CH ENERGY ENG(601868)
Search documents
曼恩斯特:子公司湖南安诚近期入围“中国能建2025年度磷酸铁锂电池储能系统集中采购项目”
Zheng Quan Ri Bao Zhi Sheng· 2025-09-26 08:09
Core Viewpoint - The company Mannesmann's subsidiary, Hunan Ancheng, has recently qualified for the "China Energy Construction 2025 Annual Lithium Iron Phosphate Battery Energy Storage System Centralized Procurement Project" in two segments, pending the receipt of the official bid notification [1] Group 1 - Hunan Ancheng has entered the procurement project, which indicates potential growth opportunities in the energy storage sector [1] - The company has not yet received the official notification of winning the bid, highlighting the uncertainty in the procurement process [1] - If the company successfully secures the contract and the order amount meets disclosure standards, it will comply with relevant disclosure obligations [1]
中国能建下属一公司领导班子调整
中国能源报· 2025-09-26 07:13
出品 | 中国能源报(c n e n e rg y) 编辑丨闫志强 来源: 中国能建中电工程 微信公众号 End 欢迎分享给你的朋友! 中国能建中电工程华东院领导班子调整。 9月25日,中国能建 中电工程 华东院 召开干部会议,宣布中国能建党委关于调整 华东 院 领导班子的决定。 中国能建党委组织部副部长、人力资源部副总经理王伟宣读了任职 文件:杜惠玲任华东院党委委员、纪委书记。 ...
中国能建安徽电建二公司中标合肥城建2025年拟建地块工程1标段总承包
Zhong Guo Jin Rong Xin Xi Wang· 2025-09-25 11:54
Core Viewpoint - China Energy Construction Anhui Electric Power Construction Company has won the bid for the general contracting of the first section of the Hefei Urban Construction 2025 planned land project, which is expected to enhance living conditions and urban development in the region [1] Project Details - The project is located at the intersection of North Second Ring Road and Tongling North Road in Hefei New Station High-tech Zone, adjacent to the subway Line 3 station [1] - The total construction area is approximately 160,000 to 180,000 square meters, including an underground area of about 55,000 square meters [1] - The project requires an assembly rate of no less than 50% [1] Construction Scope - The company is responsible for the construction of all individual residential buildings, supporting facilities, underground garages, outdoor comprehensive facilities, planning roads outside the red line, and community service facilities [1] Impact on the Region - Upon completion, the project will significantly improve regional living conditions, provide modern and high-quality living spaces, and enhance community functions and road network structure [1] - The project aims to elevate the urban landscape and land utilization efficiency, promoting integrated development and industrial fusion in Hefei New Station District, Feidong Economic Development Zone, and Yaohai Economic Development Zone [1]
中国能建9月24日获融资买入1.28亿元,融资余额13.31亿元
Xin Lang Zheng Quan· 2025-09-25 01:28
Group 1 - China Energy Construction Co., Ltd. (China Energy) experienced a trading volume of 5.99 billion yuan on September 24, with a financing buy-in amount of 1.28 billion yuan and a net financing buy of 2.5965 million yuan [1] - The total financing and securities balance for China Energy reached 13.37 billion yuan, with the financing balance accounting for 1.69% of the circulating market value, indicating a high level compared to the past year [1] - On the same day, China Energy's securities lending saw a repayment of 500 shares and a sell-off of 28,000 shares, with a total sell amount of 68,000 yuan, while the remaining securities lending volume was 2.4845 million shares [1] Group 2 - China Energy was established on December 19, 2014, and went public on September 28, 2021, primarily engaged in construction contract business through five operational departments [2] - The main revenue sources for China Energy include engineering construction (85.81%), with renewable energy and integrated smart energy contributing 32.38%, and other segments such as industrial manufacturing and investment operations also contributing to the revenue [2] - As of June 30, 2025, China Energy reported a revenue of 212.09 billion yuan, reflecting a year-on-year growth of 9.18%, and a net profit attributable to shareholders of 2.802 billion yuan, with a slight increase of 0.72% [3]
中国能建等于亳州投资成立生物质能公司
Qi Cha Cha· 2025-09-24 09:26
Core Points - Zhongneng Construction Biomass Energy (Bozhou) Co., Ltd. has been established with a registered capital of 36.54 million RMB [1] - The company is involved in heat production and supply, biomass energy technology services, and contract energy management [1] - The shareholders include China Energy Construction Group East Construction Investment Co., Ltd., Zhongneng Geothermal Co., Ltd., and Bozhou New Energy Development Co., Ltd. [1] Company Information - The legal representative of the company is Wu Jian [2] - The company is registered in Bozhou, Anhui Province, with a business scope that includes general projects such as heat production and supply, biomass energy technology services, and contract energy management [2] - The company is classified as an "Other Limited Liability Company" and is currently in operation [2] Shareholding Structure - China Energy Construction Group East Construction Investment Co., Ltd. holds a 40% stake, contributing 14.616 million RMB [2] - Zhongneng Geothermal Co., Ltd. owns 35% of the company, with an investment of 12.789 million RMB [2] - Bozhou New Energy Development Co., Ltd. holds a 25% stake, contributing 9.135 million RMB [2]
黄土高原,崛起一个算力重镇
投资界· 2025-09-24 07:56
Core Viewpoint - The article highlights the transformation of Qingyang from a traditional energy city to a key hub in China's computing power landscape, driven by the "East Data West Computing" national strategy, with a focus on attracting AI and digital economy enterprises [2][4][12]. Group 1: Industry Transformation - Qingyang is emerging as one of the eight major computing power hubs in China, leveraging its abundant renewable energy resources to establish a national data center cluster [4][10]. - By August 2025, Qingyang's computing power scale is expected to exceed 66,000 PFlops, with projections to surpass 100,000 PFlops by the end of the year, positioning it among the top tier of national computing power clusters [4][10]. - Over 300 digital economy enterprises have gathered in Qingyang, with half being leading companies in the AI sector [4][10]. Group 2: Investment and Infrastructure - Significant investments have been made in Qingyang's computing infrastructure, including projects from China Telecom, China Mobile, and China Energy, with total investments reaching billions [11]. - In 2023, China Telecom invested approximately 4.47 billion yuan in the first phase of its smart recovery center, while China Energy committed 5.5 billion yuan to a zero-carbon big data industrial park [11]. - The establishment of a 1 billion yuan computing power voucher policy aims to reduce R&D costs for enterprises by 30%, attracting major AI companies to set up training bases [7][16]. Group 3: Emerging Sectors - Qingyang is also developing a low-altitude economy, with investments in drone technology and related industries, positioning itself as the first "low-altitude economy city" in the province [12][14]. - The city has introduced a 10 billion yuan industrial development guidance fund to support emerging industries such as AI and low-altitude economy, leveraging a "fiscal + financial" model to attract social capital [14][16]. - The establishment of a comprehensive planning system for low-altitude economic development is underway, ensuring orderly progress in this sector [16]. Group 4: Challenges and Future Outlook - Despite the advancements, challenges remain, including an incomplete supporting industrial chain and difficulties in attracting high-end talent [16]. - The article expresses optimism for Qingyang's future as it continues to develop its computing power capabilities and explore new industrial narratives [17].
全国首条!交能融合项目开工
Zhong Guo Dian Li Bao· 2025-09-24 04:26
Core Viewpoint - The project marks the first large-scale highway photovoltaic project in Anhui Province and is the first in the country to achieve "synchronous design, construction, and operation" for a full-road energy integration project, providing a new model for the green transformation of national transportation infrastructure [1][3]. Group 1: Project Overview - The He-Xiang Expressway energy integration project is designed to establish a benchmark for green low-carbon highways, focusing on electrification, green energy, and intelligent management [3]. - The project has a planned total installed capacity of approximately 8.524 megawatts, with an expected annual power generation of about 8.48 million kilowatt-hours, which will reduce carbon dioxide emissions by approximately 4,170 tons and save about 2,586 tons of standard coal annually [3]. Group 2: Technological Innovations - The project will create an intelligent microgrid system to build an efficient, stable, and green power supply and distribution system, enabling precise energy regulation and efficient distribution [3]. - The system will optimize power allocation based on varying electricity demands in different areas and times, utilizing artificial intelligence algorithms to enhance energy utilization efficiency and ensure reliable power supply [3]. Group 3: Environmental and Aesthetic Integration - An innovative "tunnel photovoltaic corridor" will be constructed to integrate photovoltaic components with the surrounding environment at tunnel entrances, effectively utilizing idle space for solar power generation while ensuring traffic safety [5]. - This corridor will create a unique landscape that merges technology and ecology, broadening clean energy supply channels and achieving a harmonious balance between transportation, energy development, and environmental beautification [5].
宁夏17.6GW风光项目竞配:中国电建、宁夏国运、宁东新能源、华润等领衔
Xin Lang Cai Jing· 2025-09-23 12:10
Core Insights - The Ningxia Hui Autonomous Region plans to develop a total of 20.62 million kilowatts of renewable energy projects by 2025, focusing on green electricity parks and guaranteed grid connection projects [2][3] - The priority for 2025 includes 6.02 million kilowatts for characteristic advantage industry green electricity parks and 14.6 million kilowatts for guaranteed photovoltaic projects [2] - As of now, seven cities in Ningxia have announced the allocation of wind and solar projects, totaling 17.6 GW [2][3] Project Scale Summary - The total project scale for various cities in Ningxia is as follows: - Wuzhong City: 600,000 kW - Yinchuan City: 440,000 kW - Zhongwei City: 350,000 kW - Shizuishan City: 180,000 kW - Ningdong Modern Coal Chemical Industry Green Electricity Park: 170,000 kW - Guyuan City: 20,000 kW - Total: 1,760,000 kW [3] Project Owners - A total of 44 companies have been awarded the 17.6 GW wind and solar project scale, with the following key players: - China Power Construction: 3.37 GW - Ningxia Guoyun: 2 GW - Ningxia Ningdong New Energy: 1.7 GW [5][6][8] Central Enterprises Involvement - Eleven central enterprises have received wind and solar project quotas, including: - China Power Construction - China Nuclear Power - China Energy Engineering - State Power Investment Corporation - China National Petroleum Corporation [8][11] Competitive Configuration of Projects - In Wuzhong City, 29 photovoltaic projects were selected for competitive configuration, totaling 6 GW from an initial application of 16.1 GW [12] - In Yinchuan City, 9 projects were selected, with a total scale of 3.4 GW after adjustments [15] - Zhongwei and Guyuan cities have a combined planned scale of 3.5 GW for guaranteed grid connection projects [18]
世界最大,中国能建葛洲坝机电出品!
Zhong Guo Dian Li Bao· 2025-09-23 05:06
Core Insights - The world's largest hoisting vertical ship lift, developed by China Energy Construction Corporation's Gezhouba Machinery Company, has been successfully delivered, marking a new height for "Chinese intelligence" in the field of hoisting vertical ship lifts [1][5] Group 1: Project Overview - The Guangxi Baise Water Conservancy Hub Navigation Facility Project is a strategic initiative aimed at resolving the 20-year navigation interruption of the Youjiang River, contributing to the construction of the Western Land-Sea New Corridor and the Pearl River-Xijiang Economic Belt [3] - The project employs a combination mode of "upstream ship lock + long-distance intermediate channel + downstream ship lift," designed to accommodate a navigation standard of 2×500-ton fleets while also considering 1000-ton single vessels, with an annual one-way passing capacity of 6.02 million tons [3] Group 2: Technical Specifications - The Baise ship lift is currently the largest under construction globally and features the longest hoisting chamber in the world, with dimensions of 144 meters in length, 17.2 meters in width, and 11 meters in height, surpassing the Three Gorges ship lift [3] - The effective water area within the hoisting chamber measures 130 meters in length, 12 meters in width, and 3.9 meters in depth, allowing for simultaneous accommodation of two 1500-ton vessels for one-time lifting and lowering [3] Group 3: Engineering Achievements - The main hoisting machine, which serves as the "power hub" of the ship lift, consists of the lifting system, counterweight system, and hoisting chamber, and has received 8 national authorized patents and applied 24 proprietary technologies during its design and manufacturing [5] - The successful delivery of the main hoisting machine will accelerate the construction of the Guangxi Baise Water Conservancy Hub Navigation Facility Project, facilitating the opening of the nearest waterway to the sea for Yunnan and promoting the development of the Pearl River-Xijiang Economic Belt [5]
3D打印般精密“生长” 世界第一高坝如何智能建造?
Yang Shi Wang· 2025-09-20 17:12
Core Viewpoint - The Dashi Xia Hydropower Hub Project in Xinjiang has officially transitioned from construction to operational preparation, marking a significant milestone in China's major water conservancy projects [1] Group 1: Project Overview - The Dashi Xia Hydropower Hub features a maximum dam height of 247 meters, equivalent to over 80 stories, setting a world record for concrete-faced rockfill dams [2] - The project is located in the Tianshan Wensu Grand Canyon, an area prone to earthquakes, presenting complex geological conditions [2] Group 2: Construction Innovations - The project employs "smart construction" techniques to address challenges such as high seismic intensity and rapid flood discharge [2] - A digital twin smart center allows for real-time monitoring of all construction processes, achieving full visibility and control [3] - The dam incorporates over 9,000 high-strength anti-seismic steel bars and uses a layered construction method to ensure stability and seismic resistance [3] - The innovative "additional quality method" enhances monitoring efficiency, replacing 60% of traditional manual inspections and improving detection efficiency by over 50% [3] Group 3: Technological Integration - Blockchain technology has been introduced for concrete data collection and smart transport management, creating a "concrete ID" system for traceability [5] - The digital twin center integrates cloud computing, AI, virtual simulation, and blockchain, ensuring real-time data transmission from various construction sites [5] - Future capabilities include dynamic flood control simulations and the establishment of a health monitoring network for dam operations [5] Group 4: Environmental Protection Initiatives - The project includes a fish breeding and release station to mitigate ecological impacts, with 92,000 fish released into the Kumalak River [6][7] - A total investment of 65 million yuan has been allocated for ecological protection measures, including the construction of fish passages and breeding stations [7] - To date, 141,000 fish have been artificially bred and released to support local fish populations affected by the dam's construction [7]