Workflow
BIM技术
icon
Search documents
烟台城市快速路“五一”攻坚加速推进
Qi Lu Wan Bao· 2025-04-29 21:14
Core Insights - The Yantai Urban Expressway project, undertaken by China Railway Construction Engineering Group, is a key livelihood project for Yantai City, with over 300 workers actively engaged in construction during the May Day holiday [2][3] - The overall cost of the project is approximately 1.131 billion yuan, facing challenges such as significant land acquisition and relocation, as well as high traffic volumes in construction areas [2] - Advanced technologies such as BIM and intelligent traffic monitoring systems are being utilized to optimize management and minimize traffic disruption during construction [2][3] Project Details - The construction of the Gongjiadao Interchange and Hongqi Road main line has entered a full construction phase, with a focus on overcoming traffic management difficulties [2] - The project employs factory prefabrication and precise on-site positioning for large-span steel beam installation, enhancing installation accuracy through laser positioning and dynamic stress monitoring [3] - A modular adjustable support system has been developed for cantilevered beams, utilizing automated tensioning equipment to control prestressing accurately [3] Future Impact - Upon completion, the project will facilitate a three-dimensional connection between major roads, significantly reducing commuting times in urban areas and enhancing the transportation network in the Jiaodong Peninsula [3]
霍普股份:创新引领绿色发展,多领域布局展现强劲实力
Quan Jing Wang· 2025-04-29 03:23
Core Insights - Hop Co., Ltd. reported a strong revenue of 139 million yuan for the year 2024, indicating robust growth momentum in the green building and renewable energy sectors [1] - The company is recognized as a leader in the industry, leveraging unique design concepts, superior technical capabilities, and extensive market presence to shape the future of green building and renewable energy [1] Business Performance - The company has maintained a leading position in traditional architectural design while demonstrating strong competitiveness in emerging fields such as green building and urban renewal [1] - By utilizing advanced technologies like BIM and smart construction, Hop Co., Ltd. provides efficient, environmentally friendly, and intelligent architectural design solutions, earning widespread acclaim in the industry [1] Renewable Energy Sector - In the renewable energy sector, Hop Co., Ltd. is accelerating its development in distributed photovoltaic and commercial energy storage businesses [1] - The company has achieved refined operations through technological and model innovations, significantly enhancing energy utilization efficiency and creating substantial economic and environmental benefits for clients [1] Research and Development - The company has increased its investment in technology research and development, establishing a comprehensive R&D system and assembling a high-quality research team to drive innovation and product upgrades [2] - These efforts have not only strengthened the company's core competitiveness but also provided strong momentum for its sustained rapid development [2] Market Expansion - Hop Co., Ltd. is continuously expanding its business boundaries and increasing market share through its full industry chain layout in the renewable energy sector, R&D investments, innovative business models, and successful project implementations [2]
地产观潮|建造“好房子”被多地政府列入年度工作重点
证券时报· 2025-02-26 14:46
近日,北京市"好房子"的新标准《北京市平原多点地区"好房子"规划管理相关技术要点(试行)》出台。具体来看,技术要点涉及阳台、架空层、风雨连廊、共享 公共空间、跨城市支路空间利用、建筑高度、建筑立面品质等,广东则明确,要发展绿色建筑,推广智能建造、模块化建筑、装配式建筑等,引导企业提高住房建 设标准、优化物业服务,建设更多好房子、好小区、好社区、好城区。 另据不完全统计,自去年以来已有超30个城市发布新版城市规划管理技术规定,例如《深圳市建筑设计规则》优化了绿化覆盖率、建筑覆盖率等计算方式,杭州市 《关于优化建设项目容积率及相关指标计算规则的通知》则规定,利用城市公共空间并向公众开放的公共连廊,不纳入容积率计算等。"好房子"时代正式拉开帷 幕。 (新房主打高赠送 吴家明/摄) "回顾2024年,很多满足改善性住房需求的'好房子'项目取得了亮眼的销售成绩。"广东省住房政策研究中心首席研究员李宇嘉说,这表明房地产市场结构性需求潜 力比较大,需要通过加强"好房子"建设来发掘。 新的一年,建造"好房子"被多地政府列入年度工作重点,购房者对此也非常期待。 不过,一些开发商在提高住房得房率的同时,却将一些公共配套缩水。另一 ...