Workflow
Zhong Guo Min Hang Wang
icon
Search documents
西南民航:开创西南民航“十五五”高质量发展新局面
Core Viewpoint - The 2026 Southwest Civil Aviation Work Conference emphasized the importance of high-quality development in the Southwest civil aviation sector, building on the achievements of the 14th Five-Year Plan and setting the stage for the 15th Five-Year Plan [2][3][5]. Summary by Sections 2025 Achievements - The Southwest civil aviation sector completed its planning tasks for 2025, achieving a passenger throughput of 266 million and a cargo and mail throughput of 2.423 million tons, representing year-on-year growth of 3.5% and 13.1% respectively, with international passenger throughput increasing by 41% [3][4]. - The safety situation remained stable, with the transportation aviation accident rate decreasing by 3.66% [3]. - Major infrastructure projects, including the completion of Chongqing Airport's T3B terminal and Dejiang Airport, saw a total investment of 14.2 billion yuan [3]. 2026 Work Requirements - The conference outlined the overall work requirements for 2026, focusing on implementing the spirit of the 20th National Congress and the Central Economic Work Conference, while ensuring safety and promoting the strategic role of civil aviation [5][6]. - Emphasis was placed on balancing development and safety, enhancing foundational work, and addressing development imbalances [5]. Key Tasks for 2026 - Strengthening safety foundations to ensure high-quality development, with a focus on source governance and event management to prevent major accidents [6]. - Enhancing planning to support national strategic implementation, optimizing infrastructure, and fostering new growth engines such as low-altitude economy and domestic aircraft [6]. - Promoting effective market governance through strict administrative regulations and innovative supervision methods [6]. - Fostering collaborative development to address regional disparities and improve service quality [6]. - Investing in human resources to support high-quality development through workforce training and development [6]. - Deepening the integration of party leadership with business operations to ensure strong political support for development [6][7].
重庆江北机场开通重庆—布达佩斯全货机航线
Core Viewpoint - The launch of the Chongqing-Budapest all-cargo flight route marks a significant step in enhancing international logistics and trade connections between China and Europe, particularly benefiting local industries in Chongqing and Budapest [1][2][3] Group 1: Route Details - The Chongqing-Budapest all-cargo route is the third international and regional all-cargo route established by China Cargo Airlines in Chongqing, with a cargo capacity of 86 tons and a planned operation of three flights per week [1][2] - Budapest, as the first Central and Eastern European country to sign a government cooperation document under the Belt and Road Initiative with China, serves as a key logistics hub in Europe due to its strategic location [2] Group 2: Economic Impact - The new route is expected to enhance trade relations between Chongqing and Hungary, significantly improving the supply chain response time for Chongqing's key products such as new energy vehicle parts and laptops [3] - The establishment of this route will also support Budapest in enhancing its logistics distribution capabilities within Europe, facilitating deeper integration of the China-Europe industrial chain [3] Group 3: Future Developments - Chongqing Jiangbei Airport aims to continue expanding its international cargo flight network, targeting high-quality development as an international aviation logistics hub, with a focus on connecting Southeast Asia and Europe and North America [3] - Currently, Chongqing Jiangbei Airport operates 23 international (regional) cargo routes with a weekly flight volume of 77, gradually building a comprehensive international logistics corridor [3]
大雾来袭显担当 民航浙江空管分局高效保障杭州机场备降航班
Core Viewpoint - The article highlights the effective emergency response by the Zhejiang Air Traffic Control Bureau during severe fog conditions at Shanghai Pudong International Airport, which led to multiple flights being diverted to Hangzhou Xiaoshan International Airport [1][2]. Group 1: Emergency Response - On January 16, Shanghai Pudong International Airport experienced persistent dense fog, causing runway visibility to fall below operational standards, resulting in several flights being diverted to Hangzhou Xiaoshan International Airport [1]. - The Zhejiang Air Traffic Control Bureau activated emergency plans for special weather and large-scale flight diversions, prioritizing safety and coordination to ensure smooth passenger travel [1]. Group 2: Coordination and Efficiency - Upon receiving information about the diversions, the air traffic control teams quickly entered an emergency support state, collaborating with meteorological departments to monitor weather conditions and optimize airspace resource allocation for the diverted flights [1][2]. - The air traffic controllers enhanced real-time communication with various units, ensuring seamless coordination for ground operations, passenger services, and the management of diverted flights [1][2]. Group 3: Dual Operations - The Hangzhou airport's south runway was prepared for calibration work while simultaneously managing the influx of diverted flights, showcasing the ability to handle dual operations effectively [2]. - The air traffic controllers improved operational efficiency by optimizing taxi routes and streamlining control instructions, thereby minimizing airborne waiting times for flights [2]. Group 4: Future Improvements - The Zhejiang Air Traffic Control Bureau plans to summarize the experiences gained from this event to enhance multi-tasking support plans and improve control capabilities under complex operational conditions [2].
济南机场开通三条东南亚新航线
Core Viewpoint - The opening of three direct flights from Jinan Airport to Southeast Asia enhances trade, cultural, and tourism exchanges between Shandong and the region, injecting new momentum into the city's openness [1] Group 1: New Flight Routes - Three new direct international flight routes have been launched: Jinan-Hanoi, Jinan-Ho Chi Minh City, and Jinan-Kuala Lumpur, starting from January 15, 2023 [3] - The Jinan-Hanoi route operates daily, departing at 22:30 and arriving at 01:20 the next day [3] - The Jinan-Ho Chi Minh City route operates four times a week, with flights on Monday, Wednesday, Friday, and Sunday [3] - The Jinan-Kuala Lumpur route operates daily, departing at 20:25 and arriving at 03:05 the next day [3] Group 2: Economic and Tourism Impact - The new routes will significantly reduce time costs for business travel and cross-border logistics, facilitating better connections for Shandong's foreign trade enterprises and cross-border e-commerce with Southeast Asia [3] - The flights promote the development of new cross-border tourism routes, allowing travelers to easily access historical sites in Hanoi, urban landscapes in Ho Chi Minh City, and diverse attractions in Kuala Lumpur [3] Group 3: Operational Preparations - A launch event for the new routes was held on January 15, 2023, to enhance cooperation and promote the new flights [4] - Jinan Airport has coordinated with various agencies to ensure smooth operations, including optimizing customs processes and enhancing multi-language guidance for travelers [4] - The airport aims to deepen collaboration with airlines and tourism sectors to expand its international route network and promote integrated tourism products [4]
首都机场集团科技管理有限公司联合申报的国家重点研发计划项目获批
科技公司将以此次项目合作为契机,持续深化科技创新,以更优质的科技成果赋能民航高质量发展。 (编辑:李佳洹 校对:许浩存 审核:韩磊) 《中国民航报》、中国民航网 记者许晓泓 通讯员高云杨 报道:近日,首都机场集团科技管理有限公司 (以下简称"科技公司")联合重庆大学、哈尔滨工业大学、南京大学、山东大学、东南大学、广东省科 学院智能制造研究所、山东浪潮科学研究院等高校及科研院所,申报的国家重点研发计划"机场跑道智 能管养系统关键技术研究与示范应用"(项目编号:2025YFE0217000)入选国家重点研发计划并获得批 复。 跑道管养是保障机场安全高效运行的关键环节。本项目聚焦四大核心任务:跑道异常智能检测、多模态 融合的管养决策、系统自主学习与动态优化,以及全链路闭环的智能管养系统集成。通过攻克上述关键 技术,构建"云-边-端"协同的智能管养架构,实现跑道全域异常的精准识别、管养任务的自主决策与系 统能力的持续进化。此次技术革新将显著提升跑道道面管养效率与安全性,降低运营成本,推动跑道管 养向"数智与智能驱动"转型,推动高端智能装备的研制并推广使用,将为行业提供可复制、可推广的标 准化技术方案与智能化实践范式。 ...
首都机场安保公司开展岁末年初岗位技能提升专项行动
Group 1 - The core focus of the action is to enhance the core skills of personnel in the aircraft start-up positions, ensuring a solid foundation for air defense safety [1] - The company has initiated a comprehensive skills assessment for all employees in start-up positions, utilizing data from the past six months to identify weak areas such as "complex luggage image recognition" and "new prohibited item characteristics" [2] - A dual-track training model has been established, combining online learning through systems like "Smart Aviation Security" and "First Security Classroom" with offline practical training, ensuring all employees complete at least 10 hours of specialized study [2] Group 2 - The company plans to implement a continuous training system that incorporates skill enhancement for start-up positions, adjusting training content based on seasonal characteristics to ensure airport safety operations [2]
西双版纳嘎洒国际机场服务品牌“焕新”记:一场沪滇协作的“破圈”培训
Core Viewpoint - The research and training initiative at Xishuangbanna Gasa International Airport aims to enhance service brand development through expert insights and practical recommendations, focusing on integrating local culture and improving passenger experience [1][4]. Group 1: Research and Training Activities - A team of experts from various aviation institutions conducted a comprehensive study at Xishuangbanna Gasa International Airport, providing systematic and forward-looking external support for service brand development [1][4]. - The research involved various methods such as thematic reports, discussions, and on-site diagnostics to understand the current status and challenges of the airport's service brand [4]. Group 2: Key Focus Areas - The team focused on critical issues such as the integration of Dai culture, the creation of unique services, and addressing operational pressures [4]. - Utilizing the 6H professional analysis tool, the team proposed several actionable optimization suggestions based on passenger experience, covering aspects like service processes, visual identity, and emergency service capabilities [4]. Group 3: Outcomes and Future Plans - The research team acknowledged the achievements of the airport in service products like "Worry-free for Migratory Birds" and "Worry-free for Teams," while recommending enhancements in brand design and cultural expression [4][5]. - Xishuangbanna Gasa International Airport plans to incorporate the insights gained into its 2026 service work deployment, aiming to deepen the integration of service brands with Dai culture and improve the recognition and influence of its "Rainforest Airport, Worry-free Travel" brand [5].
优化营商环境再发力 大连机场以“关键小事”擦亮城市窗口
Core Viewpoint - Dalian Airport has implemented a series of service upgrades, including the construction of new restrooms, to enhance the experience for both passengers and drivers, reflecting a commitment to improving service quality and operational efficiency [3][5][14] Group 1: Service Quality Enhancements - The airport has opened three new restrooms in key areas, addressing the needs of ride-hailing and taxi drivers, thereby improving their waiting experience [3][5] - Dalian Airport is focused on creating the "cleanest airport" through meticulous management and the establishment of a grid-based sanitation system [5][14] - The airport aims to provide a "warm and efficient" environment by introducing various comfort measures, such as temperature control and anti-slip facilities [9][12] Group 2: Infrastructure Improvements - Plans are in place to add 800 new waiting seats and upgrade 864 charging ports by 2025 to alleviate seating shortages and enhance passenger convenience [7] - The airport is optimizing the layout of self-service check-in and waiting areas, as well as improving accessibility features [7][9] - A comprehensive upgrade of 36 restroom facilities is underway, focusing on both functionality and user experience [5][13] Group 3: Customer Satisfaction Initiatives - Dalian Airport has introduced a "fast response" complaint mechanism to ensure timely handling of passenger feedback, aiming for a 33% reduction in complaints by 2025 [12] - Special services for vulnerable groups, such as first-time flyers and the elderly, are being enhanced to ensure a supportive travel experience [11][12] - The airport is actively engaging in community events and seasonal activities to foster a welcoming atmosphere [12][14] Group 4: Operational Efficiency Goals - Starting November 18, 2025, the airport will shorten the flight cut-off time to 35 minutes, allowing for more efficient check-in and baggage handling [13] - Dalian Airport has achieved a flight release normal rate of 95.12% and a departure punctuality rate of 94.45%, ranking among the best in the country [13] - The airport is implementing detailed management practices to ensure that 95% of passengers complete check-in within 8 minutes and security checks within 12 minutes [13]
天府至双流无缝衔接,川航“中转无忧”解锁出行新体验
《中国民航报》、中国民航网 记者教欣铭 通讯员周小倩、张依婷、裴梦琦 报道:为深入推进成都"两 场一体"运营提质增效,持续优化中转旅客服务品质,近日,四川航空近日联合双流、天府机场以及顺 丰速运,共同推出天府至双流跨场中转行李免费代转运服务。 作为此次服务创新的核心举措,三方秉持"以人为本、协同高效"的合作理念,针对双流机场国内航班与 天府机场国际航班的中转衔接场景,制定了便捷化的服务保障方案。根据方案明确,旅客在购买符合时 间衔接标准的双流国内段与天府国际段航班机票后,即可享受免费的行李代转运服务,无需自行携带行 李,真正实现"轻松中转"。 在具体服务流程上,两场转运方向均建立了标准化保障体系,双流至天府方向,旅客若乘坐计划落地时 间早于17时双流国内航班,衔接计划起飞时间晚于23时的天府国际航班,可在双流T1到达层顺丰服务 柜台办理行李转运。天府至双流方向:旅客若乘坐计划落地早于7时的天府国际航班,衔接计划起飞时 间晚于13时的双流国内航班,可在天府T1国际到达顺丰丰巢柜办理行李转运。 旅客操作仅分"存包""寄件"两步,轻松搞定行李转运,旅途更便捷。以旅客在天府到达为例:旅客只需 先到天府机场到达层A1出 ...
冰雪赋空港 骐骥骋新程——长春机场冰雕亮化工程点亮冰雪文化新图景
(本文图片均由吉林机场提供) 飞翼造型彩灯以"骐骥展翅"为设计灵感,结合道路两侧的灯笼、雪花灯、烟花灯等灯光矩阵,构建出一 条流光溢彩的迎宾长廊,热情迎送每一位出行旅客,皆能感受这份独属于冬日里的空港温情。飞翼造型 不仅契合马年生肖主题,更表达着长春龙嘉国际机场将以"行万里"的担当服务区域发展,助力吉林省 在"十五五"新征程中蹄疾步稳、驰骋致远。 进场路上,通过吉祥物与冰雪运动元素的动线布局实现功能与意象的深度融合。停车场区域的"跃龙门· 纳吉福"冰雕寓意旅客前程似锦,沿线"冰雪逐梦·畅滑长春"系列冰雕直接呼应"学滑雪到长春"文旅口 号,而金黄麦穗灯光则象征冰雪经济的丰收预期。这种沉浸式的冰雪体验成为吉林空港冰雪文化宣传 的"第一展厅"。 骐骥展翅行万里,冰雪献瑞启新篇。长春机场冰雕景观与亮化工程,不仅提升了吉林窗口的环境品质, 更以冰雪艺术为媒介,呈现了"春运"以及节日氛围,为吉林省冰雪经济持续升温注入空港动能。(编 辑:李佳洹 校对:许浩存 审核:韩磊) 《中国民航报》、中国民航网 记者教欣铭 通讯员刘野 报道:近日,长春机场公共区冰雕与亮化工程全 面竣工。依托"冰雪金山"主题冰雕与"学滑雪到长春"灯光两 ...