CR450高速动车组

Search documents
成渝中线高铁新进展!将实现时速400公里运营
Zhong Guo Chan Ye Jing Ji Xin Xi Wang· 2025-07-27 22:23
Group 1 - The Chengyu Middle Line High-Speed Railway will operate at a speed of 400 km/h, reducing travel time between Chengdu and Chongqing to 50 minutes upon completion [1] - The railway is a key part of China's "Eight Vertical and Eight Horizontal" high-speed rail network, with a total length of 292 kilometers and a design speed of 350 km/h [2][3] - The railway will connect with several existing and under-construction high-speed rail lines, enhancing the transportation network in the Chengdu-Chongqing area and supporting the development of the Chengdu-Chongqing economic circle [3] Group 2 - The CR450 high-speed train is expected to be the core technology supporting the 400 km/h speed target, with ongoing technological innovations and infrastructure verification [4] - The CR450 train has achieved international leadership in key performance indicators such as operational speed, energy consumption, noise levels, and braking distance, promising a better travel experience [4] - The CR450 train has completed various stages of development, including prototype testing and performance validation, in preparation for trial operations [4][5]