luggage storage to enhance the experience for attendees [3] - Traffic control measures will be implemented around the event venue, and attendees are advised to plan their travel accordingly, prioritizing public transport [3]
年减排二氧化碳超五千吨,烟台公交智能充电项目入选省典型案例
Qi Lu Wan Bao Wang· 2025-05-22 06:53
Core Viewpoint - The successful implementation of the "Intelligent and Orderly Charging of Buses Driven by Virtual Power Plants" project by Yantai Public Transport Group has been recognized as a typical case for green and low-carbon development in Shandong's transportation sector, providing valuable experience for the industry's transition towards sustainability [1][2]. Group 1: Project Overview - The project utilizes a digital virtual power plant platform to optimize charging times for bus charging stations through intelligent algorithms and big data analysis, achieving smart scheduling and low-carbon operations [1]. - Real-time data collection on charging station status and power, combined with grid load, electricity price fluctuations, and renewable energy generation, allows for dynamic adjustment of charging power and timing [1][2]. Group 2: Economic and Environmental Impact - The project is expected to generate over 700,000 yuan annually from participating in electricity market transactions and reducing idle costs of charging stations [2]. - The system's adjustment capability reaches 8.834 megawatts, effectively managing peak and off-peak loads, ensuring stable electricity supply [2]. - Annually, the project can reduce carbon dioxide emissions by over 5,000 tons, significantly contributing to urban green development [2]. Group 3: Broader Implications and Future Prospects - The project's technology and management experience can be replicated in other cities' public transport systems, especially in areas with high grid load pressure [2]. - With increasing national support for new energy and smart grid construction, the market prospects for this project are promising [2]. - The recognition as a provincial-level typical case highlights the innovative practices of Yantai Public Transport Group in green and low-carbon initiatives, paving the way for further technological applications and project expansions [2].
天津公交智能驾驶启动载人试运行
news flash· 2025-05-20 11:11
Core Viewpoint - Recently, Tianjin's public transportation has initiated a pilot operation of smart driving vehicles, achieving L4 level autonomous driving standards [1] Group 1: Vehicle Specifications - The vehicle has a length of 5.5 meters and a maximum autonomous driving speed of 36 kilometers per hour [1] - It is equipped with 4 LiDARs, 2 millimeter-wave radars, and 16 cameras, providing 360-degree monitoring of the surroundings [1] - The interior features 10 soft seats and 1 small table, with no traditional driving components such as a steering wheel, brake, or accelerator pedals [1]
40年来首次 美国新泽西客运公司遭遇罢工 35万人受影响
news flash· 2025-05-17 01:21
Core Points - New Jersey Transit has experienced its first strike in 40 years due to failed labor negotiations, affecting over 350,000 commuters [1] - The strike began at midnight on May 16, with the engineers' union organizing the action after management withdrew from negotiations [1] - New Jersey Transit has announced increased capacity on existing bus routes and recommended remote work for commuters [1] Company Impact - The strike has led to a complete shutdown of the rail system, with no new trains operating and only in-transit trains completing their journeys [1] - Concerns have been raised about the long-term financial health of New Jersey Transit, with the CEO warning that meeting union demands could lead to a "death spiral" for the company's finances [1]
薪资谈判失败,美国新泽西公共交通面临近四十年首度重大铁路罢工
news flash· 2025-05-16 04:02
新泽西交通机车工程师将于周五罢工,这将导致该机构的铁路服务关闭。此次罢工将是该运输机构40多 年来的第一次铁路罢工,此前,新泽西运输公司(NJ Transit)与机车工程师和火车工人兄弟会 (Brotherhood of Locomotive Engineers and Trainmen)未能就一份新合同达成一致。 ...