水运
Search documents
2026年春运客流呈现“五个新高” 多举措做好干线运输与城市交通高效衔接
Yang Shi Wang· 2026-01-30 08:29
Core Insights - The transportation sector in 2025 showed stable economic performance with a year-on-year increase in freight volume and port throughput [4] - The 2026 Spring Festival travel period is expected to see record-high passenger flow, with a total of 9.5 billion trips anticipated [5] - Significant increases in self-driving and highway traffic are projected for the 2026 Spring Festival, with new energy vehicle usage also expected to reach historical highs [6] Group 1: Economic Performance - In 2025, the total freight volume reached 5.87 billion tons, marking a 3.2% increase year-on-year [4] - Port cargo throughput was recorded at 1.834 billion tons, reflecting a 4.2% year-on-year growth [4] - Fixed asset investment in transportation is expected to exceed 3.6 trillion yuan in 2025 [4] Group 2: Spring Festival Travel Expectations - The 2026 Spring Festival travel period is projected to have a total of 9.5 billion cross-regional trips, setting a historical record for the same period [5] - Daily average cross-regional travel during the 9-day holiday is expected to reach 299 million trips, potentially a new high for the holiday [5] - The peak daily travel volume is anticipated to break historical records [5] Group 3: Transportation Preparedness - The transportation sector has prepared sufficient capacity across road, rail, air, and water transport [7] - Measures include increasing train frequencies and sharing information on arrival times and passenger numbers to ensure efficient connections between mainline transport and urban traffic [7] - The free toll period for the Spring Festival is from February 15 to February 23, 2026, with a reminder for travelers to be aware of this timeframe to avoid toll fees [7]
“十四五”期间,菏泽公路通车总里程,位居全省第2位
Qi Lu Wan Bao· 2026-01-28 13:57
2021年12月26日,日兰高铁曲阜至菏泽至庄寨段的开通运营,圆了菏泽人民的"高铁梦";2024年7月18 日,日兰高铁全线贯通,菏泽两小时可直达周边13座城市,实现1小时入济入郑、2小时抵青、3小时进 京、6小时可直达广州。 另外,雄商高铁菏泽段建设进展顺利,正线已完成铺轨,2026年9月份建成通车后,将与日兰高铁在我 市形成"十"字交汇,菏泽市北上、南下、西进、东连的时空距离将大幅缩短。 齐鲁晚报·齐鲁壹点 周千清 1月28日,菏泽召开"决胜'十四五'续写新篇章"系列主题新闻发布会(交通运输工作专场),市交通运 输局党组书记、局长马常斌出席发布会介绍"十四五"时期,菏泽市交通运输事业高质量发展情况。市交 通运输局党组成员、市交通运输综合服务中心主任李广根,市交通运输局党组成员、副局长曹燕,市交 通运输局党组成员、副局长晁红波,市交通运输局党组成员、市交通运输综合执法支队支队长张顺法, 市交通运输局党组成员、市交通运输综合服务中心副主任,新闻发言人王哲出席发布会,共同回答记者 关心的问题。 铁路网络布局实现升级,菏泽迈入高铁时代 马常斌说,"十四五"时期,菏泽市累计完成交通基础设施投资较"十三五"时期增长约 ...
贵州省智慧水运(一期)项目通过交付终验
Xin Lang Cai Jing· 2026-01-27 10:38
近日,贵州高速集团所属中南交科公司承建的贵州省智慧水运(一期)工程通过省交通运输厅交付终验。 三审:冀 佳 贵州省智慧水运(一期)工程是中南交科公司首次承接并独立实施的跨领域综合性信息化项目。在建设期 间,公司创新性应用AI视频分析、大数据预测预警等新技术,攻克山区航道复杂环境下的感知监测、 智能调度等多项技术难题。项目的建成投用,展现了公司在智慧交通整体解决方案领域的综合实力。 一审:雅 文 二审:徐妙甜 背景链接:贵州省智慧水运工程是由省大数据管理局批复,省交通运输厅、省交通执法监督局指导,省 交通执法技信中心具体实施。作为全省水运领域数字化转型的核心载体,该工程以破解山区水运管理难 题、提升行业治理能力为核心目标,整合了航道、海事、水运等多领域数据资源,形成了覆盖"监测、 调度、监管、服务"全链条的智慧水运体系,有效打通了传统水运管理中的数据壁垒与业务协同瓶颈, 显著提升全省水运设施利用效率和安全监管效能。 ...
川渝协同创新“信用+过闸”模式,提升嘉陵江水运通行效率
Ren Min Wang· 2026-01-26 09:00
近日,随着信用标识为"蓝码"的"川航001"等船舶优先、快速通过嘉陵江草街船闸,标志着由重庆 市港航海事事务中心与四川省相关部门联合推动的"信用+优先过闸"试点应用迈入新阶段。 数字技术是支撑该模式高效运行的关键。依托"数字港航"建设,该中心打造了智能化的"信用+过 闸"管理系统。该系统打通了川渝两地水路运输信用、处罚、船舶动态等数据壁垒,实现了信用评估、 优先申请、智能调度、结果反馈的全流程线上闭环管理。系统能自动识别高信用船舶并纳入优先调度序 列,使调度效率提升约30%。同时,整合水文气象、发电计划等多源数据,为科学决策提供支持,船员 通过手机APP即可完成大部分操作。 2025年7月,"嘉陵江草街船闸船舶优先过闸"成功入选2025年"信用+交通出行"应用场景试点;8 月,重庆市港航海事事务中心完成试点工作方案制定;11月,重庆市交通运输委员会与四川省交通运输 厅联合印发《嘉陵江草街航电枢纽船闸"信用+优先过闸"试点应用场景实施方案》;12月初,"信用+过 闸"数字系统搭建完成并通过测试,随即进入线上线下试运行阶段。 此举是成渝地区双城经济圈交通运输信用一体化发展从政策规划迈向具体场景实践的关键一步,旨 ...
黔道不再难,出门即坦途!
Xin Lang Cai Jing· 2026-01-25 15:08
一组数据见证实力: 高铁营业里程达1906公里,铁路营运里程4419公里。 出省高铁通道6个,累计铁路出省通道17个。 谁还记得,曾经的贵州,是"地无三里平"的阻隔,是"翻山越岭几半天"的无奈? 而2025年,这座被群山环抱的省份,用一场震撼全国的交通蝶变,彻底改写历史——铁路成网、高速加 密、桥梁凌空、航空通达、水运复苏,"黔道难"的千年慨叹,终于变成"出门即坦途"的当下实景! 这一年,贵州交通全面开花,每一个突破都足以惊艳时光,每一组数据都藏着底气与实力。 高铁圆梦!九市州通高铁,1-2小时逛遍贵州 2025年11月,盘兴高铁正式通车,这一历史性时刻,标志着贵州在西南地区率先实现9个市(州)行政中 心高铁全覆盖,高铁网络彻底闭环成型。曾经从贵阳到兴义要3.5小时,如今坐上盘兴高铁,2小时内就 能直达,沿途串联马岭河峡谷、万峰林等美景,"交通+旅游"的融合之路越走越宽。 贵州的公路,从来都是"逢山开路、遇水架桥"的奋斗写照,2025年,这份底气再升级! 截至目前,贵州高速公路总里程达9563公里,较"十三五"末新增1786公里,彻底实现县县通"双高速"; 公路总里程超22万公里,出黔陆路大通道45条,"六横 ...
广西构建“工”字型水运体系 平陆运河今年9月将具备试通航条件
Zhong Guo Xin Wen Wang· 2026-01-23 06:06
Core Viewpoint - The Guangxi port and shipping industry is set to transition towards a high-quality development phase during the "15th Five-Year Plan" period, focusing on optimizing structure, digital empowerment, and green transformation [1][3]. Investment and Development - During the "14th Five-Year Plan" period, Guangxi's fixed asset investment in water transport reached 125.687 billion yuan, which is 4.97 times that of the "13th Five-Year Plan" [3]. - In 2025, Guangxi's fixed asset investment in water transport was 27.739 billion yuan, exceeding the annual target [3]. - The cargo throughput at ports reached 772 million tons, and container throughput was 11.97 million TEUs, representing year-on-year growth of 8.57% and 10.85% respectively [3]. Strategic Goals and Challenges - The "15th Five-Year Plan" period is identified as a critical stage for high-quality development in Guangxi's water transport sector, with a focus on leveraging national strategies and addressing challenges in resource assurance, facility layout, and talent support [3][4]. - Key strategic directions include enhancing capabilities, improving connectivity, strengthening services, promoting transformation, and optimizing governance [3]. Future Plans - In 2026, the Guangxi port and shipping system will focus on operational support for the canal, establishing an integrated scheduling system for rivers and seas, and enhancing the strategic positioning of the Beibu Gulf Port [4]. - The investment target for engineering projects is set to exceed 18 billion yuan, with an emphasis on expanding waterways and upgrading ports [4]. - The industry aims to improve service efficiency, deepen administrative reforms, and promote multimodal transport development [4].
重庆2026年春运铁公水空客运量预计超3000万人次
Zhong Guo Xin Wen Wang· 2026-01-21 12:53
Core Viewpoint - The Chongqing transportation department anticipates that the passenger volume during the 2026 Spring Festival travel season will exceed 30.35 million, with comprehensive measures being implemented to ensure smooth transportation across various modes [1][2]. Group 1: Transportation Volume and Dates - The 2026 Spring Festival travel period is scheduled from February 2 to March 13, with an expected total passenger volume of 30.357 million [1]. - The transportation department will optimize train schedules and operations to facilitate smooth transfers at key stations [1]. Group 2: Railway Transportation Measures - Measures include adding night trains and temporary trains based on ticket booking trends to meet passenger demand [1]. - The focus will be on ensuring orderly transfers at major railway stations such as Chongqing West, North, and East stations [1]. Group 3: Road Transportation Initiatives - The promotion of intermodal transport solutions like "air-bus" and "rail-road" will be emphasized, enhancing connections between roads, airports, train stations, and tourist attractions [1]. - A "volume-price linkage" mechanism will be implemented to improve customized road passenger services [1]. Group 4: Water Transportation Plans - The transportation department will ensure the availability of additional capacity for popular routes like "Two Rivers Tour" and "Three Gorges Tour" to accommodate sudden increases in waterway passenger traffic [1]. - Services will be enhanced to cater to the growing number of international tourists [1]. Group 5: Aviation and Public Transport Support - Detailed service guarantees and emergency response plans will be established for the aviation sector to manage flight delays or cancellations due to extreme weather [2]. - Improvements will be made to the efficiency of transport connections at key hubs like train stations and airports, focusing on the "first and last mile" of travel [2].
路网通达百业兴
Jing Ji Ri Bao· 2026-01-14 22:13
Core Insights - The transportation sector is crucial for national development, with significant investments and expansions planned for 2025, including over 2000 kilometers of new high-speed rail and 8000 kilometers of new highways [1] - The total fixed asset investment in transportation is expected to exceed 3.6 trillion yuan in 2025, contributing to a more dense transportation network [1] Investment and Infrastructure Development - By 2025, the completion rate of the national comprehensive three-dimensional transportation network will exceed 90%, with high-speed rail covering approximately 97.2% of cities with populations over 500,000 [1] - The investment during the "14th Five-Year Plan" period is projected to reach 18.8 trillion yuan, enhancing connectivity and efficiency across various transportation modes [1] Technological Advancements - The level of intelligence in transportation has improved, with about 1700 kilometers of highways and over 2200 road and waterway facilities undergoing digital transformation [2] - The number of automated container and bulk cargo terminals has reached 60, maintaining a leading position globally in terms of scale and technology [2] Service Capacity and Usage - By 2025, inter-regional passenger flow is expected to exceed 66 billion trips, with a projected 580 billion tons of freight volume, reflecting a year-on-year growth of approximately 3.5% [2] - Urban rail transit mileage has surpassed 11,000 kilometers, with daily ridership exceeding 90 million, indicating a robust public transport system [2] Consumer Trends and Market Growth - The rental market for small and micro passenger vehicles has reached 4 million units, with an expected annual growth rate of around 15% during the "15th Five-Year Plan" period [3] - The cruise passenger transport volume reached 1.265 million in the first 11 months of 2025, marking a year-on-year increase of 27.8%, contributing positively to tourism and consumption [3] Strategic Planning - The "15th Five-Year Plan" suggests enhancing the modern comprehensive transportation system, focusing on cross-regional coordination and improving coverage in underdeveloped areas [3] - The ongoing development of the transportation network aims to facilitate smoother movement of people and goods, supporting China's modernization efforts [3]
连云港两大二级航道工程初步设计获批
Xin Hua Ri Bao· 2026-01-10 21:21
Core Viewpoint - The approval of the preliminary designs for two major waterway projects in Lianyungang marks a significant advancement in the preliminary work of these key transportation initiatives [1] Group 1: Project Details - The Lianyungang Port Channel Improvement Project spans approximately 32.5 kilometers, with a designed vessel capacity of 2,000 tons and a total estimated investment of 3.188 billion yuan, with a construction period of 4 years [1] - The Su-Lian Channel Lianyungang Section Secondary Channel Improvement Project covers about 22.2 kilometers, also designed for vessels of 2,000 tons, with an estimated investment of 981 million yuan and a construction period of 30 months [1] Group 2: Strategic Importance - These projects are crucial components of the Xu-Su Lian Channel, which will enhance the high-grade sea-river intermodal transport system in Lianyungang, improving navigation capacity and transportation efficiency [1] - The completion of these projects will optimize the provincial waterway network supply, promote transportation structure adjustments, and reduce logistics costs for enterprises in the hinterland, thereby supporting the construction of Lianyungang as an international hub port [1]
岔街子,沉入岁月的烟火旧梦
Xin Lang Cai Jing· 2026-01-08 16:57
这条狭窄街市地处万州城最西端,紧临全城最大水码头,自然而然成了方圆百里最繁盛的农贸市场,也 是三峡地区重要的土特产集散地。长江航运的黄金年代里,清晨有河对岸的菜农挑着带露的担子挤下渡 船,沿街叫卖新鲜蔬果;夜晚有离船上岸的旅客踏上十七码头大梯子,在200瓦大灯泡的光晕下,于路 边摊蒸腾的羊肉香气与藤编竹香中寻觅旅途慰藉。 于我而言,岔街子的意义始终与"过年"紧紧相连。平日里鲜有涉足,唯有临近春节,才会跟着母亲前往 采购年货。一踏入街巷,只见两旁是低矮参差的木板房,黑瓦屋顶层层叠叠,有的已爬满青苔;斑驳的 店铺招牌下,摊位向街面延伸,中间仅留一条窄道供人侧身而过。空气中,鱼腥、菜香、禽畜气息与汗 味交织,酿成一种独特而难忘的气息。 母亲背着背篼、拉着我的手在人流中穿梭,目光在菜摊间扫视,甄选过年所需的食材与年货。最让我驻 足流连的是鱼摊:大塑料盆与水泥池里,有的鱼拼命挣扎,尾巴拍打出四溅的水花;有的则静静躺在案 板上,眼珠混浊,身躯僵直。万州人常用"岔街子的鱼,死的多活的少",来调侃那些从一开始便大概率 会失败的事。儿时的我不解其意,多年后,当我亲见一些事与愿违、徒劳挣扎的事情发生,这句俗语才 蓦然撞回心头。 ...