Workflow
DEC(600875)
icon
Search documents
东方电气:公司已在全国布局超15个(含在投)主机制造基地
Mei Ri Jing Ji Xin Wen· 2025-12-31 09:29
Core Viewpoint - The company has established over 15 wind turbine manufacturing bases across the country, indicating a significant investment in domestic wind energy production [1] Group 1 - The company has more than 15 wind turbine manufacturing bases, including those under construction, indicating a strong presence in the domestic market [1] - The average transportation distance for wind turbine deliveries was inquired about, highlighting logistical considerations in the wind energy sector [1] - The question regarding the average blade length for offshore wind power compared to onshore wind power suggests a focus on the technical challenges associated with larger turbine components [1]
东方电气(600875.SH):公司目前暂未参与2MWt液态燃料钍基熔盐实验堆项目
Ge Long Hui· 2025-12-31 09:24
格隆汇12月31日丨东方电气(600875.SH)在投资者互动平台表示,公司目前暂未参与2MWt液态燃料钍基 熔盐实验堆项目。 ...
东方电气:东方电气已形成氢能“制储加用”全产业链解决方案及相关服务
Mei Ri Jing Ji Xin Wen· 2025-12-31 09:23
Group 1 - The core message indicates that Dongfang Hydrogen Energy has achieved record-high performance in 2023, with contracts related to hydrogen equipment increasing by over 400% year-on-year and revenue from hydrogen equipment rising by over 200% [1] - Dongfang Electric (600875.SH) confirmed on the investor interaction platform that it has developed a comprehensive solution for the hydrogen energy industry, covering production, storage, transportation, and utilization [1]
东方电气:公司已在全国布局超15个(含在投)主机制造基地
Ge Long Hui· 2025-12-31 09:23
格隆汇12月31日丨东方电气(600875.SH)在投资者互动平台表示,公司已在全国布局超15个(含在投)主机 制造基地。 ...
东方电气:公司目前暂未参与2MWt液态燃料钍基熔盐实验堆项目
Mei Ri Jing Ji Xin Wen· 2025-12-31 09:22
东方电气(600875.SH)12月31日在投资者互动平台表示,公司目前暂未参与2MWt液态燃料钍基熔盐 实验堆项目。 (记者 王晓波) 每经AI快讯,有投资者在投资者互动平台提问:中国科学院上海应用物理研究所牵头建成的2MWt液态 燃料钍基熔盐实验堆,贵司有没有参与并提供设备? ...
东方电气(600875.SH):公司已在全国布局超15个(含在投)主机制造基地
Ge Long Hui· 2025-12-31 09:17
Group 1 - The core viewpoint of the article is that Dongfang Electric (600875.SH) has established over 15 main engine manufacturing bases across the country, including those currently under construction [1] Group 2 - The company is actively expanding its manufacturing capabilities by strategically positioning its facilities nationwide [1] - This expansion is indicative of the company's commitment to enhancing its production capacity and meeting market demands [1] - The establishment of these bases may provide the company with a competitive advantage in the industry [1]
东方电气:公司在攀枝花、东方氢能产业园的相关产线均正常推进建设
Mei Ri Jing Ji Xin Wen· 2025-12-31 09:12
Group 1 - The core viewpoint of the article is that Dongfang Electric is making progress in the construction of fuel cell production lines in Panzhihua and the Dongfang Hydrogen Energy Industrial Park [1] - Dongfang Electric confirmed that the relevant production lines in both locations are advancing normally [1] Group 2 - Investors inquired about the status of the collaboration between Dongfang Electric and Sinopec in Jiangxi, specifically regarding the infrastructure development [1] - Dongfang Electric did not provide specific details on the number of production lines completed in Panzhihua and the Dongfang Hydrogen Energy Industrial Park [1]
东方电气(600875.SH):目前未参与甘肃钍基镕盐堆项目
Ge Long Hui· 2025-12-31 08:50
格隆汇12月31日丨东方电气(600875.SH)在互动平台表示,东方电气目前未参与甘肃钍基镕盐堆项目。 ...
东方电气(600875.SH):小型核电站方面,东方电气主要是设备供应
Ge Long Hui· 2025-12-31 08:43
格隆汇12月31日丨东方电气(600875.SH)在互动平台表示,小型核电站方面,东方电气主要是设备供 应。 ...
东方电气(600875.SH):公司超超临界市场占有率大约为三分之一
Ge Long Hui· 2025-12-31 08:23
Group 1 - The core viewpoint of the article is that Dongfang Electric (600875.SH) holds approximately one-third of the supercritical market share [1] Group 2 - The company has communicated this information through an interactive platform [1]