中关村储能产业技术联盟
Search documents
中车株洲所/海辰储能/科华数能入围大唐300MW风电项目储能系统采购
中关村储能产业技术联盟· 2025-10-29 08:05
Group 1 - The article highlights the procurement results for the energy storage system of the 300 MW wind power project in Su Ni Te Left Banner, with the first candidate being CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd. with a bid of 502,830,000 CNY [2] - The second candidate is Xiamen Haichen Energy Storage Technology Co., Ltd. with a bid of 535,500,000 CNY, and the third candidate is Xiamen Kehua Data Co., Ltd. with a bid of 549,000,000 CNY [2] - Bidders must have a cumulative performance of no less than 1 GWh in lithium iron phosphate battery energy storage system integration over the past three years, including at least two projects with a capacity of 100 MWh or more [2] Group 2 - The article references the "14th Five-Year Plan" which emphasizes the development of new energy storage and the acceleration of smart grid and microgrid construction [6] - It mentions the third-quarter financial report of Sungrow Power Supply Co., Ltd., showing a revenue of 22.869 billion CNY and a net profit increase of 59.76% year-on-year [6]
233MW/1003MWh构网型储能!天合储能斩获智利大单
中关村储能产业技术联盟· 2025-10-28 21:00
Core Insights - Trina Storage has secured a significant overseas GWh-level energy storage contract, collaborating with Atlas Renewable Energy to develop a 233MW/1003MWh grid-forming energy storage project in Chile [2][5] - The project aims to provide clean energy for Chile's mining sector and enhance the resilience of the national grid [2] Group 1: Project Details - The 233MW/1003MWh storage project utilizes advanced grid-forming control strategies, enabling the storage system to establish voltage and frequency autonomously without external grid support [5] - This system enhances grid disturbance resistance, suppresses wide-frequency oscillations, and maintains stable operation of critical loads during grid failures or outages [5] Group 2: Industry Context - The acceleration of renewable energy integration in Latin America has led to challenges such as decreased system inertia and deteriorating voltage frequency stability, making traditional grid-following storage insufficient for weak grid or high-variability scenarios [4][5] - The collaboration with Atlas Renewable Energy follows their recent $475 million financing, which will be used to construct this large-scale photovoltaic and storage complex [2]
17家企业入围!中国电气装备储能电池集采成交人名单公布
中关村储能产业技术联盟· 2025-10-28 21:00
Core Insights - The article discusses the results of a centralized procurement project for energy storage batteries by China Electric Equipment Group, which includes a total of 17 companies across four bidding packages [2]. Group 1: Procurement Results - The procurement project is divided into four packages, each with nine companies selected as qualified bidders [2]. - The list of companies includes notable names such as Pinggao Group, Jiangsu Dechun Electric Technology, and Hefei Guoxuan High-Tech Power Energy [4]. Group 2: Industry Trends - The article highlights the growing importance of the energy storage industry, indicating a shift towards larger capacity storage solutions, such as the 700+Ah energy storage batteries with an annual production capacity of 40GWh being developed by Envision Energy [7]. - It also mentions the acceleration of new energy development initiatives, including hydrogen and nuclear fusion energy, as potential new economic growth points [7].
阳光电源三季度财报:营收228.69亿,净利润同比+59.76%!
中关村储能产业技术联盟· 2025-10-28 21:00
Core Insights - Sunshine Power's Q3 revenue reached 22.87 billion yuan, marking a year-on-year increase of 20.83% [2][3] - The net profit attributable to shareholders was 4.15 billion yuan, reflecting a significant growth of 57.04% year-on-year [2][3] - For the first three quarters of 2025, total revenue was 66.40 billion yuan, up 32.05% compared to the same period last year [2][3] Financial Performance - The net profit attributable to shareholders for the first three quarters was 11.88 billion yuan, with a year-on-year increase of 56.34% [2][3] - The net profit excluding non-recurring gains and losses was 11.49 billion yuan, showing a growth of 55.63% year-on-year [2][3] - Basic earnings per share for Q3 were 2.00 yuan, up 57.48% year-on-year, while for the first three quarters, it was 5.73 yuan, reflecting a 56.13% increase [2][3] Cash Flow and Assets - The net cash flow from operating activities for the first three quarters was approximately 9.91 billion yuan, with a year-on-year increase of 1,133.14% [3] - Total assets at the end of the reporting period were approximately 120.67 billion yuan, representing a 4.87% increase from the end of the previous year [3] - Shareholders' equity attributable to the company was about 44.97 billion yuan, which is a 21.84% increase compared to the previous year [3] Industry Engagement - Sunshine Power has confirmed its participation in the ESIE 2026 International Energy Storage Summit and Exhibition, sponsoring the B2 Energy Storage Application Hall [2]
“十五五”规划建议全文发布:大力发展新型储能,加快智能电网和微电网建设
中关村储能产业技术联盟· 2025-10-28 09:09
Core Viewpoint - The article outlines the key proposals and objectives of China's 15th Five-Year Plan, emphasizing the importance of modernizing the economy, enhancing energy systems, and achieving high-quality development while addressing environmental concerns and social equity [4][5]. Energy and Environment - Accelerate the construction of a new energy system, increasing the share of renewable energy and ensuring a reliable transition from fossil fuels [3]. - Implement a dual control system for carbon emissions, focusing on peak coal and oil consumption, and develop a comprehensive carbon trading market [3]. Economic Development Goals - The 15th Five-Year Plan aims for significant achievements in high-quality development, with economic growth maintained within a reasonable range and increased domestic consumption driving growth [10][13]. - The plan emphasizes the importance of technological self-reliance and innovation, aiming to enhance the national innovation system and improve the integration of technology and industry [19][20]. Industrial and Infrastructure Development - Focus on building a modern industrial system, optimizing traditional industries, and fostering emerging industries such as new energy and advanced manufacturing [16][18]. - Strengthen infrastructure planning and development, ensuring resilience and sustainability in transportation and energy systems [18]. Social and Cultural Development - Promote cultural innovation and the development of a strong socialist culture, enhancing the influence of Chinese civilization globally [40][41]. - Address social equity by improving living standards, ensuring high-quality employment, and optimizing income distribution mechanisms [44][45]. Regional Coordination and Rural Development - Enhance regional economic coordination, promoting balanced development across different areas of the country [36][37]. - Focus on rural revitalization, improving agricultural productivity, and ensuring modern living conditions in rural areas [33][34].
2GWh!华能清能院2025-2026年度储能电池框采招标
中关村储能产业技术联盟· 2025-10-28 08:26
Core Viewpoint - The article discusses the procurement announcement for energy storage materials (lithium iron phosphate batteries) by China Huaneng Group Clean Energy Technology Research Institute for the 2025-2026 annual energy storage project, with a total capacity of 2.0 GWh [2][5]. Group 1: Procurement Details - The procurement involves a total capacity of 2.0 GWh, with individual battery capacity not less than 314 Ah and energy not less than 1004.8 Wh, with a rated charge and discharge power of 0.5P [2][6][28]. - The procurement will follow a "unified bidding, separate signing, and separate payment" model, where the winning suppliers will sign an annual framework agreement with the procurer [8][28]. - The framework agreement is valid for one year from the date of signing or until the actual procurement volume reaches 2 GWh, with no guarantee of the actual procurement scale [8][28]. Group 2: Bidder Qualifications - Bidders must be legally registered independent legal entities in China, capable of independently assuming civil responsibilities and entering contracts [9][29]. - Bidders must have a supply performance of lithium-ion batteries with a capacity of 314 Ah or above, not less than 5 GWh since January 1, 2024, with each individual performance exceeding 200 MWh [11][30]. - Joint bids are not allowed, and agents are not accepted for this project [12][13]. Group 3: Bid Submission and Timeline - The deadline for bid submission is November 17, 2025, at 09:00 [18][33]. - Bids must be submitted through the China Huaneng Group's electronic commerce platform [18][33]. - The procurement announcement will be published on the China Tendering and Bidding Public Service Platform and the China Huaneng Group's electronic commerce platform [22][35].
【最后征集】我们寻找的不是参赛者,是储能界的下一个“破局者”
中关村储能产业技术联盟· 2025-10-28 08:26
Core Viewpoint - The 10th International Energy Storage Innovation Competition (ESIC 2026) serves as a premier platform for the energy storage industry, aiming to validate innovations, connect resources, and amplify visibility for projects and technologies in the sector [2][3][17]. Group 1: Competition Overview - ESIC 2026 is designed to create a comprehensive innovation chain for the energy storage industry, recognizing the value of technology, products, applications, patents, and research [3][17]. - The competition has received over 900 high-quality project applications globally, showcasing the vibrant growth of the energy storage sector [6][17]. Group 2: Target Audience and Benefits - The competition addresses various challenges faced by innovators, such as validating technology, gaining market recognition, and overcoming competition [4][5]. - Participants can benefit from authoritative recognition, capital connections, market exposure, and ecosystem collaboration [5][9]. Group 3: Expert Involvement - A distinguished panel of experts, including academicians and industry leaders, will ensure the evaluation of projects meets high technical and market standards [8][18]. Group 4: Historical Impact - Past competitions have shown that over 30% of awarded projects secured new rounds of financing, and over 40% opened new markets, highlighting the competition's credibility and value [10][19]. Group 5: Competition Structure and Timeline - The competition consists of several phases: project collection, material review, preliminary rounds, online voting, finals, and award ceremonies, with key dates from July 1, 2025, to April 1, 2026 [14][19]. - Various awards will be presented, including categories for technology innovation, application innovation, outstanding products, patents, and contributions to the industry [21][20]. Group 6: Participation Rights - Participants will receive extensive media coverage, free access to the conference, and financial advisory support from venture capital firms [33].
楚能新能源襄阳70GWh锂电池项目正式开工!
中关村储能产业技术联盟· 2025-10-28 08:26
Core Viewpoint - Chuangneng New Energy has commenced the construction of a 70GWh lithium battery project in Xiangyang, which integrates advanced manufacturing, technology research and development, and industrial collaboration, focusing on energy storage and power applications [2][4]. Group 1: Project Overview - The Xiangyang lithium battery project will have a maximum single factory effective capacity exceeding 30GWh and will produce next-generation lithium batteries, including large-scale energy storage batteries ranging from 588Ah to 1000Ah and the 4-6C Everest series super-fast charging power batteries [2][4]. - The project is expected to create over 5,000 jobs and will significantly contribute to optimizing Xiangyang's industrial structure and promoting high-quality regional economic development [4]. Group 2: Strategic Importance - The project is a crucial part of Chuangneng's strategic layout, leveraging Xiangyang's geographical advantages and industrial foundation to establish a modern lithium battery production base [4][6]. - Chuangneng aims to attract more upstream and downstream supporting enterprises to Xiangyang, enhancing the regional new energy industry chain and positioning Xiangyang as a national hub for new energy industries [6]. Group 3: Company Growth and Capacity - With the commencement of the Xiangyang project, Chuangneng will establish a strategic framework consisting of one global headquarters, two research and development centers, and four production bases, with total planned capacity exceeding 500GWh [6]. - The company currently operates three lithium battery production bases in Xiaogan, Wuhan, and Yichang, with an annual effective capacity exceeding 110GWh, which will be significantly enhanced by the new project [6].
长时储能技术创新与产业应用深度交流沙龙成功举办
中关村储能产业技术联盟· 2025-10-28 08:26
Core Viewpoint - Long-duration energy storage is crucial for addressing the intermittency of renewable energy and ensuring energy security, especially in the context of China's "dual carbon" goals and the construction of a new power system [2][12][29] Group 1: Event Overview - The event titled "Exploring Huairou Science City: In-depth Exchange on Long-duration Energy Storage Technology Innovation and Industrial Application" was successfully held, gathering nearly 80 guests from research institutions and representative enterprises [2] - The event was co-hosted by the Huairou District Science and Technology Committee, the Zhongguancun Energy Storage Industry Technology Alliance, and the Beijing Huairou Science City Construction Development Co., Ltd. [2] Group 2: Key Insights from Leaders - Chen Haisheng, Director of the Institute of Engineering Thermophysics at the Chinese Academy of Sciences, emphasized the need for breakthroughs in core material performance and system integration costs in long-duration energy storage technologies [12] - Lan Xiongjing, Deputy Director of the Huairou Science City Management Committee, highlighted the achievements of Huairou Science City, which has produced 386 major scientific and technological results and is accelerating the cultivation of emerging industries such as new energy and new materials [14] - Wang Tianyi, Deputy Director of the Huairou District Science and Technology Committee, provided insights into the region's support for technological innovation and industrial integration [15] Group 3: Technical Reports - Zhou Xuezhi, a senior engineer at the Institute of Engineering Thermophysics, discussed the urgent need for long-duration energy storage solutions as renewable energy usage increases, analyzing various technologies like pumped storage, compressed air, and flow batteries [19] - Tong Lige, Secretary-General of the CNESA Thermal Energy Storage Professional Committee, reported on the rapid growth of thermal energy storage in China, with new installed capacity and power exceeding 5 GW and 26 GWh respectively over the past decade, and a projected 375% year-on-year increase in new installed capacity for 2024 [21] - Zhang Hui, Vice President of the China Datang Group Science and Technology Research Institute, shared the company's achievements in long-duration energy storage projects, with a total installed capacity of 3.597 GW and 8.666 GWh by September 2025 [23] Group 4: Collaborative Discussions - The discussion session focused on key issues such as core technology bottlenecks, policy support for the industry, application scenario expansion, and models for industry-academia-research collaboration [25] - Participants engaged in lively discussions on topics including the construction of compressed air storage projects, the application of flow battery technology, and the economic viability of thermal energy storage [25] Group 5: Future Directions - The successful hosting of this salon not only established an efficient platform for connecting research and industry but also fostered a consensus on the core directions for innovation and industrial development in long-duration energy storage [29] - The organizers aim to leverage the strategic scientific strengths of Huairou Science City to promote further technological breakthroughs, result transformation, and industrial cooperation, supporting the high-quality development of the long-duration energy storage industry [29]
山东300MW/600MWh储能设备采购招标
中关村储能产业技术联盟· 2025-10-27 10:22
Core Viewpoint - The article discusses the public bidding announcement for a 300MW/600MWh electrochemical energy storage project in Guancounty, highlighting the procurement details and requirements for potential bidders [2][3]. Procurement Scope - The procurement includes the purchase of equipment for the AC system of the 300MW/600MWh energy storage project, covering PCS, EMS, cables, and other related devices [3]. Bidder Qualification Requirements - Bidders must be legally registered independent entities in China with the ability to assume civil liability [3]. - Bidders should not have been ordered to cease operations, under property management, or declared bankrupt in the last three years [3]. - Bidders must not be listed as serious violators by the industrial and commercial administration [3]. - Bidders should have no significant legal violations in contract performance as per the Chinese judiciary [3]. - Bidders must not be listed as untrustworthy by the national enforcement information public network [3]. - Bidders need to demonstrate good financial health with audited financial statements for the past three years [3]. - Bidders must not be blacklisted by China Energy Construction Corporation or the procurement company [3]. - Bidders should have supplied at least 500MWh of energy storage equipment in the last three years, including at least one project of 100MW or more [3]. - Bidders must possess independent R&D and production capabilities for AC side equipment, including relevant intellectual property certifications [3]. - Joint bids and subcontracting are not accepted for this procurement [3]. Procurement Document Acquisition - Procurement documents can be downloaded from the China Energy Construction electronic procurement platform from October 24, 2025, to October 30, 2025 [3]. Bid Submission - The deadline for bid submission is set for October 30, 2025, at 13:00 [3]. - Bids must be submitted online through the China Energy Construction electronic procurement platform [3]. Opening Time and Location - The bid opening will occur online on October 30, 2025, at 13:00 via the electronic procurement platform [3]. Other Announcement Content - The procurement announcement is published on the China Procurement and Bidding Public Service Platform and the electronic procurement platform [3].