Workflow
桥梁建设
icon
Search documents
2.7万吨!菏泽市单体重量最大立交桥转体成功
Qi Lu Wan Bao Wang· 2025-09-11 10:24
Core Viewpoint - The successful completion of the rotation construction of the Xumin Expressway overpass bridge marks a significant milestone for the project, laying the foundation for the overall opening of the expressway [1][3]. Group 1: Project Details - The Xumin Expressway overpass bridge spans 150 meters in length, 30.75 meters in width, and weighs 27,000 tons, consisting of six segments that were cast and then rotated as a whole [3]. - The bridge's rotation involved a counterclockwise turn of 71.3 degrees, achieving a total rotation angle of 85.3 degrees, with precise positioning over the Jingjiu Railway [3]. - The construction faced challenges such as high train traffic density on the Jingjiu Railway, limited working hours, narrow workspaces, high safety risks, and complex technical requirements [3]. Group 2: Construction Management and Innovation - Since its commencement in December 2023, the Xumin Expressway Company has adhered to a philosophy of high standards and efficiency, successfully overcoming multiple construction challenges [4]. - The project has implemented a "smart construction" approach, utilizing a construction engineering information system and enhancing safety management through a comprehensive four-dimensional approach [4]. - The Xumin Expressway single section is a crucial part of Shandong Province's 14th Five-Year Plan for highways, connecting key regions and improving the overall transportation network [4].
主跨1768米 双屿门特大桥首个主塔封顶
Ren Min Ri Bao· 2025-09-07 22:16
Core Points - The completion of the concrete pouring for the main tower of the Shuangyumeng Grand Bridge marks a significant milestone in the second phase of the Ningbo-Zhoushan Port Liuhong Highway Bridge project, undertaken by China Railway Construction Bridge Bureau [1] - The main span of the bridge reaches 1,768 meters, connecting Liuhong Island and Foduo Island [1] - The main tower stands at a height of 246.3 meters and is constructed using 12,000 tons of steel bars, 32,000 cubic meters of concrete, and 3,500 tons of section steel [1]
全球发展倡议:惠及各国民众的公共思想产品
Xin Hua She· 2025-09-06 22:14
Group 1 - The Global Development Initiative is becoming a new hope for developing countries, addressing global development challenges and focusing on key areas such as poverty alleviation, food security, climate change, and digital economy [1][2] - Since its launch in 2021, the initiative has gained widespread attention and support, emphasizing principles like prioritizing development, people-centered approaches, inclusivity, innovation, and harmony with nature [1][2] - As of 2024, the initiative has mobilized nearly $20 billion in development funds and initiated over 1,100 projects benefiting multiple countries, injecting strong momentum into global development [3] Group 2 - The "Friends of the Global Development Initiative" group was established in January 2022, with over 80 countries joining, aiming to create an inclusive and transparent platform for sharing development experiences [2] - Successful examples of the initiative include significant infrastructure projects in Iraq and Croatia, which have improved local economies and living standards [2] - The initiative reflects China's commitment to promoting global cooperation and building an open world economy amidst rising protectionism [3]
9月6日新闻夜览
Sou Hu Cai Jing· 2025-09-06 12:50
Group 1 - The automotive industry is experiencing continuous iteration driven by high-level intelligent technology, comprehensive safety guarantees, and an open cooperation ecosystem showcased at the World Intelligent Industry Expo 2025 in Chongqing [1] Group 2 - The Ningbo-Zhoushan Port Liuhong Highway Bridge, with a main span of 1768 meters, has successfully completed the topping of its first main tower, making it the largest span cross-sea bridge in China upon completion [3] Group 3 - Chinese scientists proposed a concept for asteroid detection, defense, and resource utilization at the third Deep Space Exploration International Conference, emphasizing the need for global cooperation in planetary defense [4][6] Group 4 - A breakthrough in end-to-end hazardous weather short-term warning technology for non-controlled airspace has been achieved, allowing for accurate 15-minute advance warnings for drone turbulence, enhancing safety for the low-altitude economy [7] Group 5 - The U.S. Labor Department reported significantly weaker-than-expected non-farm employment data, leading to a sharp decline in U.S. stocks and the dollar index, and strengthening market expectations for a potential interest rate cut by the Federal Reserve [11]
浙江:双屿门特大桥东主塔顺利封顶
Xin Hua She· 2025-09-06 08:08
Group 1 - The completion of the main tower of the Shuangyumeng Grand Bridge marks a significant progress in the construction of the second phase of the Sixiang Highway Bridge project [1] - The Sixiang Highway Bridge project consists of multiple bridges and connecting lines, including the Shuangyumeng Grand Bridge and the Qinglongmen Grand Bridge, forming a highway corridor [1] - The project aims to enhance the sea-land intermodal transportation network of Ningbo-Zhoushan Port and promote the development of the Zhoushan Archipelago New Area and Zhejiang's marine economy [1]
一跨1768米!国内最大跨度跨海大桥首个主塔顺利封顶
Xin Lang Cai Jing· 2025-09-06 06:47
Core Viewpoint - The completion of the first main tower of the Shuangyumeng Grand Bridge marks a significant milestone in the construction of the second phase of the Ningbo-Zhoushan Port Liuhong Highway Bridge project, which is being undertaken by China Railway Construction Bridge Bureau [1] Group 1 - The Shuangyumeng Grand Bridge connects Liuhong Island and Foduo Island, featuring a main span of 1,768 meters [1] - Upon completion, it will become the largest span sea-crossing bridge in China [1]
贵州乌长高速公路金旗特大桥合龙
Zhong Guo Xin Wen Wang· 2025-09-05 07:36
Core Points - The Jinqi Grand Bridge, a key project of the Wuchang Expressway, has successfully completed its closure, marking a significant milestone in its construction [1] - The bridge is the tallest and largest of its kind in the world, featuring a double-tower, double-cable-stayed design [1][3] Project Details - The Jinqi Grand Bridge is located in the Xiuwen County of Guiyang, Guizhou Province, spanning a V-shaped deep canyon at an altitude of 1300 meters and crossing the Mao Tiao River [3] - The bridge has a total length of 672 meters and is designed with dual two-way lanes, constructed using a steel-concrete composite beam [3] - The main tower of the bridge reaches a height of 300.6 meters, with a vertical drop of over 355 meters from the top to the water surface [3] Technical Challenges and Innovations - The construction faced several technical challenges, including the installation of a 300-meter high connected tower and precise control of the steel beam installation [3] - The project team conducted systematic research on high-performance concrete using machine-made sand and optimized the selection of high-pressure pumping equipment [3] - The introduction of BIM (Building Information Modeling) and intelligent real-time monitoring systems allowed for millimeter-level verticality control during the construction of the main tower [3] Economic and Social Impact - Upon completion, the Wuchang Expressway will enhance the highway network structure in Guiyang, facilitating a 1 to 2-hour traffic circle around the Guiyang metropolitan area [3] - The project is expected to significantly improve transportation convenience and has profound implications for the high-quality economic and social development of the central Guizhou region [3]
回升向好态势延续 交通固定资产投资规模保持高位
Core Insights - The transportation sector in China is experiencing a continuous recovery, with stable growth in freight volume and inter-regional personnel movement, alongside rapid growth in port cargo throughput and high levels of fixed asset investment [1][2][3] Investment Performance - In July, China's fixed asset investment in transportation reached 306.1 billion yuan, with railways accounting for 77.1 billion yuan, highways 200.5 billion yuan, waterways 17.3 billion yuan, and civil aviation 11.2 billion yuan [2][3] - For the first seven months of the year, total fixed asset investment in transportation was 1.95 trillion yuan, with railway investment growing by 5.6% year-on-year [3] Freight Volume Growth - From January to July, the national railway transported 2.331 billion tons of goods, with a daily average of 183,300 cars, reflecting year-on-year increases of 3.3% and 4.1% respectively [4][6] - In July, the total operating freight volume reached 4.97 billion tons, a year-on-year increase of 3.4%, with rail, road, waterway, and civil aviation freight volumes growing by 4.5%, 3.3%, 3.4%, and 15.3% respectively [6][7] Technological Advancements - The Ministry of Transport emphasized the need to cultivate new productive forces in the transportation sector, focusing on major technological breakthroughs and the development of smart transportation [7][8] - The establishment of the Transportation Big Model Innovation and Industry Alliance marks a shift towards collaborative development in transportation modeling, aiming to leverage artificial intelligence for industry innovation [7][8]
南美小国圭亚那资源丰富,美国操心:中国给造桥,还想要地区影响力
Guan Cha Zhe Wang· 2025-09-02 03:16
Core Insights - The upcoming elections in Guyana are expected to have significant implications for the global oil market and the United States, given the country's increasing oil production and strategic resources [1][3][5] Economic Impact - Guyana's economy has transformed since 2015, when ExxonMobil discovered approximately 11 billion barrels of oil, leading to a surge in oil production [3][4] - The country currently produces about 650,000 barrels of oil per day, with projections indicating that by 2035, production could reach approximately 2 million barrels per day, surpassing the total output of several neighboring countries [3][4] - Guyana's GDP growth rates have been remarkable, with a 63.3% increase in 2022 and a projected 33.8% growth in 2023, marking five consecutive years of double-digit growth [3][4] Political Context - The elections are crucial for the management of the newfound oil wealth, with analysts emphasizing the need for inclusive and stable governance to avoid undermining democracy [4][5] - The current president, Irfaan Ali, is seeking re-election amidst competition from notable figures, including Aubrey Norton and Azruddin Muhammad, the latter of whom is under U.S. sanctions [4][5] Territorial Disputes - Tensions with Venezuela over the Essequibo region, which is rich in oil and gas resources, have escalated, particularly following recent discoveries in the area [5][6] - Venezuela's National Assembly has approved a referendum regarding the region's sovereignty, which Guyana views as a violation of international law [6] Geopolitical Dynamics - Guyana is positioned between U.S. and Chinese economic interests, with U.S. companies leading in oil production while Chinese investments focus on infrastructure projects [8][12] - The construction of the new Demerara River Bridge, funded by China, is a significant infrastructure project that highlights China's growing influence in the region [9][11] - Analysts suggest that if Guyana can balance relations with both superpowers, it could leverage these connections for economic and political benefits [8][12]
“一带一路”中欧班列西安集结中心空铁联运项目主线桥贯通
Shan Xi Ri Bao· 2025-09-01 23:07
Core Viewpoint - The completion of the last asphalt layer on the main bridge marks a significant milestone for the "Belt and Road" initiative, enhancing connectivity and efficiency in logistics between regions [1] Group 1: Project Overview - The main bridge of the Xi'an Central Hub for the China-Europe Railway Express, constructed by China State Construction Engineering Corporation (CSCEC), spans over 1200 meters and is the first asymmetrical concrete beam bridge of its kind in China [1] - The project emphasizes a philosophy of "green and low-carbon construction" and aims to deliver a high-quality engineering solution through smart and sustainable building practices [1] Group 2: Impact on Transportation Efficiency - The project is expected to improve the traffic efficiency of the Xi'an-Yan'an Expressway by 30%, reducing travel time from over 40 minutes to under 20 minutes between the Changan International Port and the Gaoling District [1] - As a core link in the "land port + air port" dual hub of the Changan International Port, the project will facilitate rapid connections to various regions, promoting the integrated development of land and air transport [1] Group 3: Logistics and Operational Benefits - The project aims to enhance the operational efficiency of the China-Europe Railway Express (Xi'an) by achieving a 15% improvement in logistics timeliness through a unified transport system involving rail, road, and air [1]