Workflow
交通建设
icon
Search documents
苏州主城区与张家港再添一条快速路
Su Zhou Ri Bao· 2025-08-08 00:41
Core Points - The opening of the Dong Er Huan elevated road in Zhangjiagang significantly enhances north-south traffic efficiency in the city and provides a more convenient and efficient connection between Zhangjiagang and Suzhou [1][2] - The elevated road features a signal-free design, allowing for efficient and continuous vehicle flow, thus reducing delays caused by intersections [1] - The traffic volume at the intersection of Dong Er Huan and Su Yu Zhang Road is expected to increase following the road's opening, with additional routes being made available for public convenience [1] Summary by Sections - **Infrastructure Development** - The Dong Er Huan elevated road serves as the central axis of Zhangjiagang's "T" shaped urban expressway network [1] - It connects the northern and southern parts of the city, improving overall traffic conditions [2] - **Traffic Management** - The elevated road allows vehicles to enter and exit at designated ramps, facilitating smoother transit between key areas [1] - The road's design aims to alleviate congestion typically experienced on surface streets [1] - **Regional Connectivity** - The road links the Jin Feng section and the Su Yu Zhang highway, enhancing rapid transit between Zhangjiagang and Suzhou [2] - The project is crucial for improving road service levels and completing the regional expressway network [2]
45家ESG实践企业分享经验与成果 百名政企研代表共探企业可持续发展新路径
Chang Jiang Ri Bao· 2025-08-05 00:34
Core Viewpoint - The first "Excellent Cases of ESG Practices by Enterprises in the Yangtze River Economic Belt" conference highlighted the importance of ESG (Environmental, Social, and Governance) as a key evaluation system for sustainable development, emphasizing its role in reshaping corporate value and driving industrial transformation [3][4]. Group 1: ESG Policy and Development - Recent years have seen a surge in ESG policies in China, with the Shanghai and Shenzhen Stock Exchanges set to enforce mandatory disclosure of sustainability reports starting April 2024, prioritizing climate change responses [3]. - The Ministry of Finance has integrated climate-related content into its guidelines, aligning with the national "dual carbon" goals [3]. - The State-owned Assets Supervision and Administration Commission has issued guidelines for central enterprises to fulfill social responsibilities, with local state-owned asset management offices also releasing related opinions [3]. Group 2: Corporate Participation and Innovation - Enterprises along the Yangtze River Economic Belt are accelerating their transformation towards a green economy, becoming a key battleground for ecological priority and green development in China [3]. - A diverse group of nearly 100 representatives from central and local state-owned enterprises, as well as large private companies, gathered to discuss innovative approaches to sustainable development and the integration of ESG principles [4]. - The conference featured 45 companies recognized for their outstanding ESG practices in 2024, showcasing their innovative measures through video presentations [5].
新疆交建: 第四届董事会第十九次临时会议决议公告
Zheng Quan Zhi Xing· 2025-08-04 16:22
债券代码:128132 债券简称:交建转债 证券代码:002941 证券简称:新疆交建 公告编号:2025-045 新疆交通建设集团股份有限公司 本公司及董事会全体成员保证信息披露内容的真实、准确和完整,没有虚假记 载、误导性陈述或重大遗漏。 一、 董事会会议召开情况 "本公司")于 2025 年 新疆交通建设集团股份有限公司(以下简称"公司"、 具体内容详见巨潮资讯网(http://www.cninfo.com.cn)《关于关联方对全资 子公司增资暨公司放弃优先认缴出资权的关联交易的公告》。 三、备查文件 特此公告。 (一)审议并通过《关于关联方对全资子公司增资暨公司放弃优先认缴出 资权的关联交易的议案》 为满足新疆绿电交通产业科技有限公司(以下简称:绿电交通公司)运营的 资金需求,增强其资本实力,拟增资扩股引入公司控股股东新疆交通投资(集团) 有限责任公司对绿电交通公司进行增资,合计增资人民币 4,305.76 万元,其中 公司资本公积。公司放弃本次优先认缴出资权。本次增资完成后,绿电交通公司 的注册资本由 4,008.00 万元变为 8,179.59 万元,公司对绿电交通公司的持股比 例将由 100.0 ...
中国交通建设:截至7月末暂未回购A股股份
Zhi Tong Cai Jing· 2025-08-01 09:07
Core Viewpoint - China Communications Construction Company (01800) announced that as of July 31, 2025, the company has not yet repurchased any A-shares [1] Summary by Category - **Company Announcement** - The company has released an announcement regarding the repurchase of its A-shares [1] - As of the specified date, no shares have been repurchased [1]
北京市灾后将推动哪些重大项目建设?
Core Points - Beijing aims to accelerate post-disaster recovery and reconstruction, with a goal of "basic recovery in one year, comprehensive improvement in three years, and long-term high-quality development" [1][3] - A series of major projects will be planned to enhance water conservancy facilities, road and bridge construction, and improve forecasting and warning capabilities [1][4] Group 1: Recovery and Reconstruction Efforts - The city will mobilize local party members, cadres, and the public to actively participate in disaster relief and recovery efforts [2] - Key initiatives include ensuring the living conditions of affected residents, repairing damaged infrastructure, and maintaining flood prevention measures during critical periods [2][3] - The focus will be on restoring normal production and living conditions, providing policy support for affected businesses, and expediting insurance claims processes [2][4] Group 2: Major Projects and Infrastructure Improvements - Planned projects will include upgrading water conservancy facilities and assessing the current state of reservoirs, channels, and flood defenses to enhance overall flood protection capabilities [4][5] - There will be an emphasis on improving forecasting and warning systems, optimizing meteorological monitoring, and enhancing public access to warning information [4][5] - The construction of dual-use public infrastructure will be prioritized to meet both everyday needs and emergency response requirements [5]
全国第二 上半年四川省交通建设投资完成1349亿元
Group 1 - Sichuan Province has implemented various actions to enhance transportation infrastructure, achieving a total investment of 134.9 billion yuan in road and waterway construction in the first half of the year, ranking second in the country [1] - The Chengyu Expressway expansion project, a key initiative, is progressing with 72% of the lower structure completed, aiming for overall completion by the end of 2026 [1] - The G5 Jingkun Expressway expansion project is also advancing, utilizing 3D printing technology for road surface construction, improving efficiency by 20% and maintaining surface flatness within 3 mm [1][2] Group 2 - The Guangming Expressway expansion project spans 123.98 kilometers with a total investment of 29.19 billion yuan, and is expected to significantly reduce travel time from 2 hours to 70 minutes upon completion [2] - The Minjiang Port and Hydropower Comprehensive Development Project, with an investment of approximately 55 billion yuan, is progressing well, having completed 76,000 cubic meters of excavation for the ship lock project [2] - Sichuan Province aims to complete a total of 2.68 billion yuan in road and waterway construction investments by the end of the year, with a target of 2.8 billion yuan [3]
宁夏深化东西部科技合作 助力交通运输、文化旅游等产业高质量发展
Zheng Quan Ri Bao Wang· 2025-07-31 14:13
会上发布了包括公路轻量化智能巡检技术转化应用、高速公路交通智能诊断及应急救援系统、绿色低碳 道路预防养护超薄罩面(1cm免铣刨)成套技术、面向高密度无人机的智能边缘管控技术在内的10项最新 科技成果,并进行了路演推介。 同济大学与宁夏交通建设投资集团有限公司、宁夏旅游投资集团有限公司等多家公司签约,推动同济大 学先进科技成果与宁夏在综合交通、城市更新、人工智能、低空经济等领域的需求精准对接,助力宁夏 交通运输、文化旅游等产业高质量发展。 本报讯(记者李立平)7月31日,由宁夏回族自治区公路学会、宁夏低空经济产业协会联合主办的"宁夏东 西部科技合作—同济大学科技成果转移转化对接交流会"在银川召开。 ...
新疆交建: 2025年第一次临时股东会决议公告
Zheng Quan Zhi Xing· 2025-07-30 16:25
Meeting Overview - The shareholder meeting of Xinjiang Communications Construction Group Co., Ltd. was held on July 30, 2025, at 15:00 Beijing time, with both on-site and online voting options available [1][2] - A total of 335 representatives attended the meeting, representing 343,089,897 shares, which is 53.1443% of the total voting shares [1][2] Voting Results - The proposal to amend the company's articles of association and adjust internal supervisory institutions was approved with 342,624,844 votes in favor, accounting for 99.9943% of the valid votes cast [2][3] - Among small investors, 3,762,454 shares were voted in favor, representing 88.9994% of their valid voting shares [3] - The proposal to revise and establish certain governance systems was also approved, with 340,306,244 votes in favor, which is 99.9858% of the valid votes [3][4] Legal Compliance - The meeting was witnessed by lawyers from Guohao Law Firm (Urumqi), who confirmed that the meeting's procedures, participant qualifications, voting methods, and results complied with relevant laws and regulations [6][7]
完成投资477亿元,济南上半年交通投资领跑全省
Qi Lu Wan Bao Wang· 2025-07-29 10:42
Core Insights - Jinan's transportation sector has achieved significant investment milestones in the first half of the year, completing 477 billion yuan, which is 173% of the planned investment for the period and 73% of the annual target of 650 billion yuan [1][3]. Investment Breakdown - Railway projects have seen an investment of 36 billion yuan, while highway projects received 57 billion yuan. Airport projects accounted for 54 billion yuan, urban roads 122 billion yuan, and rail transit projects 202 billion yuan, with hub stations and other projects receiving 7 billion yuan [1]. - Provincial-level projects completed investments of 89.3 billion yuan, city-level projects 359.8 billion yuan, and district/county-level projects 28.1 billion yuan [3]. Project Progress - The construction of the Jinan comprehensive three-dimensional transportation network is accelerating, with significant progress in railway projects such as the Jizhong High-speed Railway and Jizhao High-speed Railway [5]. - In highway developments, the expansion of the Jing-Tai Expressway and the completion of the Gaoqing to Shanghe Expressway segment have been highlighted, along with the initiation of land acquisition for the G308 bottleneck section [6]. - Airport infrastructure is also advancing, with the second phase of Jinan Airport's expansion speeding up, including the T2 terminal and other related projects [6]. Urban and Rail Transit Developments - Urban road projects are progressing well, with the Industrial North Road extension and several cross-river tunnels under construction [8]. - Rail transit projects are also on track, with the first phase of Line 4 achieving structural completion and entering the testing phase, while construction on Lines 6, 7, 8, and 9 is ongoing [8].
交通重点工程稳步推进:建设者高温下坚守岗位 确保工程进展顺利
Yang Shi Wang· 2025-07-26 09:04
Core Viewpoint - The Ningbo-Taizhou-Wenzhou expansion project is a key transportation infrastructure initiative in Zhejiang, facing challenges due to high temperatures during construction, but efforts are being made to ensure progress and worker safety [1][9]. Group 1: Project Overview - The Ningbo-Taizhou-Wenzhou expansion project spans 42.8 kilometers, starting from the Maliaoling Tunnel at the boundary of Ningbo and Taizhou, and ending at the Linhai South Interchange in Taizhou [9]. - This project is part of Zhejiang's "14th Five-Year Plan" for transportation, aimed at enhancing the traffic capacity of the Zhejiang East Highway and integrating Taizhou into the Yangtze River Delta [9]. Group 2: Construction Conditions - Over 3,000 construction workers are currently on-site, with some engaged in asphalt paving, which is optimal in high-temperature conditions to ensure proper compaction and durability of the road surface [3]. - The construction environment varies, with the 3.6-kilometer-long Lingqing Tunnel presenting a humid and hot challenge, where workers must adhere to strict hourly rest schedules to manage heat stress [5]. Group 3: Safety Measures - The project management has implemented measures to mitigate heat stress, including adjusting work hours to avoid the hottest part of the day and using ice machines and fans in work areas [7]. - Safety training and the provision of heat-relief supplies, such as cooling drinks and medications, are part of the efforts to ensure worker safety during extreme weather conditions [9].