源网荷储一体化
Search documents
两部门:到2030年光热发电总装机规模力争达到1500万千瓦左右,度电成本与煤电基本相当
Jin Rong Jie· 2025-12-23 02:50
12月23日,国家发改委、国家能源局发布《关于促进光热发电规模化发展的若干意见》,其中提出,积 极推进光热发电项目建设,不断拓展光热发电开发利用新场景,保障光热发电规模化发展。 河北省、内蒙古自治区、吉林省、四川省、西藏自治区、甘肃省、青海省、宁夏回族自治区、新疆维吾 尔自治区发展改革委、能源局,国家能源局有关派出机构,有关电力企业: 光热发电兼具调峰电源和长时储能的双重功能,能够实现用新能源调节支撑新能源,能够为电力系统提 供长周期调峰能力和转动惯量,具备在部分区域作为调峰和基础性电源的潜力,是实现新能源安全可靠 替代传统能源的有效手段,是加快构建新型电力系统的有效支撑。同时,光热发电产业链长,规模化开 发利用将成为我国新能源产业新的增长点。为更好适应新能源高质量发展需求,助力加快构建新型电力 系统,现就促进光热发电规模化发展提出以下意见。 一、总体目标 到2030年,光热发电总装机规模力争达到1500万千瓦左右,度电成本与煤电基本相当;技术实现国际领 先并完全自主可控,行业实现自主市场化、产业化发展,成为新能源领域具有国际竞争优势的新产业。 原文如下: 国家发展改革委 国家能源局关于促进 光热发电规模化发 ...
成都市新筑路桥机械股份有限公司 关于签订框架合作协议暨关联交易并投资设立项目公司的公告
Sou Hu Cai Jing· 2025-12-23 02:23
Summary of Key Points Core Viewpoint - The framework cooperation agreement between Tibet Hongda Duolong Mining Co., Ltd. and Chengdu Xinzhu Road and Bridge Machinery Co., Ltd. aims to establish a comprehensive energy security project for the Duolong Copper Mine, addressing the energy supply challenges due to weak grid infrastructure in the region [2][3][4]. Group 1: Agreement Overview - The agreement is a framework arrangement that requires further negotiation for specific cooperation details, which will be formalized in a subsequent agreement [2][3]. - The Duolong Copper Mine is one of China's few undeveloped large-scale copper-gold mines, located in Tibet, and is currently in the process of obtaining mining rights [3][4]. - The project is planned to be executed in three phases: temporary power supply for the copper mine's camp, permanent power supply for the living base, and power supply for the mining and selection operations [3][6]. Group 2: Project Details - The project will be led by Chengdu Xinzhu, which will handle investment, construction, and operation, while also securing necessary energy indicators and land use permits [6][7]. - A new project company will be established in the Ali region to ensure stable energy supply for the Duolong Copper Mine throughout its development and operational phases [6][11]. - The agreement allows for future collaboration on additional projects or energy demand expansions, prioritizing Chengdu Xinzhu as a partner [8]. Group 3: Financial and Operational Impact - The establishment of the project company will involve an investment of 50 million yuan, with no immediate significant impact on the company's current financial status [11][12]. - The collaboration is expected to leverage the unique advantages of the controlling shareholder, Shudao Group, in mineral resources and the company's experience in clean energy projects [12]. - The project aims to create a synergistic development model combining new energy and mining operations, enhancing the company's market presence in high-altitude renewable energy projects [12].
国家发改委、国家能源局发布重要发展意见!
中国能源报· 2025-12-23 02:13
12月2 3日,国家发改委、国家能源局联合发布的《关于促进光热发电规模化发展的若干意见》提出总体目标:积极推进光热发电项 目建设,不断拓展光热发电开发利用新场景,保障光热发电规模化发展。到20 30年,光热发电总装机规模力争达到15 00万千瓦左 右,度电成本与煤电基本相当;技术实现国际领先并完全自主可控,行业实现自主市场化、产业化发展,成为新能源领域具有国际竞 争优势的新产业。 以下为原文 国家发展改革委 国家能源局关于促进 光热发电规模化发展的若干意见 发改能源〔20 25〕1 64 5号 河北省、内蒙古自治区、吉林省、四川省、西藏自治区、甘肃省、青海省、宁夏回族自治区、新疆维吾尔自治区发展改革委、能源 局,国家能源局有关派出机构,有关电力企业: 光热发电兼具调峰电源和长时储能的双重功能,能够实现用新能源调节支撑新能源,能够为电力系统提供长周期调峰能力和转动惯 量,具备在部分区域作为调峰和基础性电源的潜力,是实现新能源安全可靠替代传统能源的有效手段,是加快构建新型电力系统的有 效支撑。同时,光热发电产业链长,规模化开发利用将成为我国新能源产业新的增长点。为更好适应新能源高质量发展需求,助力加 快构建新型电 ...
双杰电气:公司积极探索拓展氢醇、数据中心等高载能产业
Zheng Quan Ri Bao Zhi Sheng· 2025-12-22 09:39
(编辑 任世碧) 证券日报网讯 12月22日,双杰电气在互动平台回答投资者提问时表示,公司将源网荷储一体化项目列 为新能源领域的核心战略方向之一,未来将持续加大投入与拓展力度。在负荷侧布局上,公司在现有项 目基础上,积极探索拓展氢醇、数据中心等高载能产业。未来,公司旨在通过一体化模式,实现清洁能 源高效利用,赋能高载能产业绿色发展,为未来收入增长注入动力。 ...
双杰电气:公司源网荷储一体化项目正在按计划推进
Zheng Quan Ri Bao Wang· 2025-12-22 08:42
Core Viewpoint - The company, Shuangjie Electric (300444), has successfully won bids for public tender projects related to distribution network equipment from both the State Grid Shanxi Electric Power Company and the Southern Power Grid this year, indicating a strong position in the market [1] Group 1 - The company plans to execute the corresponding orders in an orderly manner based on the successful bids [1] - The company's integrated source-grid-load-storage project officially broke ground in October this year, with a planned capacity of 400,000 kilowatts of wind power and supporting energy storage [1] - This project aims to provide stable and clean power supply for the high-carbon ferrochrome project on the load side, achieving coordinated operation of source, grid, load, and storage [1] - The project is currently progressing according to plan [1]
20亿元!欣旺达拟在江西高安建设移动储能车整车生产线等项目
鑫椤锂电· 2025-12-22 00:43
Group 1 - The core viewpoint of the article highlights the collaboration between the government of Gao'an City, Jiangxi Province, and XINWANDA, which involves an investment of 2 billion yuan to establish various projects related to mobile energy storage vehicles, heavy trucks, and zero-carbon city construction [1] - XINWANDA, founded in 1997 and listed on the Shenzhen Stock Exchange in 2011, is a leading global lithium-ion battery manufacturer with nearly 30 years of experience in the fields of 3C consumer batteries, power batteries, energy technology, and smart hardware [1] - The company has established eleven manufacturing bases globally, located in various regions including Guangdong, Jiangsu, Shandong, Sichuan, Hubei, Zhejiang, Hungary, Morocco, and Thailand [1] Group 2 - The article mentions the availability of various research reports on the energy storage battery industry, including trends and competitive strategies for the global energy storage market from 2025 to 2029 [1]
20亿元!欣旺达拟在江西高安建设移动储能车整车生产线等项目
起点锂电· 2025-12-21 06:15
Group 1 - The core viewpoint of the article highlights the collaboration between the government of Gao'an City, Jiangxi Province, and XINWANDA, which involves an investment of 2 billion yuan to establish various projects related to mobile energy storage vehicles, heavy-duty trucks, energy storage PACK manufacturing, charging and swapping station equipment, and zero-carbon city construction [2] Group 2 - The article mentions advancements in energy storage technology, including next-generation battery cell technology aimed at high capacity, efficiency, and long cycle life by Rongjie Energy [3] - It discusses the definition of new standards for mass production of all-solid-state batteries by XianDao Intelligent [3] - The article also covers the proactive safety measures redefining energy safety paradigms through real-time perception and intelligent response technology solutions by Desay Battery [3] - Additionally, it references the demand for energy storage batteries in AI-era green data centers as discussed by Qingtai Cloud Energy [3] Group 3 - The article outlines the annual plan for Qidian Lithium Battery and Solid-State Battery, including a nationwide tour, technical forums, and award ceremonies scheduled throughout 2026 [6][7]
“读懂内蒙古”年会︱电亮内蒙古 能创“十五五”——内蒙古电力集团助力自治区高质量发展圆桌分享会举办
Xin Hua Cai Jing· 2025-12-17 17:36
12月17日下午,"电亮内蒙古能创'十五五'——内蒙古电力集团助力自治区高质量发展圆桌分享会"在内 蒙古呼和浩特市成功举办。本次圆桌分享会作为2025"读懂内蒙古"年会配套活动之一,旨在总结内蒙古 电力集团"十四五"发展成就,共商"十五五"高质量发展新路径,为内蒙古现代化建设贡献电网力量。 内蒙古电力集团党委宣传部(党委统战部)部长杜旻昊在致辞中表示,集团正锚定建设世界一流现代化 能源服务企业目标,牢固树立使命担当、主动服务、实干快干"三个理念",充分发挥自治区能源产业和 国资国企的主力军作用,在加快构建新型电力系统、服务能源保供大局、优化用电营商环境、促进地方 经济社会发展方面持续发力。 来自内蒙古电力集团计划发展部、企业管理部、生产技术部等相关负责人,以及内蒙古电力集团包头供 电公司、鄂尔多斯供电公司、乌兰察布供电公司等相关负责人围绕"'十四五'收官成就与'十五五'开局思 路"这一主线,从顶层设计与落地实践两个维度,展开深入的交流与分享。 分享中提到一系列扎实成就,成为内蒙古电力集团"十四五"砥砺奋进的生动注脚:累计纳规500千伏主 网架工程135项,累计完成投资1359亿元,提前一年建成"四横五纵"50 ...
黄土高原能源基地到“数字高地”的新变革
Zhong Guo Xin Wen Wang· 2025-12-16 08:38
Core Viewpoint - The "East Data West Calculation" equipment manufacturing project by Yishite in Huancounty, Gansu Province, represents a significant investment initiative aimed at integrating urban and rural industrial development, leveraging local renewable energy resources, and transitioning from traditional resource-based industries to high-end manufacturing within a year of its implementation [1][3][8]. Group 1: Project Overview - The Yishite project has filled a gap in the digital equipment manufacturing sector in Huancounty and created over 200 jobs, primarily for local unemployed university graduates [3]. - The project has achieved a production value of 596 million yuan, with a focus on UPS power supplies, charging piles, and energy storage products [3][6]. - The project is part of a broader transformation in Huancounty, shifting from traditional resource extraction to high-end manufacturing, supported by local wind and solar energy advantages [3][7]. Group 2: Renewable Energy Integration - The Gansu Electric Power's green electricity aggregation pilot project is constructing an integrated system to supply renewable energy directly to the data center, expected to meet about 55% of its electricity needs [6][7]. - The project includes the installation of 56 wind turbines and a significant number of solar piles, with projected annual electricity generation of 1.53 billion kWh from wind and 460 million kWh from solar [6]. - The region has a total renewable energy resource potential of 16.35 million kW, with a planned development scale of 13.94 million kW, leading the province in renewable energy development [7]. Group 3: Economic Impact - The industrial transformation has resulted in a 7.1% year-on-year increase in industrial added value, with the output of strategic emerging industries accounting for 6.6% of the industrial total [8]. - The industrial economy's contribution to GDP remains above 50%, highlighting its stabilizing role in the local economy [8]. - The completion of the 750 kV transmission project in 2024 will enhance the capacity for large-scale renewable energy transmission, further supporting the region's industrial growth [8].
南网科技推出“慧享”园区储能协同运营方案
Xin Hua She· 2025-12-16 03:01
南网科技公司以浙江海盐某园区为示范,推出慧享园区储能协同运营方案,构建源网荷储一体化智能微 网体系。方案集成风光储充自治微电网等技术,建设7.15MW风力发电、5.03MWp光伏发电、 5MW/10MWh储能示范站等设施,应用日前-日内实时滚动模型调度,以经济绿色、高效消 ...[查看原文] ...