雅居乐中央雅府
Search documents
观楼|邦泰·观云加推成交均价19555元/㎡,大商汇旁约50亩优质宅地上架
Xin Lang Cai Jing· 2025-11-17 09:36
上周(2025年11月10日-16日),昆明楼市成交量稳价涨,高端改善楼盘占比攀升,最高成交均价约21795元/㎡,大商汇旁约50亩优质宅地上架。官渡区文 化生态新城五甲塘分区城中村改造将启动配套设施建设,大理实力希尔顿酒店7.87亿元起拍卖;昆华国际医院东院三期选址凉亭片区,计划2027年底完工; 昆明前三季度旅居人数114万,同比增长41.5%。 据克而瑞发布的最新数据显示,上周昆明共计3个项目向市场供应了约1.44万㎡,环比下降82%;成交约4.7万㎡,环比略涨1%;成交均价约12629元/㎡,环 比上涨10%。 (图源:克而瑞) 从"双榜"情况来看,南市区四代宅项目邦泰·观云加推热销,位居双榜榜首。销售金额约0.46亿元,成交14套,成交均价高达19555元/㎡,套均价约326万/ 套。 一环内的豪宅项目艺城·春城玖號,则以销售金额约0.22亿元,成交12套的成绩,分别位列第三、第四。成交均价高达21795元/㎡,套均价约180万/套,成为 榜单上价格最高的楼盘。 (艺城·春城玖號项目实拍图) 据项目官微消息,艺城·春城玖號已于10月份全面交付,为全现房销售状态。 此外,龙江金茂府、龙湖新希望锦粼天曜 ...
观楼|麦溪村城改项目将分三期开发,昆明首个保租房市场化运营项目落地
Xin Lang Cai Jing· 2025-08-12 09:11
Group 1 - The overall average price of the Kunming real estate market increased by 5% due to the launch of high-priced projects [1] - Only one project supplied 20,800 square meters, a decrease of 11% week-on-week, while transaction volume fell by 34% to 52,300 square meters [1] - The average transaction price was approximately 12,524 yuan per square meter, reflecting a 5% increase [1] Group 2 - The Huaren Center continued to perform well after regulatory adjustments, ranking first and fifth with sales of 52 million yuan and an average transaction price of about 18,440 yuan per square meter [3] - The first fourth-generation residential project in Chenggong, Bangtai Chunhua Xu, ranked second and first with sales of 42 million yuan and an average price of about 9,960 yuan per square meter [3] - The highest-priced property, located in the exhibition area, achieved sales of approximately 30 million yuan with an average price of 26,527 yuan per square meter [3] Group 3 - Two land parcels were successfully sold at the base price in Kunming's main urban area, with one in Wuhua District sold for approximately 55.12 million yuan and the other in Xishan District for about 340 million yuan [4] - The land in Wuhua District was acquired for a floor price of about 1,139 yuan per square meter, designated for resettlement housing [4] - The Xishan District land was sold for a floor price of about 6,866 yuan per square meter, with a plot ratio between 1 and 3.1 [4] Group 4 - The Maixi Village urban renewal project in Panlong District was approved for phased development, covering a total area of approximately 1,353.89 acres [6] - The project includes significant residential and educational land adjustments, with a total demolition area of about 846,800 square meters [9] - The project aims to develop a high-quality low-density residential area, with the first phase including a middle school and resettlement housing [7] Group 5 - The construction of supporting infrastructure for the Xiaoyao Village and Dabo Village urban renewal projects has entered the bidding phase, with an estimated construction cost of about 30 million yuan [11] - The Xiaoyao Village project will include approximately 29.75 acres of resettlement housing and over 110,000 square meters of total building area [11] - The Dabo Village project is located in a core area and covers a total area of 332.02 acres [11] Group 6 - The first market-oriented rental housing pilot project in Kunming has officially launched, with two projects providing a total of 901 rental units [13] - The third floating bridge on the Dianchi Lake is expected to be completed by late September, enhancing connectivity between the east and west banks [14] - The 2025 distribution of affordable rental housing in Kunming has begun, with 396 units available at a starting rent of 12.46 yuan per square meter [14]
观楼|上周昆明2个纯新楼盘首开,成交均价相差超万元
Xin Lang Cai Jing· 2025-06-09 10:12
Market Overview - In the week of June 2-8, 2025, Kunming's real estate market saw the launch of 4 projects, with 2 new developments making their debut. The main transaction types were units sized 140-160㎡ and those under 90㎡ [1] - The total supply in Kunming's real estate market was 134,200㎡, representing a 491% increase week-on-week, while transactions totaled 47,300㎡, showing a 26% decrease. The average transaction price remained stable at approximately 12,601 yuan/㎡ [1] Project Performance - The top 5 projects by sales value were all high-end improvement-type developments, with sales ranging from 0.19 billion to 0.3 billion yuan and average prices between 16,162 yuan/㎡ and 19,139 yuan/㎡ [2] - The top 5 projects by sales volume included Jinma Tengyuan and Yajule Central Yafu, with sales ranging from 11 to 19 units and average prices between 8,319 yuan/㎡ and 17,701 yuan/㎡ [2] New Developments - New Hope·Jinguangfu launched with a high average occupancy rate exceeding 100%, successfully selling 67 out of 248 units, achieving a 27% absorption rate [3] - The project Puyue ONE also launched, offering 146 high-rise units with a 37% absorption rate, selling 54 units [4] Infrastructure Developments - The opening of the Feihu Avenue section from Guangfu Road to Wand Street, measuring approximately 1.38 kilometers, is expected to alleviate traffic pressure and enhance regional connectivity [12][15] - The Kunming Municipal Government announced a three-year land supply plan, indicating a gradual decrease in total supply area, focusing on residential, industrial, transportation, and public service sectors [16][17] Land Supply Trends - The total land supply in Kunming is projected to decrease from 1,094.62 hectares in 2025 to 818.15 hectares by 2027, with a shift in focus towards industrial and commercial land [16][17] - Residential land supply is expected to fluctuate but remain consistent, with a peak of 161.79 hectares in 2025, primarily in Guandu and Chenggong districts [16][17]