绿电制氢

Search documents
填补辽宁风电发电机产业空白 新民市打造新能源全产业链
Zhong Guo Xin Wen Wang· 2025-05-27 10:30
Group 1 - The core viewpoint of the article highlights the development of a wind power generator and related supporting industry demonstration project by Goldwind Technology in Xinmin City, Shenyang, which is expected to fill the gap in the wind power generator industry in Liaoning Province and support the establishment of a significant wind power equipment center in Northeast China [1][3] - The project is part of a broader initiative to build an energy supply base in the Shenyang metropolitan area, focusing on a complete industrial chain from renewable energy equipment manufacturing to wind and solar power generation, energy storage, and green low-carbon circular economy [3][4] - Additional projects include a 2.1 billion yuan investment in a new tower manufacturing base and gearbox production base by China Power Construction, which will produce 500 tower units and 750 gearboxes annually upon completion [3][4] Group 2 - Xinmin City is developing wind power projects in the wind-rich Hexi area, with three centralized wind power projects totaling 6 billion yuan and a total installed capacity of 600,000 kilowatts; one project has been completed, providing 410 million kilowatt-hours of green electricity annually [4][6] - The city is also advancing distributed photovoltaic projects, aiming for 1,757 distributed photovoltaic users and a grid-connected capacity of 122.7 megavolt-amperes by the end of 2024 [6][8] - A 1.01 billion yuan investment in a 100-megawatt new energy storage station project has been approved as a provincial demonstration project, while a 5 billion yuan biomass energy recycling project is set to consume 233,600 tons of crop straw annually, producing 19 million cubic meters of natural gas and reducing carbon dioxide emissions by 350,000 tons each year [8]