Workflow
BHP(BHP)
icon
Search documents
必和必拓截至6月底财年铜产量超过200万吨,创下纪录高位
Wen Hua Cai Jing· 2025-07-18 09:57
Group 1 - BHP Group reported record high production of iron ore and copper for the fiscal year, demonstrating the company's operational strength and resilience amid global uncertainties [1][2] - The company produced over 2 million tons of copper, with significant contributions from the Escondida copper mine in Chile, which reached its highest output in 17 years [1][2] - BHP's total copper production for the fiscal year was 2.0167 million tons, an 8% increase from the previous fiscal year's 1.865 million tons [2][3] Group 2 - The demand for global commodities remains resilient, driven by renewable energy investments, grid construction, strong machinery exports, and electric vehicle sales [2] - Despite potential economic slowdowns and trade tensions, stimulus measures from China and the U.S. are expected to mitigate short-term impacts on demand [2] - BHP's fourth-quarter copper production was 516,200 tons, up from 510,800 tons in the previous quarter and 2.25% higher than the same quarter last year [2][3]
必和必拓(BHP.US)钾肥项目成本激增恐成“绊脚石”,全年铁矿石和铜产量创历史新高
智通财经网· 2025-07-18 02:31
Core Viewpoint - BHP's fourth-quarter and annual operational report indicates rising costs and delays in its Canadian potash project, while iron ore and copper production have slightly increased, reaching historical highs [1][2]. Group 1: Potash Project - BHP has invested heavily in the potash sector, completing 68% of the Jansen project phase one, with estimated costs rising from $5.7 billion to between $7 billion and $7.4 billion [1]. - Potential oversupply in the market may delay the phase two execution of the Jansen project by two years [1]. - The company is considering extending the execution timeline for phase two of the Jansen project as part of its regular review of capital projects [1]. Group 2: Iron Ore Production - In the fourth quarter, BHP's iron ore production reached 70.3 million tons, bringing the fiscal year 2025 iron ore production to 263 million tons, close to the upper limit of its guidance range [1]. - The fiscal year 2024 iron ore production is projected at 260 million tons, reflecting a growth rate of 1% [1]. - BHP's Western Australia iron ore operations set multiple records, including annual production [1]. Group 3: Copper Production - BHP's copper production increased by 2% in the fourth quarter, with the Escondida project in Chile achieving its highest annual output in 17 years [2]. - Total annual copper production exceeded 2 million tons, marking an 8% year-on-year increase and setting a new record [2]. - The CEO highlighted the resilience of global commodity demand since 2025, despite challenges in the market [2].
【期货热点追踪】必和必拓2025财年铜产量创新高,首次突破200万吨,却预警明年下降,市场供需预期生变?
news flash· 2025-07-18 00:41
Group 1 - BHP's copper production is expected to reach a record high of over 2 million tons in the fiscal year 2025, marking a significant milestone for the company [1] - Despite the anticipated record production, BHP has issued a warning about a potential decline in copper output for the following year, indicating a shift in market supply and demand expectations [1]
X @Bloomberg
Bloomberg· 2025-07-17 23:09
Production Performance - BHP Group's iron ore output, a key revenue driver, increased by 2% compared to the previous year's quarter [1]
必和必拓:上调加拿大Jansen Potash第一阶段项目资本开支预期至70亿-74亿美元,公司最初预计57亿美元。预计Jansen第一阶段项目将于2027财年中期投产。预计全年资本开支和勘探开销大约为110亿美元。
news flash· 2025-07-17 23:00
Group 1 - Company BHP has raised the capital expenditure expectation for the first phase of the Jansen Potash project in Canada to $7-7.4 billion, up from the initial estimate of $5.7 billion [1] - The Jansen first phase project is expected to commence production in the mid-2027 fiscal year [1] - The company anticipates total capital and exploration expenditures of approximately $11 billion for the year [1]
必和必拓:预计2026财年埃斯孔迪达铜矿的铜产量将在115至125万吨之间;预计四季度铜产量为51.62万吨,同比增长2%。预计四季度能源煤炭产量为410万吨,同比增长8%。
news flash· 2025-07-17 22:49
Group 1 - The company expects copper production at the Escondida mine to be between 1.15 million and 1.25 million tons for the fiscal year 2026 [1] - The company anticipates copper production for the fourth quarter to be 516,200 tons, representing a year-on-year increase of 2% [1] - The company projects energy coal production for the fourth quarter to be 4.1 million tons, reflecting a year-on-year increase of 8% [1]
必和必拓:2025财年铜产量达202万吨,同比增长8%,铁矿石产量为2.63亿吨,同比增长1%。
news flash· 2025-07-17 22:49
必和必拓:2025财年铜产量达202万吨,同比增长8%,铁矿石产量为2.63亿吨,同比增长1%。 ...
必和必拓:预计2026财年铁矿石产量(以WAIO100%为基准)为2.84至2.96亿吨;预计2026财年的铜产量为180至200万吨。
news flash· 2025-07-17 22:49
Core Viewpoint - The company BHP expects its iron ore production for the fiscal year 2026 to be between 284 million tons and 296 million tons, based on 100% WAIO [1] - The company also anticipates its copper production for the fiscal year 2026 to be between 1.8 million tons and 2 million tons [1] Group 1 - BHP's projected iron ore production for FY2026 is between 284 million tons and 296 million tons [1] - BHP's projected copper production for FY2026 is between 1.8 million tons and 2 million tons [1]
7月18日电,必和必拓集团第四季度可归属矿石产出7034万吨,预计全年可归属矿石产出2.6亿至2.7亿吨;必和必拓集团第四季度铜产量516200吨,预计全年铜产量180万至200万吨,此前预计185万至205万吨。
news flash· 2025-07-17 22:48
Group 1 - BHP Group's fourth quarter attributable iron ore production reached 70.34 million tons, with an expected annual attributable iron ore production of 260 million to 270 million tons [1] - The copper production for the fourth quarter was 516,200 tons, with an expected annual copper production of 1.8 million to 2 million tons, revised from a previous estimate of 1.85 million to 2.05 million tons [1]
必和必拓第四财季铜产量51.62万吨。第四财季可归属的铁矿石产量7034万吨。预计全年可归属的铁矿石产量2.58亿-2.69亿吨。预计全年总体西澳洲铁矿石产量2.84亿-2.96亿吨。
news flash· 2025-07-17 22:43
Group 1 - The copper production for BHP in the fourth quarter reached 516,200 tons [1] - The attributable iron ore production for the fourth quarter was 70.34 million tons [1] - The company expects the total attributable iron ore production for the year to be between 258 million and 269 million tons [1] Group 2 - The overall iron ore production in Western Australia is projected to be between 284 million and 296 million tons for the year [1]