Workflow
公路建设
icon
Search documents
加快农业农村现代化 ,《农村公路条例》公布
Xuan Gu Bao· 2025-07-22 16:13
Group 1 - The State Council has announced the implementation of the "Rural Road Regulations" starting from September 15, 2025, focusing on improving the quality of rural road networks and integrating them with national and provincial roads [1] - The regulations require new rural roads to meet technical standards and existing roads that do not meet minimum standards to be upgraded [1] - The investment in rural road construction is projected to exceed 1.5 trillion yuan from 2025 to 2030, with 2024's investment reaching 455 billion yuan, maintaining a high level for eight consecutive years [1] Group 2 - The Ministry of Finance has issued guidelines to enhance the quality of rural roads, increasing fiscal subsidies and creating a multi-source investment model involving central finance, local matching funds, and social capital [2] - Rural roads are identified as a core link for urban-rural integration, supporting agricultural modernization, rural tourism, and cold chain logistics, indicating a continuous release of market potential [2] Group 3 - A-share related concept stocks include Dagang Holdings and Guochuang High-tech, which may benefit from the developments in rural road construction [3]
东营南外环项目加速推进,东段争取年底通车
Qi Lu Wan Bao Wang· 2025-07-17 13:22
东营市公路事业发展中心工程科副科长韩冬表示,下一步,东营市公路事业发展中心将加强调度,科学组织,集中解决关键节点、难 点,确保完成年度目标任务,2025年底前实现西四路以东段交工通车,2026年实现西四路以西段与津潍高铁黄河公铁大桥同步交工通 车。 南外环建成后,不仅可以为东营市增添一条东西向的交通大通道,进一步完善区域路网布局,还为城市扩容提供了空间,为周边经济社 会发展带来了更多可能,也将促进沿线经济协同联通,带动城市"生长"。(大众新闻记者张园园杜美萱) "目前S227(西四路)以东段,已完成路基53%,桥涵41%,路面5%。S227(西四路)以西段,完成清表67%,路基13%,桥涵14%。累计完成 投资23.5亿元,占总投资的36.8%。"G220东深线东营段(南外环)改建工程项目技术负责人范基星介绍。 作为东营市又一条贯通东西的交通动脉,G220东深线东营段(南外环)改建工程,一直备受关注。南外环改建工程项目起于G220与东八路 明海闸交叉点,止于G220利津与滨州界,全长67.3公里,分东西两段,按照双向六车道一级公路标准建设。 G220东深线东营段(南外环)改建工程东段于2024年4月29日开工 ...
中企承建的马拉维扎恩马公路正式开工
人民网-国际频道 原创稿· 2025-07-16 07:33
人民网约翰内斯堡7月15日电 (记者杨讴)利隆圭消息:当地时间7月15日,在马拉维中部地区的恩奇斯市郊区,10余台自卸车、挖掘机等机械设备繁 忙作业、机械轰鸣,由中铁二十局承建的马拉维扎(莱卡)—恩(奇斯)—马(洛莫)公路正式开工建设。 马拉维扎恩马公路为马拉维M7公路的关键一段,连接马拉维首都利隆圭与北部地区,全长 60公里,其起点与M16公路无缝衔接,终点直通M18公路, 是马拉维交通网络的重要通道。 村民代表约瑟芬·奇彭达展示着手机里的旧路照片,激动地说。 7月15日,中铁二十局承建的马拉维扎(莱卡)—恩(奇斯)—马(洛莫)公路正式开工,图为建设现场。高珊摄 公路所处地区地形复杂,施工难度较大。自中标以来,项目团队迅速响应,调配专业人员与先进设备,统筹规划前期工作与临建设施搭建,并积极与业 主、监理及外控单位沟通协调,深入研究施工流程,精心制定施工方案,确保了项目顺利启动。 "去年雨季,因为这条路太烂,我们的校车陷在泥坑里整整三天无法前行,现在公路开始重建,我们看到了希望。" 公路重建后,将由原来的土路变为双向两车道的沥青路面,不仅能将利隆圭至北部的通行时间缩短 30%,更将激活沿线农产品运输、旅游开发 ...
武契奇出席中企承建高速路通车仪式,并高度评价中国建设者的卓越贡献
Huan Qiu Shi Bao· 2025-07-06 22:50
Core Points - The E-763 highway segment from Pakovlija to Pozega, measuring 19.56 kilometers, was officially opened on June 6, with free access until June 15 [1][3] - This segment is part of the larger Preljina-Pozega project, which spans 30.96 kilometers and includes the previously opened Preljina to Pakovlija section [1] Infrastructure Development - Serbian President Aleksandar Vucic highlighted that the project signifies Serbia's transformation into a country with a modern and safe highway system [3] - The project faced complex terrain but was completed successfully, with plans for further negotiations on additional important highway segments [3] International Collaboration - Vucic praised the contributions of Chinese builders, emphasizing the collaboration between Serbia and China in overcoming challenges [3] - The project is seen as a testament to the strong friendship between the two countries, according to Chinese Ambassador to Serbia Li Ming [3] Economic Impact - The new highway segment significantly improves transportation, promotes economic development, and enhances the quality of life for citizens [3] - The completion of the Preljina-Pozega segment lays a solid foundation for the construction of the Belgrade-South Adriatic Sea E-763 highway, addressing transportation bottlenecks in Central and Eastern Europe [3] Financial Aspects - The contract amount for the Preljina-Pozega segment is €450 million, with China Road and Bridge Corporation as the contractor [3]
中企承建塞尔维亚高速关键路段通车
news flash· 2025-07-06 07:00
Core Viewpoint - The completion of the E763 highway segment in Serbia marks the first infrastructure project under the China-Central and Eastern European Countries cooperation framework, highlighting China's growing influence in European infrastructure development [1] Group 1 - The E763 highway segment from Preljina to Pozega was inaugurated in the southwestern Serbian city of Lucani [1] - This project is significant as it is the first highway constructed by a Chinese company in Europe [1] - Serbian President Vucic praised the exceptional contributions of Chinese builders during the inauguration ceremony [1]
武契奇最新涉华表态
中国基金报· 2025-07-06 05:29
来源:新华社 由中国企业承建的塞尔维亚E763高速公路普雷利纳-波热加段通车仪式5日在塞西南部城市卢 查尼举行。 塞总统武契奇、建设、交通和基础设施部长阿莱克桑德拉·索夫罗尼耶维奇、中国驻塞尔维亚 大使李明等出席通车仪式并致辞。 当地时间7月5日,武契奇出席 塞尔维亚E763高速公路普雷利纳-波热加段通车仪式。(中国驻塞尔维亚 大使馆) 李明在致辞中表示,E763高速公路作为连接贝尔格莱德与黑山巴尔港的重要交通大动脉,意义重大。 普雷利纳-波热加段通车将大大改善本地区交通条件,带动沿线地区经济发展,提升人民生活品质。项 目成功通车凝聚了各方智慧与汗水,是对两国"铁杆友谊"的最好诠释。 E763高速公路普雷利纳-波热加段位于塞尔维亚南部地形险峻山区,全长30.2公里,最高设计时速120公 里,采用双向四车道标准建设。该路段是E763高速公路中施工难度最大的一段。 最新!马斯克回应:明年"参选" 武契奇在致辞中表示,E763高速公路普雷利纳-波热加段是塞尔维亚最重要的基础设施项目之一,项目 通车象征着塞尔维亚正转型成为一个拥有现代化、安全高速公路体系的国家。 "我们与中国朋友携手, 借助他们的技术和我们的决心,克 ...
四川路桥: 四川路桥关于参股投资高速公路项目的关联交易进展暨重大项目签约的公告
Zheng Quan Zhi Xing· 2025-07-02 16:25
Core Viewpoint - Sichuan Road and Bridge Construction Group Co., Ltd. has announced its participation in several highway expansion projects, with a total estimated investment of approximately 67.344 billion yuan, and has signed a major construction contract for one of these projects [1] Group 1: Project Participation - The company has decided to abandon controlling stakes and instead participate in the investment of the G85G76 Chongqing (Chuan-Yu Border) to Chengdu Highway Expansion Project, Suining to Chongqing Highway (Sichuan Section) Expansion Project, and Dazhu to Dianjiang (Sichuan Section) Highway Project [1] - The total estimated investment for these projects is around 67.344 billion yuan, with a self-raised capital ratio of no less than 20%, which amounts to approximately 13.4688 billion yuan [1] Group 2: Contract Signing - The company's wholly-owned subsidiary, Road and Bridge Group, has signed a total construction contract for the G85G76 Chongqing (Chuan-Yu Border) to Chengdu Highway Expansion Project, covering a total length of approximately 81.398 kilometers [1] - The total contract amount for this segment is approximately 11.596 billion yuan, with a total construction period of 39 months [1]
上合国家人士盛赞交通合作互利共赢
Xin Hua She· 2025-07-02 11:26
Core Viewpoint - The article highlights the growing collaboration among Shanghai Cooperation Organization (SCO) member states in promoting sustainable transportation, with a focus on integrating green technologies and enhancing connectivity in the region [1][4]. Group 1: Sustainable Transportation Initiatives - Azerbaijan is transitioning from traditional gas buses to new energy vehicles with the support of Chinese companies, aiming to build a more environmentally friendly and intelligent transportation system [3][7]. - The transportation sector accounts for 24% of global greenhouse gas emissions, making it a significant area for implementing sustainable practices [3]. - The SCO framework presents promising opportunities for green and sustainable transportation cooperation among member states [3][4]. Group 2: Infrastructure Development and Economic Impact - The "North-South Transport Corridor" project in Armenia is being developed to enhance connectivity, with Chinese companies set to undertake key construction segments [6]. - The China-Pakistan Economic Corridor is expected to boost regional economic development, enhance cultural exchanges, and create job opportunities [6][7]. - Azerbaijan's strategic location in international transport corridors facilitates cross-border trade and enhances the efficiency of the China-Europe freight transport system [7].
四川路桥:子公司路桥集团签订115.96亿元合同
news flash· 2025-07-02 10:33
Group 1 - The core point of the article is that Sichuan Road and Bridge has signed a significant contract worth approximately 11.596 billion yuan for a highway expansion project [1] - The contract was signed between the company's wholly-owned subsidiary, Road and Bridge Group, and Sichuan Chengnei Yuzhou Highway Co., Ltd. [1] - The project includes various engineering works such as subgrade, bridges, culverts, tunnels, slope greening, pavement (reconstruction and expansion), and traffic safety (reconstruction and expansion) [1] Group 2 - The total contract amount is approximately 11.596 billion yuan [1] - The total duration for the contract segment is set at 39 months [1]
交通运输部:实施好新一轮农村公路提升行动,精准推进更新改造
Di Yi Cai Jing· 2025-06-30 03:01
Core Insights - Rural roads are the foundation of the road network in China, covering the widest area and serving the largest population, with a continuous investment of over 400 billion yuan for eight consecutive years [1][7] - The Ministry of Transport plans to implement a new round of rural road enhancement actions, focusing on quality and efficiency, and will promote the upgrading and renovation of rural roads [8] - The State Council has approved the draft of the "Rural Road Regulations," emphasizing the importance of high-quality rural road development for comprehensive rural revitalization [1][3] Investment and Development - In 2024, the total mileage of rural roads in China is expected to reach 4.644 million kilometers, accounting for 84.6% of the total road mileage, with 87.6% of rural roads classified as fourth-level and below [1] - In 2023, the investment in rural road construction reached 131.16 billion yuan, with 164,100 kilometers of new and renovated rural roads completed [2] - The establishment of village-level logistics service stations has increased to 426,700, marking an increase of 61,600 stations [2] Policy and Regulation - The Ministry of Transport has introduced over 20 policy documents to promote the high-quality development of rural roads, including guidelines and management methods [4] - The new "Rural Road Regulations" aim to solidify the successful experiences of the "Four Good Rural Roads" initiative and provide systematic regulations for construction, management, maintenance, and operation [4][5] - The development of rural roads is seen as crucial for achieving the goals of modernizing the socialist country and improving public services in rural areas [5][6] Challenges and Future Directions - Despite significant progress, rural road development still faces challenges, necessitating specialized regulations to promote high-quality development [3] - The Ministry of Transport aims to enhance the rural transportation system by focusing on quality, safety, and public service [8] - Successful experiences in rural road construction have been reported in various regions, such as Sichuan, which has implemented high-quality development initiatives [6]