Zhong Guo Neng Yuan Wang
Search documents
有棵树:财务资料交接不及时 公司无法在法定期限内披露2025年三季报
Zhong Guo Neng Yuan Wang· 2025-10-30 17:57
Core Points - The company announced that it is unable to disclose its Q3 2025 report by the legal deadline due to ongoing issues with the transition of assets, business, finance, personnel, and locations, as well as the lack of cooperation from some board members and management [1] - The former chairman provided the Q3 2025 financial statements, but the company cannot ensure their authenticity, accuracy, or completeness [1] Group 1 - The seventh board of directors has been appointed, with Liu Hailong as chairman and Zhang Wen as general manager, while the core management team, including founder Xiao Siqing, has completely resigned [2] - The company has sent transfer letters to former controlling shareholders, directors, and executives, indicating that legal action will be initiated if they refuse to hand over responsibilities within five days [2] - The company has highlighted risks of asset loss, business interruption, financial chaos, and core data leakage during the control transition period, emphasizing the need for strengthened unified management [2] Group 2 - From 2020 to 2024, the company reported non-recurring net losses of 910 million, 2.682 billion, 364 million, 451 million, and 113 million, totaling cumulative losses of 4.519 billion [2] - In the first half of 2025, the company's revenue was 42.5734 million, a decrease of 185.5068 million year-on-year, representing a decline of 81.33% [2]
多晶硅“高库存”与组件“弱需求”并存,光伏产业链四季度震荡盘整
Zhong Guo Neng Yuan Wang· 2025-10-30 16:24
在中游环节,硅片和电池片企业近期通过调价试图修复盈利。东吴证券的研报显示,9月以来,硅片头 部企业率先报涨,大部分企业已完成价格调整。随着价格回升,部分尺寸硅片毛利已由负转正,其他尺 寸虽未盈利但售价已可覆盖现金成本。同期,硅片产量环比增长5.37%,企业开工率维持在52%—80% 之间,反映出供应端仍具弹性。 然而,价格上涨并未完全传导至下游。电池片环节尽管排产规模稳中有升,9月全球电池片排产达约61 吉瓦,环比增长4.86%。但受组件端压力传导,部分企业计划在10月适度下调排产。东吴证券指出,电 池片作为"夹心层",议价能力较弱,尽管短期价格波动有限,但在上下游挤压下仍难以实现盈利扭转。 截至9月28日,电池片单瓦亏损为0.01元。 硅业分会调研指出,当前硅片市场仍处于博弈阶段,价格保持相对稳定。尽管部分企业为回笼资金小幅 降价出货,但多数企业在成本支撑下挺价意愿强烈。展望四季度,随着上游多晶硅企业检修减产计划逐 步落地,硅片供需关系有望边际改善,但受制于终端组件需求疲软,价格上行空间有限,预计将维持弱 势盘整态势。 今年以来,我国光伏产业在产能扩张与终端需求放缓的双重压力下,持续处于深度调整期。尽管近期 ...
新时代如何重塑风电价值?全产业链“反内卷”锚定50亿千瓦大目标
Zhong Guo Neng Yuan Wang· 2025-10-30 16:23
Core Viewpoint - The wind power industry is transitioning from "scale victory" to "value symbiosis," emphasizing the need for wind turbines to evolve from mere power generation devices to providers of system solutions [1][2]. Industry Goals - The "Beijing Wind Energy Declaration 2.0" outlines clear targets for China's wind power industry: 1.3 billion kilowatts of installed capacity by 2030, at least 2 billion kilowatts by 2035, and over 5 billion kilowatts by 2060 [1]. - As of August 2025, China's wind power grid capacity reached 580 million kilowatts, doubling since 2020, with wind power accounting for approximately 11% of total electricity consumption [1]. Market Dynamics - The industry is expected to see annual new installations exceeding 100 million kilowatts, driven by China's abundant wind resources, particularly in the "Three North" regions [2]. - The National Energy Administration has set ambitious goals for wind and solar power, aiming for a total installed capacity of 3.6 billion kilowatts by 2035, indicating significant growth potential for the wind power sector [2]. Innovation and Competition - The wind power sector has enhanced its innovation capabilities and competitiveness, with advancements in large-capacity units and long blades leading to reduced investment and construction costs [2]. - The industry faces challenges related to balancing scale and efficiency, with calls for demonstration projects and expanded provincial electricity markets to mitigate risks associated with local competition [3]. Industry Collaboration - The "Declaration 2.0" advocates for a return to value creation and quality assurance, addressing issues of low-price competition that have led to project quality decline and profit compression [4][5]. - Industry leaders emphasize the need for collaboration across the supply chain to ensure stability and enhance global competitiveness, moving from individual efforts to collective development [5][6]. Global Positioning - The Beijing International Wind Energy Conference showcased over 200 international companies, highlighting global confidence in China's wind power industry [6]. - Chinese companies are encouraged to participate in international standard-setting and to shift from product exports to integrated outputs of technology, standards, and services [6]. - The transition from being the "global scale leader" to a "global leader" in wind power reflects China's commitment to high-quality development and its role in achieving global carbon neutrality goals [6].
广晟有色:第三季度营收19.57亿元,同比下降45.76%
Zhong Guo Neng Yuan Wang· 2025-10-30 16:04
Core Insights - The company reported a significant decline in revenue for the first three quarters of 2025, with total revenue at 4.634 billion yuan, a year-on-year decrease of 46.97% [1] - Despite the drop in revenue, the net profit attributable to shareholders increased to 128 million yuan, reflecting a year-on-year growth of 146.30% [1] - The company's basic earnings per share stood at 0.38 yuan [1] Financial Performance - For the third quarter, the company generated revenue of 1.957 billion yuan, which is a 45.76% decrease compared to the same period last year [1] - The net profit for the third quarter was 55.0619 million yuan, showing an impressive year-on-year increase of 111.25% [1] - The non-recurring net profit attributable to shareholders for the first three quarters was 158 million yuan, marking a year-on-year growth of 155.41% [1]
董事长刘鹏被批准逮捕,*ST创兴称“所涉事项与公司无关”
Zhong Guo Neng Yuan Wang· 2025-10-30 13:59
Core Viewpoint - The chairman of Shanghai Chuangxing Resource Development Co., Ltd. (stock code: *ST Chuangxing, 600193.SH), Liu Peng, has been arrested on criminal charges, but the company asserts that this matter is unrelated to its operations [1][3]. Group 1: Company Management and Governance - Liu Peng has been approved for arrest by the Hangzhou Public Security Bureau, and the company has appointed Yang Zhe, a board member and general manager, to act as chairman during this period [1]. - The company emphasizes that its production and operations remain normal, and the board is functioning as usual [1]. - Yang Zhe, who is taking over the chairman's responsibilities, faced opposition from a board member last year due to concerns about his lack of experience in listed company management [2]. Group 2: Financial Performance - For the first three quarters of 2025, the company reported total revenue of 18.73 million yuan, a year-on-year decline of 59.10%, and a net loss attributable to shareholders of 14.49 million yuan [3]. - The net loss, excluding non-recurring gains and losses, has further widened to 28.04 million yuan, primarily due to a decrease in project volume compared to the previous year [3]. - The company’s stock has been placed under delisting risk warning due to its audited financial data for 2024 [3]. Group 3: Historical Context - The company was listed on May 27, 1999, and its main business includes construction engineering, mobile information services, and computing power services [3]. - The previous actual controller of the company, Yu Zengyun, was investigated for suspected fundraising fraud, leading to changes in the company's shareholding structure [3]. Group 4: Market Performance - As of the close on October 30, the stock price of *ST Chuangxing was 4.15 yuan per share, with a slight increase of 0.48%, and the total market capitalization was approximately 1.765 billion yuan [4].
一盏“复工灯” 半程“暖心事”
Zhong Guo Neng Yuan Wang· 2025-10-30 12:37
"城关供电所吗?交了电费都半小时了,咋还没电?是不是故意停电!"10月27日7点21分,霍州市滴滴司机陈师傅攥 着手机,声音带着急慌与恼火,拨通国网临汾供电公司霍州城关供电所的电话。刚跑完整夜城关活计的他,本想着早上 给车充上电,下午继续营生,谁料充电桩没了电,又误判是欠费停电,满心焦虑全化作质问。 "您别慌,咱先查查,肯定给您解决!"该公司工作人员秦帅帅立即进入电力营销系统查询电表数据,"哟,不是欠 费!" 他心里有数,却没急着挂断,一边细细安抚,一边联系台区客户经理靳皓钦:"大张综合四台区用户,内部线路可 能有问题,滴滴师傅等着下午出车,得赶紧!" 靳皓钦手头正梳理着工单,一听 "滴滴师傅""下午出车",二话不说放下手机:"收到!这就去!" 两人抄起工具包, 15分钟不到,就跨进陈师傅家门。"您看,电表这灯亮着呢,不是欠费!" 靳皓钦半蹲在电表箱前,仔细检查,而后直奔 充电桩,一查空气开关,"咔嗒" 轻响,跳闸了!再瞧那开关下端子,隐隐烧黑痕迹,他抬眼望着陈师傅熬得发红的 眼:"师傅,您跑车辛苦,这开关咱给换个新的,不收钱!" 说着就掏工具,螺丝刀 "咔咔" 转动,旧开关拆下,新的稳稳 装上。陈师傅在旁看 ...
国网漳浦县供电公司:精准排查计量装置 保障群众用电可靠
Zhong Guo Neng Yuan Wang· 2025-10-30 12:30
目前,国网漳浦县供电公司每日需研判近百户存在采集失败、零散运行误差、反向电量 及停走等问题的计量表计。截至近期,本年度低压表计轮换进度已达6744户中的77.09%, 高压表计轮换进度达1713户中的90.95%。 下一步,国网漳浦县供电公司将继续推进计量装置隐患排查与表计轮换工作,不断提升 采集成功率与供电质量,以扎实行动守护群众用电权益,践行"人民电业为人民"的服务宗 旨。 为快速、高效解决计量装置异常问题,该公司营销部制定了严密的排查计划,重点压降 连续失败2天及以下的表计数量。排查过程中,采取"运维队伍+网格员"协同作业模式,由网 格员带路引导,运维队伍现场处理,提高排查效率。工作人员通过恢复送电、更换模块、表 计和加装集中器等手段及时消缺,确保采集功能恢复正常。 同时,供电所后台人员利用采集2.0系统,每日召测表计低压全量停电情况,一旦发现 问题,当日即安排抢修,做到"问题不过夜"。此外,公司还积极推进运行超过5年的老旧表 计轮换工作,分批次进行更换,进一步压降存量隐患,提升线损采集可靠性。 10月29日,国网漳浦县供电公司积极践行"百日攻坚"行动,组织专业人员开展计量装置 排查工作。在排查过程中, ...
中国项目获颁全球首张非生物来源可再生燃料氨证书
Zhong Guo Neng Yuan Wang· 2025-10-30 12:28
Core Insights - Green ammonia is a key pathway for decarbonization in high-energy-consuming industries, produced entirely from renewable energy sources like wind and solar [1][2] - The Daan project has received the "ISCC EU RFNBO" certification, indicating compliance with stringent EU renewable energy directives, allowing it to access global markets [1] - The Daan project is the largest single green ammonia project globally, with a capacity of 180,000 tons per year, utilizing self-built wind and solar power [2] Group 1 - The Daan project is part of China's clean low-carbon hydrogen demonstration initiative and has achieved four global records, including the largest single green ammonia production and the largest solid-state hydrogen storage [2] - The project employs innovative "electric-hydrogen-ammonia" flexible control technology to address the challenges of renewable energy volatility and chemical production stability [1][2] - The project has signed intent procurement agreements with multiple energy companies in Europe and Japan, indicating strong market interest [2] Group 2 - The certification process for the Daan project covers the entire lifecycle assessment of raw materials, production, and application, establishing a traceable and verifiable system for the hydrogen industry [1] - The project has a total installed capacity of 800 megawatts, consisting of 700 megawatts from wind and 100 megawatts from solar energy [2] - The Daan project aims to provide a feasible solution for large-scale renewable energy consumption, contributing to the commercialization and standardization of the global hydrogen industry [1]
中国电力技术装备有限公司与马来西亚国家能源公司签署合作项目谅解备忘录
Zhong Guo Neng Yuan Wang· 2025-10-30 09:04
根据该合作谅解备忘录,双方本着"优势互补、需求对接"的原则,充分发挥各自优势,围绕电力系统规划与集成、智能韧性电网、数 字化与AI解决方案等领域开展技术交流及项目合作,促进中国先进输变电、电网数字智能领域技术经验与马来西亚能源发展需求深度融 合,助力马来西亚国家能源转型路线图的实施。 吉隆坡当地时间10月26日,中国电力技术装备有限公司与马来西亚国家能源公司(TNB)签署"马来西亚半岛电网智能化合作项目谅解 备忘录",旨在通过加强双方合作协助TNB应对能源电力转型领域的迫切需求。TNB总裁兼首席执行官梅加特・哈桑、中电装备公司董事长 余军分别代表双方在谅解备忘录文本上签字。马来西亚副总理兼能源及水务转型部部长法迪拉・尤索夫、TNB首席电网官哈斯马利扎尔・ 哈桑、中电装备公司副总经理张蕾见证签约。 后续,中电装备公司将紧密对接马来西亚能源转型发展需求和谅解备忘录合作事项,加强各类资源调配,开展技术研究和协议内容实 施,务实推进中马电力深度合作。 【责任编辑:王少晨 】 ...
张北——胜利1000千伏特高压安全运行一周年
Zhong Guo Neng Yuan Wang· 2025-10-30 09:04
截至2025年10月30日,张北—胜利1000千伏特高压交流工程已安全稳定运行一周年,累计输送电量已超7亿千瓦时,相当于27万户家庭 全年用电量,就地转化标准煤超23万吨,减排二氧化碳约69万吨,环保与社会效益显著。 作为国家"十四五"电力发展规划的重点项目,张北—胜利特高压工程总投资67.86亿元,线路全长732公里,起于河北张家口,止于内蒙 古锡林浩特,由国网内蒙古东部电力有限公司负责运维。该工程首次以特高压技术联通冀北清洁能源基地与锡林郭勒盟大型风电基地,大 幅提升了特高压通道中新能源电量的比例,有效增强了受端电网消纳绿色电力的能力。 张北-胜利100千伏特高压交流工程(内蒙古段)。徐佳琪/摄 一年来,运维单位成功应对严寒、强风等多重挑战,首次采用"无人机+小飞人"带电作业方式检修线路,推广应用"无人机+可视化+人 工"的立体巡检模式,运用数字化系统、智能巡视机器人对站内设备进行无死角监控,定期开展人工巡视,确保设备安全稳定运行。针对近 期寒潮天气,编制张北-胜利1000千伏特高压交流工程"一线一案"专项运维保障方案,推行"同进同出"蹲守看护模式,确保责任到人、措施 到位,全力守护人员和设备安全。 下一 ...