MONGOLIA ENERGY(MOAEY)
Search documents
内蒙古能源集团:“汛”速行动 筑牢“安全堤”
Zhong Guo Jin Rong Xin Xi Wang· 2025-07-10 05:44
Group 1 - The northern region is entering the traditional rainy season, posing challenges for energy production companies in terms of flood prevention and control [1] - Inner Mongolia Energy Group is establishing a closed-loop system for flood prevention, including basic management, hazard control, emergency response, equipment assurance, and construction management [1][3] - The company has implemented a dual insurance mechanism of "leadership on duty + 24-hour monitoring" and has developed a special flood prevention plan [3] Group 2 - Jinshan Thermal Power Company is closely monitoring weather conditions and has placed over 1,400 flood bags at 40 key flood prevention points [5] - The company has formed a cleaning team to clear drainage systems and has taken measures to protect critical equipment from water damage [5] - Xilin Thermal Power Company emphasizes a proactive approach to flood prevention, focusing on both prevention and response [5] Group 3 - The company has conducted a comprehensive self-inspection of communication equipment, flood prevention facilities, and emergency supplies to ensure readiness in case of emergencies [7] - The drainage capacity is crucial for the safe and stable operation of units during the rainy season, with regular inspections of various pump rooms being conducted [7] - The ongoing heating network technical transformation project faces challenges due to heavy rainfall, with safety management personnel monitoring weather forecasts [7] Group 4 - Great Wall Power Company utilizes a detailed management system that includes responsibility lists, tiered inspections, and emergency drills to effectively respond to flood challenges [8] - The company has assigned specific inspection tasks to personnel for key areas and conducts thorough checks during heavy rainfall [8] - Emergency operation procedures are practiced to ensure quick response in case of unexpected situations [8]
【财经早报】今起停牌!002765,筹划控制权变更
Zhong Guo Zheng Quan Bao· 2025-07-07 23:22
Group 1: Industry Developments - The National Development and Reform Commission aims to establish over 100,000 high-power charging facilities nationwide by the end of 2027, enhancing service quality and technology applications [2] - The State Administration for Market Regulation has implemented national standards for civil drone manufacturing, reducing costs and enhancing commercialization capabilities [2] - The Shanghai Municipal Government has introduced measures to promote high-quality development in the software and information services industry, encouraging rewards for companies exceeding certain revenue and growth thresholds [3] Group 2: Company News - BlueDai Technology is planning a change in control, with its stock suspended from trading starting July 8, 2023, due to the potential transfer of 18% of shares [4] - Xianggang Technology expects a net profit increase of 410% to 478% year-on-year for the first half of the year [4] - Industrial Fulian anticipates a net profit increase of 36.84% to 39.12% year-on-year for the first half of the year [5] - Huadian Science and Technology signed contracts worth approximately 2.516 billion RMB for coal yard design and construction, which is expected to account for 33.37% of the company's latest audited revenue [10]
内蒙古能源集团:烈日灼灼 新能源项目奋战当“夏”
Zhong Guo Neng Yuan Wang· 2025-06-27 08:36
"夏至"时节,灼灼烈日炙烤着广袤大地,集团公司新能源项目建设现场"热"情似火,各大工地机械轰鸣、人影攒动,大家以奋斗为 笔、以汗水为墨,书写着实干担当的"新"答卷。 达茂20万千瓦风电项目现场施工繁忙有序。项目部科学制定施工计划,明确关键节点与任务时间,强化现场统筹协调,合理配置人 员设备,优化工艺提升效率。与设计、总包、监理、施工等单位建立定期会商机制,及时破解技术难题。截至目前,风机基础浇筑完成 11台,占比55%;综合楼浇筑完成70%,附属用房进行一层钢筋绑扎,设备区事故油池、架构等基础浇筑全部完成;升压站电气设备区 主变、SVG、独立避雷针安装完成100%,GIS预制舱舱体已就位,35kV预制舱及设备安装完成70%,风机设备正在组织交付。 锡林郭勒中心 蒙中中心 东苏特高压外送新能源三期基地32万千瓦风储项目各项工程全面推进:临建工程全部完工;道路整平、碎石填筑完成,现已进入维 护阶段;升压站围墙砌筑完成,柱体浇筑36%;服务楼基础施工完成,地圈梁钢筋绑扎完成20%;SVG基础钢筋绑扎完成60%。风机基础 主体施工全部完成,二次灌浆完成24基,观测墩完成32基。 赤峰中心 d 7 8 1 e 0 t ...
内蒙古能源集团:“项”上发力 “火”热建设
Zhong Guo Neng Yuan Wang· 2025-06-27 08:29
Group 1 - The construction of the Jinshan Phase III project is progressing rapidly, with nearly 3,000 workers on site and significant equipment installation underway [4][8] - The project aims to achieve the goal of commissioning two units by the end of the year, with a focus on accelerating construction and ensuring safety management [4][8] - As of now, 20 milestone nodes have been completed, with 12 ahead of schedule, and overall progress is at 70%, entering the installation and debugging phase [8] Group 2 - The construction of the Zhunda Phase II project is characterized by meticulous management, with over 2,000 workers engaged in various tasks, including the precise installation of turbine generator bases [11][14] - A 24-hour coordination mechanism has been established among participating units to address design conflicts and ensure timely equipment delivery, achieving a 98% completion rate for design drawings [14] - Currently, the installation progress for the turbine generator body is at 10% for Unit 1 and 5% for Unit 2, with significant advancements in boiler and auxiliary systems [14] Group 3 - The construction of the Jinshan Phase IV project is utilizing advanced modular construction techniques to streamline operations and improve efficiency [16] - The Baotou Xiguitu power project is focused on building a first-class demonstration project, with 50% completion of the main plant foundation and 70% completion of ground treatment [19]
内蒙古能源集团:告别“能耗焦虑”→节能降耗出实招
Zhong Guo Neng Yuan Wang· 2025-06-23 12:55
在"双碳"目标引领下,内蒙古能源集团主动担当绿色低碳发展重任,聚焦聚力内部节能降耗管理,所属能源生产单位全面落实节能 降耗目标责任制,通过施行一项项务实举措,将节能降耗转化为高质量发展的澎湃动力。 清晨的阳光明朗地洒在集控室的显示屏上,运行值班员正仔细地记录着机组各项运行参数。"看,这个月一期引风机耗电率又降了 0.17个百分点!"他指着电脑屏幕对同事说。这样的细节变化,正是金山热电公司今年以来扎实推进节能降耗管理工作的点滴成效。 年初,内蒙古能源集团下达年度生产指标目标值后,运行部迅速行动,将总体目标科学分解为月度计划,建立了"日跟踪、周分析、 月对标"的动态管理机制。每月与行业标杆机组数据进行详细对比,技术人员通过"抽丝剥茧"式的分析查找差距,制定优化运行方案。其 中,通过调整二期主机循环泵运行方式,实现耗电率同比降低0.12个百分点;针对给水泵运行效率问题,优化变频调节策略后,耗电率 同比下降0.34个百分点。 从数据看成效,从细节见真章。在上一个供热季结束后,该公司根据季节特点动态调整小指标评比方案,实时优化各项指标的奖惩 比例,对节能降耗贡献突出的班组和个人加大奖励力度。这一举措有效调动了一线职工的 ...
复牌涨停!002762控制权拟变更
Zheng Quan Ri Bao Wang· 2025-06-12 03:01
Group 1 - The company *ST Jinbi (002762) has experienced a stock price surge, reaching a limit up at 6.47 yuan per share following the announcement of a change in control [1] - Shanghai Yuancheng Chengwu Technology Co., Ltd. will become the controlling shareholder, with Chen Keru as the actual controller of the company [1][2] - The share transfer agreement involves Lin Haoliang and Lin Ruowen transferring a combined 13.3% of the company's total shares to Yuancheng Chengwu at a price of 7.34 yuan per share, totaling approximately 346 million yuan [1][2] Group 2 - Following the first share transfer, Yuancheng Chengwu will hold 13.3% of the shares, and Lin Haoliang and Lin Ruowen will relinquish all voting rights for their remaining shares [2] - After the second share transfer, Yuancheng Chengwu will own 28% of the company, maintaining majority representation on the board [2] - *ST Jinbi, founded in 1996, is one of the early companies in China engaged in the research, design, production, sales, and service of maternal and infant products, operating well-known brands such as "LABI BABY" and "I LOVE BABY" [2] Group 3 - For the fiscal year 2024, the company reported a total profit of 70.77 million yuan and a net profit of 49.69 million yuan, but a net profit of -45.32 million yuan after deducting non-recurring gains and losses, triggering delisting risk warnings [3] - In Q1 of the current year, the company achieved revenue of 76.06 million yuan, a year-on-year increase of 74.85%, but reported a net loss of 2.53 million yuan after deductions, indicating a shift from profit to loss [3] - The new controlling shareholder, Yuancheng Chengwu, currently has no plans to inject assets into the company, which may lead to stock price volatility detached from fundamentals [3][4]
*ST金比(002762.SZ):控股股东将变更为元一成物、实控人将变更为陈珂如 6月12日起复牌


Ge Long Hui A P P· 2025-06-11 13:05
格隆汇6月11日丨*ST金比(002762.SZ)公布,2025年6月11日,公司控股股东、实际控制人林浩亮先生 (简称"甲方一")、林若文女士(简称"甲方二")与元一成物(即"乙方")签署了《股份转让协议》。林浩亮先 生拟向元一成物转让其持有的公司无限售条件流通股24,134,838股,占公司总股本的6.82%;林若文女 士拟向元一成物转让其持有的公司无限售条件流通股22,950,487股,占公司总股本的6.48%。林浩亮先 生和林若文女士本次合计转让股份47,085,325股,占公司总股本的13.30%(以下称"第一次股份转让标的 股份")。本次股份转让价格为7.34元/股,转让价款合计为人民币3.456亿元。 同日,林浩亮先生和林若文女士与元一成物签署了《表决权放弃协议》。根据《表决权放弃协议》的约 定,甲方一同意无条件且不可撤销地放弃其所持除第一次股份转让标的股份以外剩余的72,494,061股股 份(占上市公司股份总数的20.48%)所对应的表决权;甲方二同意无条件且不可撤销地放弃其所持除第一 次股份转让标的股份以外剩余的68,936,611股股份(占上市公司股份总数的19.47%)所对应的表决权。 ...
蒙古能源(00276)预期年度毛利减少至约8.48亿港元 MoEnCo 的银行帐户约1.09亿美元被蒙古税务局冻结
智通财经网· 2025-05-22 10:37
公司的蒙古法律顾问提出,尽管 MoEnCo 的银行帐户被冻结,MoEnCo 仍可以在税务争议解决委员会 和在蒙古法律程序下为其案件进行辩护。同时,集团将尽一切合理努力与蒙古相关部门协商,寻求友善 解决方案。若无法迅速达成解决方案,且于税务争议解决委员会的复审聆讯取得负面结果,则可能对集 团的营运和财务方面(包括持续经营)产生不利影响。 智通财经APP讯,蒙古能源(00276)公布,该集团截至2025年3月31日止年度的未经审核的收入和未经审 核的毛利预期由2024年同期的31.732亿港元及11.869亿港元分别减少至约28亿港元及约8.48亿港元。财 政年度的收入和毛利减少乃主要由于平均煤炭销售价格下跌。 此外,有关蒙古税务局向 MoEnCo LLC徵收尚未清缴税款总额合共约13.331港元,公司于2025年5月19 日收到通知,蒙古税务争议解决委员会的复审聆讯将于2025年5月23日进行。 此外, MoEnCo 的银行帐 户亦因部分尚未清缴的税项约1.09亿美元 (约 8.52亿港元) 而被蒙古税务局冻结。如复审聆讯的结果不利 于该集团,并且上述拖欠金额仍然继续, 蒙古税务局有权采取进一步行动包括扣押 M ...
今年前四月内蒙古能源经济稳中向好 能源工业增加值增长5.0%
Xin Hua Cai Jing· 2025-05-22 04:54
三是能源产品产量保持平稳。1-4月,内蒙古规上工业原煤产量4.28亿吨,同比增长0.6%;发电量2797 亿千瓦时,同比增长5.1%,其中新能源发电量1005亿千瓦时,增长43%,占全区发电量的35.9%,同比 提高9.6个百分点;外送电量1105亿千瓦时,同比增长7.9%,其中外送新能源电量350亿千瓦时,增长 63%;原油产量109.4万吨,同比增长2.2%;天然气产量114.7亿立方米,同比基本持平。 四是能源重点工作取得实效。内蒙古大力推进新能源"沙戈荒"外送基地建设,两个基地配套煤电项目获 得核准。新增自用煤电规模已分解至5个盟市,其中3个自用煤电项目已完成选址,预计年底前取得核 准。1-4月,内蒙古新增新能源装机325万千瓦,累计装机达到1.38亿千瓦,占电力总装机的51.2%,同 比提高6.4个百分点;新型储能新增装机53万千瓦,累计建成装机达到1085.7万千瓦;绿氢产量2413吨, 已达到2024年全年产量的87%。(侯倩) (文章来源:新华财经) 据内蒙古自治区能源局消息,今年1-4月,内蒙古能源重大项目延续一季度较快增长态势,能源产品稳 产稳供,全区能源经济稳中向好。 一是能源贡献作用持 ...
机构风向标 | *ST金比(002762)2024年四季度已披露持仓机构仅9家
Xin Lang Cai Jing· 2025-04-24 01:19
2025年4月23日,*ST金比(002762.SZ)发布2024年年度报告。截至2025年4月23日,共有9个机构投资者 披露持有*ST金比A股股份,合计持股量达410.97万股,占*ST金比总股本的1.16%。其中,机构投资者 包括J.P.Morgan Securities PLC-自有资金、高盛国际-自有资金、MORGAN STANLEY & CO. INTERNATIONAL PLC.、中信建投远见回报A、易方达中证万得并购重组指数(LOF)、中证2000、南方 中证2000ETF、西部利得量化优选一年持有期混合A、国泰中证2000ETF,机构投资者合计持股比例达 1.16%。相较于上一季度,机构持股比例合计下跌了0.65个百分点。 公募基金方面,本期较上一季度新披露的公募基金共计6个,主要包括中信建投远见回报A、易方达中 证万得并购重组指数(LOF)、中证2000、南方中证2000ETF、西部利得量化优选一年持有期混合A等。 外资态度来看,本期较上一期持股增加的外资基金共计1个,即高盛国际-自有资金,持股增加占比小幅 上涨。本期较上一季度新披露的外资机构有 2 家 ,包括J.P.Morgan Sec ...