TGOOD(300001)
Search documents
特锐德(300001) - 2025 Q2 - 季度业绩预告
2025-07-14 10:22
[Performance Forecast Overview](index=1&type=section&id=I.%20Current%20Period%20Performance%20Forecast) This section presents the company's projected financial performance for the first half of 2025, detailing anticipated profit growth [Core Financial Indicators Forecast](index=1&type=section&id=I.%20Current%20Period%20Performance%20Forecast) The company anticipates significant profit growth for the first half of 2025, with net profit attributable to shareholders projected to increase by 50%-80% and non-recurring net profit by 38%-75% 2025 Half-Year Performance Forecast | Item | Current Reporting Period | Prior Year Period | | :--- | :--- | :--- | | **Net Profit Attributable to Shareholders** | **Profit: 289.7 million - 347.64 million yuan** | Profit: 193.13 million yuan | | | Year-on-year Growth: **50%-80%** | | | **Net Profit After Non-Recurring Items** | **Profit: 221.7 million - 279.64 million yuan** | Profit: 160.23 million yuan | | | Year-on-year Growth: **38%-75%** | | [Explanation of Performance Changes](index=1&type=section&id=III.%20Explanation%20of%20Performance%20Changes) This section explains the primary drivers behind the company's anticipated performance growth, focusing on its core business segments and strategic initiatives - The company's performance growth is primarily driven by the sustained improvement in profitability across its two core business segments, "Intelligent Manufacturing + Integrated Services" and "Electric Vehicle Charging Network," further bolstered by global energy transition and globalization strategies[5](index=5&type=chunk) [Intelligent Manufacturing + Integrated Services Segment](index=1&type=section&id=III.%20Explanation%20of%20Performance%20Changes%20-%20Intelligent%20Manufacturing%20%2B%20Integrated%20Services) This segment achieves rapid development across multiple "source-grid-load-storage" scenarios by integrating digitalization and full lifecycle services into products like prefabricated substations and switchgear, while the company continuously innovates to strengthen core competitiveness - The business, centered on intelligent prefabricated power equipment combined with integrated services, achieves rapid and sustainable development across multiple "source-grid-load-storage" scenarios[5](index=5&type=chunk) - The company continuously drives product iteration and upgrades, digital factory construction, and the application of new materials and structures to build market-leading core competitiveness[6](index=6&type=chunk) [Electric Vehicle Charging Network Segment](index=2&type=section&id=III.%20Explanation%20of%20Performance%20Changes%20-%20Electric%20Vehicle%20Charging%20Network) The charging network business maintains high-quality growth by enhancing technology and operational capabilities and developing value-added services like SaaS and microgrids, operating over 790,000 public charging terminals by June 2025, with a 47% increase in H1 charging volume, solidifying its industry leadership - The company actively promotes the development of value-added services such as SaaS, microgrids, and virtual power plants, further demonstrating its platform advantages[6](index=6&type=chunk) Core Operational Data for Charging Network Business (As of June 30, 2025) | Indicator | Data | | :--- | :--- | | Public Charging Terminals in Operation | Over **790,000 units** | | Of which: DC Charging Terminals | Over **470,000 units** | | Cumulative New Energy Microgrid Stations Deployed | Approximately **1,000 stations** | | Cumulative Charging Volume | Exceeds **47.7 billion kWh** | | Highest Daily Charging Volume | Exceeds **58 million kWh** | | H1 2025 Charging Volume | Exceeds **8.5 billion kWh** (**47%** year-on-year growth) | [Communication with Accounting Firm](index=1&type=section&id=II.%20Communication%20with%20Accounting%20Firm) The performance forecast data represents preliminary estimates by the company's finance department and has not yet been audited by an accounting firm - This performance forecast has not been audited by an accounting firm[4](index=4&type=chunk) [Other Relevant Information](index=2&type=section&id=IV.%20Other%20Relevant%20Information) The company emphasizes that this forecast is a preliminary estimate, with final data subject to the 2025 half-year report, and discloses that non-recurring gains and losses impacted profit by approximately 68 million yuan during the reporting period - Preliminary estimates indicate that non-recurring gains and losses impacted the company's profit by approximately **68 million yuan** during the reporting period[7](index=7&type=chunk) - The final accurate financial data will be detailed in the company's 2025 half-year report, advising investors to be aware of investment risks[7](index=7&type=chunk)
电力设备新能源行业点评:三部委推动国家级零碳园区申报,节能风电拟投建500MW工业园区铁合金绿电消纳项目
Guoxin Securities· 2025-07-10 07:06
Investment Rating - The investment rating for the electric equipment and renewable energy industry is "Outperform the Market" (maintained) [1] Core Insights - The National Development and Reform Commission, the Ministry of Industry and Information Technology, and the National Energy Administration have jointly issued a notice to promote the construction of national-level zero-carbon parks, encouraging local departments to recommend suitable parks for this initiative [3] - The energy-saving wind power company has approved an investment of 2.09 billion RMB to construct a 500MW green power supply project in Inner Mongolia, which is expected to connect to the grid by the end of December 2026 [4] - The national encouragement of zero-carbon parks and green electricity direct connection projects will benefit the demand for distribution equipment at the park level and incremental distribution network equipment, particularly for DC technology [1][3] Summary by Sections National-Level Zero-Carbon Park Initiative - The notice requires local departments to recommend up to two parks for national-level zero-carbon park construction by August 22 [3] - It emphasizes the development and utilization of renewable energy in and around the parks, supporting the matching of parks with nearby non-fossil energy generation resources [3] Investment Projects - The energy-saving wind power project will install 50 wind turbines with a capacity of 10MW each and includes the construction of a 220kV booster substation and a 75MW/300MWh energy storage system [4] - The generated electricity will be consumed by two ferroalloy companies in the Beijing-Mongolia cooperation industrial park [4] Company Recommendations - Investment suggestions include companies such as Teruid and Sifang Co., with projected net profits for 2024 at 9.2 billion RMB and 7.2 billion RMB respectively [2][6]
大功率充电设施发展提速,超充产业链有望积极受益
Orient Securities· 2025-07-08 13:14
Investment Rating - The industry investment rating is "Positive" and maintained [5] Core Viewpoints - The charging pile industry is transitioning towards high-quality development, with recent policies focusing on the construction of high-power charging facilities, which are expected to accelerate the promotion of ultra-fast charging [3][7] - By the end of 2027, the goal is to have over 100,000 high-power charging facilities nationwide, with a significant emphasis on facilities that output over 250kW [7] - The upgrade to high-power charging will require advancements in core components and integrated systems, benefiting leading companies with superior product and technology capabilities [7] Summary by Sections Industry Overview - The charging pile market is moving from a focus on speed and scale to a new phase of high-quality development, with over half of the public charging piles still being low-power AC piles as of May 2025 [7] Policy Impact - Recent notifications from the National Development and Reform Commission and the National Energy Administration emphasize the need for a rational layout and quality upgrade of high-power charging infrastructure [7] Market Opportunities - The promotion of high-power ultra-fast charging is expected to accelerate, with a target of approximately 5,000 ultra-fast charging stations by 2025, which is still significantly below the 100,000 target for 2027 [7] Technological Advancements - High-power charging requires higher voltage and current, leading to increased technical demands on charging piles and core components, with silicon carbide power devices expected to replace traditional IGBTs [7]
大功率充电桩产业链迎来政策催化
HTSC· 2025-07-08 09:35
Investment Rating - The report maintains a "Buy" rating for both Shenghong Co., Ltd. and Teruid [8][10]. Core Viewpoints - The recent policy notification from four government departments aims to promote the development of high-power charging facilities, targeting over 100,000 units nationwide by the end of 2027, which is expected to accelerate market penetration and enhance profitability for equipment manufacturers and operational efficiency for service providers [1][2]. - The definition of high-power charging facilities is set at a single-gun charging power of over 250kW, with guidance provided on planning, application scenarios, and technical standards [2]. - The demand for high-power charging facilities is anticipated to grow significantly, with the market shifting from AC to DC charging stations, and from lower to higher power levels, indicating a robust growth trajectory for the high-power DC charging segment [3][4]. Summary by Sections Policy and Market Development - The notification encourages local governments to proactively plan for high-power charging infrastructure, with a focus on public transport, logistics, and heavy-duty freight applications [2]. - The report suggests that the policy framework will provide a comprehensive development path for high-power charging facilities, likely leading to increased market penetration [2]. Industry Growth and Demand - In the first five months of 2025, China added 1.583 million charging stations, a year-on-year increase of 19%, with public charging stations growing by 56% [3]. - The report highlights that as fast charging becomes more prevalent, the demand for high-power charging stations is expected to outpace overall industry growth [3]. Company Recommendations - Shenghong Co., Ltd. is recommended due to its potential for revenue growth driven by increasing demand for charging stations and expansion into overseas markets [11]. - Teruid is also recommended, with expectations of improved profitability due to its strong position in the charging business and expansion into international markets [11].
特锐德: 关于2023年限制性股票激励计划第一个解除限售期解除限售股份上市流通的提示性公告
Zheng Quan Zhi Xing· 2025-07-07 09:11
证券代码:300001 证券简称:特锐德 公告编号:2025-062 青岛特锐德电气股份有限公司 关于 2023 年限制性股票激励计划第一个解除限售期 解除限售股份上市流通的提示性公告 本公司及董事会全体成员保证信息披露的内容真实、准确、完整,没有虚 假记载、误导性陈述或重大遗漏。 特别提示: 青岛特锐德电气股份有限公司(以下简称"公司"或"特锐德")于 2025 年 7 月 1 日召开第六届董事会第二次会议,审议通过了《关于 2023 年限制性股票激励 计划第一个解除限售期解除限售条件成就的议案》,并已根据公司《2023 年限制性 股票激励计划》(以下简称"《激励计划》")的相关规定及 2022 年度股东大会 对董事会的授权申请办理 2023 年限制性股票激励计划(以下简称"本激励计划") 解除限售股份上市流通的相关事宜。现将有关情况公告如下: 一、本激励计划已履行的相关审批程序 <青岛特锐德电气股份有限公司2023年限制性股票激励计划 草案="草案"> 及其摘要的议 案》《关于 <青岛特锐德电气股份有限公司2023年限制性股票激励计划实施考核管> 理办法>的议案》《关于提请股东大会授权董事会办理公司202 ...
特锐德:预中标南方电网公司项目金额1.84亿元
news flash· 2025-07-07 08:46
Core Viewpoint - The company has recently won a bid for the first batch of framework tender projects for distribution network equipment from Southern Power Grid Company, with an expected bid amount of 184 million yuan [1] Group 1: Project Details - The project includes the supply of 10kV oil-immersed transformers, 10kV amorphous alloy oil-immersed distribution transformers, 10kV SCB dry-type transformers, and 10kV pre-assembled substations [1] - The successful bid is expected to enhance the company's brand and industry influence [1] Group 2: Financial Impact - The project is anticipated to have a positive impact on the company's future operating performance [1]
特锐德(300001) - 关于预中标南网项目的提示性公告
2025-07-07 08:44
一、预中标项目概况 证券代码:300001 证券简称:特锐德 公告编号:2025-061 青岛特锐德电气股份有限公司 关于预中标南网项目的提示性公告 本公司及董事会全体成员保证信息披露的内容真实、准确、完整,没有虚假记 载、误导性陈述或重大遗漏。 近日,中国南方电网供应链统一服务平台(http://www.bidding.csg.cn/)发布了《南 方电网公司2025年配网设备第一批框架招标项目中标候选人公示》,青岛特锐德电气 股份有限公司(以下简称"公司"或"特锐德")为其部分项目中标候选人,预中标 总金额约18,366.49万元。现将有关预中标情况提示如下: 项目名称:南方电网公司2025年配网设备第一批框架招标项目 招标编号:CG2700022002047452 招标人:中国南方电网有限责任公司 招标代理机构:南方电网供应链集团有限公司 中标内容:10kV油浸式变压器(非晶合金型除外)-全网(包3)、10kV非晶合 金油浸式配电变压器-全网(包2)、10kVSCB干式变压器-深圳(包1)、10kV预装式 变电站-广东(包8) 预计中标金额:18,366.49万元 公示日期:2025年7月3日--2025 ...
特锐德(300001) - 关于2023年限制性股票激励计划第一个解除限售期解除限售股份上市流通的提示性公告
2025-07-07 08:42
关于 2023 年限制性股票激励计划第一个解除限售期 解除限售股份上市流通的提示性公告 本公司及董事会全体成员保证信息披露的内容真实、准确、完整,没有虚 假记载、误导性陈述或重大遗漏。 特别提示: 1、本次解除限售的限制性股票上市流通日:2025年7月10日。 2、本次符合解除限售条件的激励对象人数:686人。 3、本次限制性股票解除限售数量为4,448,100股,占公司总股本的0.4213%。 青岛特锐德电气股份有限公司(以下简称"公司"或"特锐德")于 2025 年 7 月 1 日召开第六届董事会第二次会议,审议通过了《关于 2023 年限制性股票激励 计划第一个解除限售期解除限售条件成就的议案》,并已根据公司《2023 年限制性 股票激励计划》(以下简称"《激励计划》")的相关规定及 2022 年度股东大会 对董事会的授权申请办理 2023 年限制性股票激励计划(以下简称"本激励计划") 解除限售股份上市流通的相关事宜。现将有关情况公告如下: 一、本激励计划已履行的相关审批程序 证券代码:300001 证券简称:特锐德 公告编号:2025-062 青岛特锐德电气股份有限公司 1、2023年5月15日,公 ...
特锐德: 关于2023年限制性股票激励计划第一个解除限售期解除限售条件成就的公告
Zheng Quan Zhi Xing· 2025-07-01 16:41
Core Viewpoint - The announcement details the achievement of conditions for the first unlock period of the 2023 restricted stock incentive plan by Qingdao Teruid Electric Co., Ltd, allowing 4,448,100 shares to be released from restrictions, representing 0.42% of the company's total share capital [1][11]. Summary by Sections Incentive Plan Overview - The 2023 restricted stock incentive plan was approved by the board on June 16, 2023, with a total of 15,187,000 shares granted to 711 middle management and key employees, accounting for 1.46% of the total share capital [2][4]. - The plan has a maximum duration of 60 months from the date of grant until all restricted stocks are either unlocked or repurchased [2]. Unlocking Conditions - The first unlock period lasts from 24 months after the grant date to 36 months after the grant date, allowing for a 30% release of the total restricted stock [6][7]. - The performance assessment for unlocking is based on the company's financial performance over the years 2024 to 2026, with specific targets set for net profit and revenue growth [3][6]. Performance Assessment - The performance assessment for unlocking includes both company-level and individual performance metrics, with individual performance scores determining the actual number of shares that can be unlocked [3][10]. - The performance score thresholds are set at four levels, with scores above 80% allowing for full unlocking [10][12]. Approval Process - The incentive plan underwent several approval processes, including independent opinions from directors and verification by the supervisory board [4][6]. - Legal opinions confirm that the unlocking conditions have been met and that the process complies with relevant regulations [12][13]. Specific Unlocking Details - A total of 686 individuals meet the conditions for unlocking, with 4,448,100 shares eligible for release [11]. - The company has also noted that 25 individuals have left the company and are no longer eligible for the incentive plan, leading to the repurchase of 206,000 shares from 13 individuals [11][12].
特锐德(300001) - 关于2023年限制性股票激励计划第一个解除限售期解除限售条件成就的公告
2025-07-01 11:30
证券代码:300001 证券简称:特锐德 公告编号:2025-060 青岛特锐德电气股份有限公司 关于 2023 年限制性股票激励计划第一个解除限售期 解除限售条件成就的公告 本公司及董事会全体成员保证信息披露的内容真实、准确、完整,没有虚 假记载、误导性陈述或重大遗漏。 特别提示: 1、本次符合解除限售条件的激励对象人数为686人,本次限制性股票解除限售 数量为4,448,100股,占公司总股本的0.42%。 2、本次解除限售事项仍需向有关机构办理相关手续,公司将按照规定发布上 市流通提示性公告,敬请投资者注意。 青岛特锐德电气股份有限公司(以下简称"公司"或"特锐德")于 2025 年 7 月 1 日召开第六届董事会第二次会议,审议通过了《关于 2023 年限制性股票激励 计划第一个解除限售期解除限售条件成就的议案》,同意根据公司《2023 年限制性 股票激励计划》(以下简称"《激励计划》")的相关规定,对 2023 年限制性股 票激励计划(以下简称"本激励计划")中满足本次解除限售条件的激励对象办理 解除限售的相关事宜。现将有关情况公告如下: 一、本激励计划简述及已履行的相关审批程序 (一)本激励计划简 ...