Workflow
交通基础设施建设
icon
Search documents
大湾区又一“超级通道”,要来了?
3 6 Ke· 2025-09-25 02:10
Core Insights - The Shenzhen-Zhuhai Channel project has made significant progress with the recent public solicitation for opinions on the preliminary research project, indicating a step forward in this major transportation infrastructure initiative [2][3]. Group 1: Project Overview - The Shenzhen-Zhuhai Channel is a composite transportation corridor that will include a highway, high-speed rail, and intercity rail, designed to enhance connectivity between Shenzhen and Zhuhai [2]. - The project has a budget of 20.8 million yuan and aims to provide critical technical support for the channel's inclusion in national planning [2]. - The channel will reduce travel time between Shenzhen and Zhuhai to approximately 30 minutes upon completion [2]. Group 2: Strategic Importance - The channel is positioned as a "middle ring" corridor in the context of existing transportation links, addressing the high demand for traffic between the east and west banks of the Pearl River Estuary [3]. - The rapid saturation of the Shenzhen-Zhongshan Channel highlights the urgent need for additional infrastructure to support the growing transportation demands in the region [3]. Group 3: Government Support and Future Prospects - The Guangdong Provincial Development and Reform Commission has included the preliminary research for the Shenzhen-Zhuhai Channel in its budget for 2025, reflecting governmental commitment to the project [4]. - Local governments are actively promoting the integration of the Shenzhen-Zhuhai high-speed rail into the 14th Five-Year Plan, indicating a strategic push for the project's advancement [4]. Group 4: Economic Impact - The Shenzhen-Zhuhai Channel is expected to significantly boost the transfer of industries from Shenzhen to the western bank of the Pearl River, particularly benefiting Zhuhai [5]. - The anticipated collaboration between Shenzhen's technological innovation and Zhuhai's manufacturing base is expected to accelerate the transformation of technological achievements and the integration of industrial chains within the Greater Bay Area [5].
山东高速集团承建的马来西亚尼莱智慧城市建设项目开工
Qi Lu Wan Bao· 2025-09-24 02:48
Core Points - The groundbreaking ceremony for the Nilai Smart City project, undertaken by Shandong Hi-Speed Group, marks the official commencement of the project, which is the largest single contract in Southeast Asia for the group [2] - The project aims to invest $7 billion (approximately 50.1 billion RMB) over ten years to develop a modern smart city, including an automotive manufacturing center, high-tech smart manufacturing center, medical city, and commercial center [2] - The project is expected to create over 50,000 jobs, significantly enhancing local living standards and economic development [2] Company Strategy - Shandong Hi-Speed Group plans to leverage its full industry chain advantages in transportation infrastructure, integrating resources and managing the project effectively [3] - The company aims to establish the project as a benchmark for overseas smart cities, enhancing its core competitiveness in international markets and the influence of its "Shan Gao · Xing" brand [3] - The project will be executed in seven phases based on owner investment, customer demand, and fund recovery progress, with the first phase contract valued at $1.6 billion (approximately 11.45 billion RMB) [2]
青岛北站西广场交通改造即将开工
Qi Lu Wan Bao· 2025-09-18 09:50
记者赵波 实习生孙雨彤青岛报道 近期,青岛市民对火车北站西广场交通拥堵、通行效率不高的问题反映强烈。青岛市住房和城乡建设 局、青岛市交通运输局、青岛市公安局交通管理支队等多部门联动,启动青岛北站西广场交通改造提升, 交通改造后的西广场计划于9月底试运行。 改造将充分利用火车北站西广场现状道路,对局部路口进行微调,将站前壶关路由双向通行调整为南向北 单行,与安泽路等广场周边道路共同形成大范围单向快速疏解环路。 青岛北站西广场站前落客区由四车道双排扩容为六车道三排,站前落客能力提升50%,满足所有车辆站前 落客需求。设置网约车专用停车场,规范网约车运营秩序。优化公交、出租车和社会车辆停车场布局,实 现各类交通方式的有序、高效换乘。 在火车北站西广场同步增设智能交通设施,包括电子围栏、交通监控、限时违停抓拍系统、人行导向标 识系统等,实现智慧化管理。 改造后,将大幅提升青岛北站西广场的地面交通疏解能力,为旅客提供更加高效舒适的出行体验,进一步提 升北站城市交通窗口形象。 改造期间,火车北站西广场正常到发旅客,社会车辆可以正常进出站接送。由于站前道路渠化可能造成短 时不畅,请广大市民和旅客朋友谅解,也提醒大家规划好自 ...
江苏省交通综合执法局对沈海高速滨海服务区高压增容施工现场开展专项监管
Yang Zi Wan Bao Wang· 2025-09-17 03:38
目前,施工单位已按要求完成整改。大队将组织"回头看"检查,持续跟踪整改落实情况,确保中秋、国庆假期前顺利完成扩容项目,为广大新能源车主提 供更加安全、便捷的充电服务。 通讯员:周焜 9月15日下午,江苏省交通综合执法局沿海支队第二大队对G15沈海高速滨海服务区高压增容顶管施工现场开展专项监管,针对检查中发现的应急物资不 全、施工区域封闭不完善等安全隐患,执法人员现场责令立即整改,确保这一民生工程安全有序推进。 "随着双节临近,充电扩容项目时间紧任务重,但安全生产底线决不能突破。"第二大队负责人表示。作为缓解节假日服务区充电压力的重点工程,大队采 取"提前介入、全程监管"的模式,重点检查了施工现场安全防护措施落实情况。发现配电箱旁未配备绝缘手套和灭火器、施工区域隔离设施设置不规范等 问题后,执法人员当场下达整改要求,要求施工单位立即补充应急物资,完善封闭措施,确保施工安全。 校对胡妍璐 ...
四大市级工程全速推进 宝山交通迎重大利好 高效联动“大吴淞”“大东方”
Jie Fang Ri Bao· 2025-09-13 01:11
记者 吴越 军工路快速路实现结构贯通,逸仙路高架长逸路下匝道提前通车,S16蕰川高速和S5沪嘉高速建设 全面启动……上海北部交通版图正悄然改写。 作为上海面向长三角北部地区的关键门户,宝山区正成为上海交通建设的"主战场",四大市级重大 工程正全速推进。这些项目不仅将极大改善区域交通条件,更是加速长三角一体化血脉流通、强化上海 国际航运中心功能的重要基础设施。 打通北上新通道 S16蕰川高速是《上海市城市总体规划(2017—2035年)》中骨干路网的重要组成部分,承担着高 速干线公路射线功能。该线路南起上海绕城高速(G1503),北至江苏省界,全长约17.6公里。目前工 程已进入全面建设阶段,预计2026年初通车。值得一提的是,S16采用"客货分离"创新设计,同时满足 长途过境、省际联络、港口集疏运、区域到发等多重功能,效率导向明确,设计考虑将货车交通引导至 高架主线,地面道路主要服务客运交通,这一设计减少了38处地面交叉路口干扰,预计能使此路段货运 速度提升60%,物流成本降低15%。 S16蕰川高速的建成将极大促进宝山北部地区发展,项目串联起罗店城镇圈、宝山工业园区、宝钢 产业社区等重点区域,使这些区域半小 ...
G2京沪高速商河北互通立交及连接线工程正式通车运营
Qi Lu Wan Bao Wang· 2025-09-10 08:06
该工程负责人介绍,高速采用主匝道下穿京沪高速A型单喇叭方案,预留双喇叭建设条件,主线加宽段全长1003米,匝道 全长3021米,连接线全长2.5公里,商河北收费站设3进3出收费岗亭。 齐鲁晚报.齐鲁壹点王贝艺 9月8日上午,G2京沪高速商河北互通立交及连接线工程正式通车运营,这是商河打造"交通强县"的又一重要成果,也为高 质量发展注入新的强劲动力。 该项目与创新产业(300832)园高效连通,将进一步增强区域通行能力、提升运输效率并有效降低物流成本。同时,商河 北互通立交及连接线工程对打造"T字型"高铁网、"十"字型高速网、"621"综合交通枢纽具有重要意义。 据了解,G2京沪高速商河北互通立交及连接线工程投资2.4亿元,由山东惠商水务发展集团有限公司承建。项目自启动以 来,各参建单位科学谋划,坚持高标准施工,确保项工程质量、安全与进度。 ...
邹城至济宁高速公路上跨京沪铁路立交桥项目迎来新进展
Qi Lu Wan Bao· 2025-08-30 06:05
Core Viewpoint - The construction of the overpass bridge project on the Zou Cheng to Ji Ning expressway has made significant progress, marking an important step in the infrastructure development of the southwestern Shandong region [1][3]. Group 1: Project Details - The project is a key engineering initiative located near the Beijing-Shanghai Railway, with an average of nearly 400 trains passing daily [3]. - The completed T-shaped box girder is a single box four-chamber structure, with a main bridge superstructure designed as 2×85m full prestressed concrete variable cross-section [3]. - The height of the mid-support beam is 9.0 meters, equivalent to a three-story building, while the edge support beam is 3.5 meters high [3]. Group 2: Construction Techniques - The construction team adopted an "intelligent monitoring + precise control" approach, ensuring the stability of the support frame within a deviation of ≤1mm per day during the construction phase [4]. - A "two ends to the middle, symmetrical layering" pouring technique was used, along with an intelligent temperature control system to maintain the core temperature below 65°C during the concrete pouring phase [4]. Group 3: Safety Measures - A "three-layer protection network" was established to ensure safety, including a 2-meter high blue steel plate enclosure and a 1.2-meter high hard isolation facility [4]. - The project maintained a safety distance of ≥11.9 meters from the railway fence, with real-time communication of train operation information to ensure no disruptions occurred during construction [4]. Group 4: Project Impact - Upon completion, the project will eliminate traffic bottlenecks between Zou Cheng and Ji Ning, enhancing the expressway network in southwestern Shandong and alleviating the traffic load on National Highway 104 [8]. - The overpass design allows for a three-dimensional intersection between the expressway and the Beijing-Shanghai Railway, ensuring the safe and stable operation of this national trunk railway [8]. - The project is expected to support the integration of transportation in the Huaihai Economic Zone, promoting industrial collaboration, personnel exchanges, and high-quality economic development in the region [8].
世界最长海底双向六车道高速公路隧道开工
Zhong Guo Xin Wen Wang· 2025-08-28 14:13
Core Points - The construction of the world's longest underwater dual-direction six-lane highway tunnel has officially commenced, marking a significant step in the integration of transportation in the Yangtze River Delta region [1][2] - The project, known as the Ningbo-Qidong Highway, has a total investment of approximately 31.3 billion RMB and spans about 46 kilometers, connecting Ningbo to Zhoushan [1] - The underwater tunnel, measuring approximately 11.6 kilometers, is designed to handle high water pressure and complex geological conditions, utilizing advanced technologies for construction [1] Investment and Economic Impact - The completion of the Ningbo-Qidong Highway will create a "dual channel" for Zhoushan, alleviating current traffic pressure and enhancing transportation efficiency [2] - This infrastructure project is expected to strengthen connections between Zhoushan and major cities in the northern Yangtze River Delta, including Ningbo, Hangzhou, and Shanghai, thereby accelerating regional integration and development [2]
川渝交通一体化 “内外兼修”建设高能级开放枢纽
Si Chuan Ri Bao· 2025-08-25 22:15
Core Viewpoint - The article highlights the significant progress in transportation infrastructure and connectivity between Sichuan and Chongqing, emphasizing the establishment of a comprehensive transportation network that enhances economic integration and facilitates efficient movement of people and goods [1][2] Transportation Infrastructure Development - A total of 26 inter-provincial corridors have been established between Sichuan and Chongqing, achieving basic one-hour direct connections between major cities [1] - The Chengdu-Chongqing high-speed rail operates a train every 9 minutes, with over 1 million passengers traveling daily [1] - The expansion of the Chengdu-Chongqing Expressway is underway, aiming to increase daily traffic capacity to 100,000 vehicles and reduce travel time by one hour [1] Inter-City Connectivity - Customized passenger transport services have been launched, with 25 routes connecting six cities in Sichuan to Chongqing [1] - The cross-province public transport system has developed 26 inter-city bus routes, serving over 4 million passengers annually [1] - The integration of transportation services has improved cross-province commuting, with new options like the convenient express bus service between Chongqing and Zigong [1] Logistics and Trade Facilitation - The Chengdu-Europe Express has expanded to 51 operational routes, connecting over 130 cities domestically and internationally [1] - The construction of the Longjiang Railway is progressing, aiming to enhance the logistics network and connect the southern region of Sichuan to the Beibu Gulf [2] - The establishment of the Jialing River Lize Shipping Hub will significantly improve shipping capabilities and create new transportation channels for bulk goods [2] Future Development Goals - The Sichuan-Chongqing region aims to build a comprehensive transportation system that includes road, rail, and waterway networks, enhancing overall connectivity [2] - The goal is to create a one-hour commuting zone between major urban centers and establish a robust logistics corridor that supports economic growth [2] - The region is focused on developing a world-class airport cluster, with significant expansions at Chengdu Tianfu and Chongqing Jiangbei airports [2]
全域联通系统优化 精细管理构建互联互通高快衔接便捷高效的综合交通体
Xi An Ri Bao· 2025-08-18 03:02
Core Points - The mayor emphasizes the importance of implementing Xi Jinping's urban work philosophy and the spirit of the Central Urban Work Conference to enhance urban transportation infrastructure [1][2] - The focus is on creating a comprehensive transportation system that is interconnected, efficient, and well-managed, with significant projects like the High-tech to Huyi Expressway as key supports [1][2] - The strategy includes optimizing systems and processes for transportation infrastructure, ensuring effective planning, design, and operational mechanisms [1][2] Group 1 - The mayor highlights the need for a comprehensive transportation system that enhances connectivity between cities, economic units, and industrial corridors [1] - Key projects include high-speed rail stations, intercity railways, subways, and the expansion of urban expressways to improve transportation efficiency [1] - The approach emphasizes the integration of planning, construction, and management to create a modern urban cluster and metropolitan area [1][2] Group 2 - The focus on fine management involves utilizing smart transportation and municipal road improvements to ensure precise adaptation of various elements like people, vehicles, and infrastructure [2] - The goal is to explore new urban development and operational models, fostering a comprehensive service provider for urban management [2] - The initiative aims to achieve high-quality urban renewal, efficient governance, and high-quality services through integrated planning and digital empowerment [2]