Workflow
发电
icon
Search documents
生态环境部发布《关于做好2026年全国碳排放权交易市场有关工作的通知》
Xin Lang Cai Jing· 2026-02-13 04:07
Core Viewpoint - The Ministry of Ecology and Environment of China has issued a notification regarding the management of the national carbon emission trading market for 2026, focusing on key emission units in the power generation, steel, cement, and aluminum smelting industries, with specific guidelines for data management, quota allocation, and compliance [1][19]. Group 1: Key Emission Unit Management - Provincial ecological environment departments are required to establish a list of key emission units for 2027, including those with annual direct emissions of 26,000 tons of CO2 equivalent [20][21]. - The list of key emission units must be published by October 31, 2026, through the national carbon market management platform and provincial websites [21][2]. Group 2: Data Quality Management - Provincial departments must implement data quality management for greenhouse gas emissions in the specified industries, following the technical specifications set by the Ministry [3][21]. - By December 31, 2026, a data quality control plan must be developed for the key emission units [4][21]. - Monthly carbon emission data must be stored electronically within 40 days after each month ends [5][22]. Group 3: Reporting and Verification - Key emission units must submit their 2025 greenhouse gas emission reports by March 31, 2026 [6][23]. - Technical audits of these reports must be completed by June 30, 2026, for the power generation sector, and by July 31, 2026, for the steel, cement, and aluminum sectors [7][23]. Group 4: Quota Allocation and Compliance - Quotas for carbon emissions will be pre-allocated to key emission units in the steel, cement, and aluminum sectors by April 10, 2026, and to the power generation sector by June 30, 2026 [8][25]. - By September 20, 2026, the final allocation of quotas based on verification results must be completed [9][26]. - Compliance with the quota must be fulfilled by December 31, 2026 [10][27]. Group 5: Management of Other Key Industries - Other industries such as petrochemicals, chemicals, construction materials, non-ferrous metals, paper, and civil aviation with emissions of 26,000 tons of CO2 equivalent must also report their emissions [11][28]. - Reports from these industries must be submitted by March 31, 2026, and verified by December 31, 2026 [12][28]. Group 6: Strengthening Implementation - Local ecological environment departments are urged to enhance their management capabilities and training related to carbon emission data quality and quota compliance [30][31]. - Strict enforcement of regulations regarding carbon market data quality and compliance is emphasized to prevent fraudulent activities [31].
生态环境部:4月10日前省级生态环境主管部门向钢铁、水泥、铝冶炼行业重点排放单位预分配2025年度碳排放配额
Xin Hua Cai Jing· 2026-02-09 13:49
(文章来源:新华财经) 2026年12月31日前,省级生态环境主管部门组织发电、钢铁、水泥、铝冶炼行业重点排放单位按时足额 完成2025年度碳排放配额清缴。 新华财经北京2月9日电生态环境部办公厅2月9日公布《关于做好2026年全国碳排放权交易市场有关工作 的通知》。其中明确,2026年4月10日前,省级生态环境主管部门向钢铁、水泥、铝冶炼行业重点排放 单位预分配2025年度碳排放配额。2026年6月30日前向发电行业重点排放单位预分配2025年度碳排放配 额。 2026年9月20日前,省级生态环境主管部门基于2025年度核查结果,按照年度配额总量和分配方案核定 2025年度发电、钢铁、水泥、铝冶炼行业重点排放单位应发放配额量,并向全国碳排放权注册登记机构 书面报送相关数据表,进行核定配额的注册登记。9月30日前,省级生态环境主管部门向发电、钢铁、 水泥、铝冶炼行业重点排放单位分配2025年度碳排放配额。 ...
不缺电的中国,为何还在狂建发电厂?美媒:中国在造能源长城!
Sou Hu Cai Jing· 2026-02-09 10:41
中国发电量已经稳坐全球头把交椅,2024年超过10万亿千瓦时,比美国多出一倍多,自给率保持在80%以上。 表面上看,电力供应绰绰有余,可为什么还在各地批复新发电厂?其实,这不是盲目扩张,而是提前布局。 想想看,经济还在高速增长,用电需求自然水涨船高,尤其是新兴产业像AI和电动车,这些家伙对电的胃口越来越大。要是等需求爆棚再建厂,那可就晚 了,得先备好粮草。 美媒那边也注意到了这事儿。2024年11月18日,美国有线电视新闻网发文,说中国在库布其沙漠建的太阳能项目像匹奔腾的骏马,象征清洁能源冲刺。 中国风能和太阳能在建项目占全球三分之二,总容量339吉瓦,能供2.5亿户家庭用电。他们还说,中国提前六年完成12亿千瓦可再生能源目标,而美国那边 政策摇摆不定。 另一个媒体《大众机械》杂志同天报道,中国正修"光伏长城",长133公里,宽25公里,到2030年能覆盖北京全年电力需求。 这"能源长城"不是防御墙,而是绿色电力屏障。为什么叫长城?因为它不光发电,还固定沙漠沙土,减少侵蚀,顺带创造就业。 库布其项目利用荒漠地形,光伏板下面还能种耐旱植物,生态和能源双赢。中国太阳能发展这么猛,到2030年代初,发电量就超美国总 ...
新天绿能(600956.SH)1月发电量同比增加15.25%
智通财经网· 2026-02-09 10:38
根据公司初步统计,2026年1月,公司及子公司按合并报表口径完成输/售气量72,310.45万立方米,同比 增加6.80%,其中售气量66,905.80万立方米,同比增加8.49%;代输气量5,404.64万立方米,同比减少 10.47%。 新天绿能(600956.SH)发布公告,根据公司初步统计,2026年1月,公司及子公司按合并报表口径完成发 电量1,739,287.28兆瓦时,同比增加15.25%。 ...
扬电公司:逆势攻坚突围 向好向新奋进
Core Viewpoint - Jiangsu Huadian Yangzhou Power Company has achieved significant results in 2025 by overcoming challenges and focusing on energy supply responsibilities, asset preservation, and transformation development [1] Group 1: Safety and Environmental Management - The company has achieved a continuous safety production record of 3,653 days, aiming for zero personal injuries, zero environmental penalties, and zero non-stop operations [2] - A comprehensive safety management system has been established, focusing on high-risk operations and implementing a culture of "no safety, no work" [2] - Environmental protection measures have led to zero penalties, with significant projects in distributed solar power and centralized solar power development [6] Group 2: Financial Performance and Efficiency - The company successfully turned around from four consecutive years of losses to profitability, achieving a total power generation of 40.6 billion kilowatt-hours in 2025 [4] - Cost management strategies have resulted in a reduction of financial expenses by 1.8 million yuan, with a decrease in coal prices by 123 yuan per ton [5] - The company has implemented measures to optimize energy production and improve operational efficiency, including enhancing market strategies and internal energy-saving initiatives [4][5] Group 3: Green Development Initiatives - The company is actively pursuing new energy projects, including significant wind and solar power initiatives, to expand its green development footprint [7] - Environmental governance efforts have included over 120 key projects aimed at pollution control and resource optimization [6] Group 4: Party Building and Corporate Culture - The company has integrated party building into its operational strategy, enhancing political advantages and fostering a positive corporate culture [8] - Initiatives such as the "Vanguard Team" projects and various responsibility zones have been established to align party work with production goals [8] - The promotion of a "striving culture" has been emphasized to motivate employees and enhance organizational cohesion [9]
AES Andes放弃智利绿氢项目
Zhong Guo Hua Gong Bao· 2026-02-03 03:21
Core Viewpoint - AES Andes has decided to halt the execution of its $10 billion INNA green hydrogen and green ammonia project to focus on its core strengths in renewable energy and energy storage, aligning with the strategic direction of its U.S. parent company [1] Group 1: Strategic Decisions - The decision to stop the INNA project is a strategic choice rather than a reflection of doubts about the value and potential of Chile's green hydrogen industry [1] - The company aims to concentrate resources on the development and construction of its renewable energy and energy storage business [1] Group 2: Current Projects and Future Plans - Since implementing its "sustainable development" strategy, the company has added a total of 2,181 megawatts of renewable energy and energy storage projects in Chile, transforming its energy structure to 70% renewable [1] - The current focus is on ensuring the commercial operation of the Andes Solar III photovoltaic plant and the Bolero battery storage system in the first half of the year [1] - Four new renewable energy projects, including Arenales and Cristales, are under construction, which are expected to add an additional 2,363 megawatts of capacity by 2027 [1]
政策仍在“等待期”——政策周观察第66期
一瑜中的· 2026-02-02 07:13
Group 1: Central Government Policies - The central government has focused on several key areas, including diplomacy, anti-corruption, industry regulation, and capital markets [2][3] - The Ministry of Industry and Information Technology emphasized the need to combat "involution" in the photovoltaic industry, advocating for capacity control and other measures to ensure healthy competition [2][3] - The National Development and Reform Commission announced improvements to the capacity pricing mechanism for coal, gas, and pumped storage power generation, including the establishment of a new pricing mechanism for independent energy storage [2][3] Group 2: Key Meetings and Events - The Politburo of the Communist Party held a meeting to discuss the strategic direction for future industrial development, emphasizing the importance of innovation and collaboration among industries [8] - The State Council held a meeting on anti-corruption, highlighting the ongoing challenges and the need for a strong stance against corruption to achieve the goals set for the 14th Five-Year Plan [8] - The China Securities Regulatory Commission convened a meeting to discuss the "14th Five-Year Plan" for the capital market, focusing on risk prevention and promoting high-quality development [13][14] Group 3: State-Owned Enterprises Reform - The State-owned Assets Supervision and Administration Commission outlined plans for the restructuring and strategic integration of central enterprises, aiming to enhance their role in national security and public service [11] - The focus will be on promoting high-quality mergers and acquisitions to secure core resources and technological advantages [11] - The government aims to reduce industry involution by supporting strong innovative enterprises in horizontal and vertical integration [11] Group 4: Industry-Specific Developments - The photovoltaic industry is facing challenges related to excessive competition, prompting the government to call for regulatory measures to restore rational development [12] - The Ministry of Commerce indicated a willingness to engage in new rounds of economic negotiations with the U.S. ahead of a potential leaders' meeting [13] - The National Development and Reform Commission's new pricing mechanism aims to enhance the participation of energy storage in the electricity market, promoting fair competition [15]
走近大国重器丨用二氧化碳发电——探访“超碳一号”示范工程
Core Viewpoint - The "Supercritical Carbon Dioxide" (S-CO2) power generation technology, developed by China National Nuclear Corporation (CNNC), has successfully transitioned from laboratory to commercial application, marking a global first in utilizing supercritical CO2 for power generation [7][17]. Group 1: Technology Overview - The S-CO2 power generation system can improve power generation efficiency by over 85% and increase net power output by more than 50% compared to traditional steam-based systems [8]. - The technology simplifies the system, reduces equipment requirements, and cuts operational space by 50% [8]. - The process involves compressing, heating, expanding, and cooling supercritical CO2, which operates at temperatures above 31°C and pressures exceeding 73 standard atmospheres [10]. Group 2: Development Journey - The development of S-CO2 technology began in 2009, with the team facing significant challenges due to a lack of existing research and experience in this field [11]. - The team overcame various technical hurdles, including creating a unique sealing structure to prevent leaks under high temperature and pressure conditions [12]. - The project took nearly a decade to develop a comprehensive dynamic control system to ensure efficient operation [12]. Group 3: Commercial Application and Impact - The "Supercarbon One" demonstration project has been operational since December 20, 2025, at Shougang Water Steel, successfully converting waste heat from steel production into clean electricity [9][17]. - The project is expected to generate an additional 70 million kWh of electricity annually, increasing revenue by nearly 30 million yuan and reducing carbon emissions by several tons [17]. - The technology is positioned to support China's "dual carbon" goals and is included in key national energy innovation plans [15][18]. Group 4: Future Prospects - The CNNC plans to expand the application of S-CO2 technology to various energy sources, including thermal, nuclear, and renewable energy systems, aiming for modular and intelligent power generation solutions [17]. - A 50 MW demonstration project combining molten salt storage with S-CO2 power generation is set to begin in 2024, highlighting the ongoing commitment to innovation in this field [18].
两部门发文完善发电侧容量电价机制
Xin Lang Cai Jing· 2026-02-01 23:26
Core Viewpoint - The National Development and Reform Commission and the National Energy Administration have issued a notice to improve the capacity pricing mechanism for power generation, aiming to support the construction of a new energy system and ensure the stable operation of the power system while promoting green economic development [1]. Group 1 - The notice aims to guide the reasonable construction of adjustable power sources and support their role in power regulation during the 14th Five-Year Plan period, establishing capacity pricing mechanisms for coal power and pumped storage, while some provinces are exploring mechanisms for gas power and new energy storage [1][2]. - The current capacity pricing mechanism faces challenges, including a rapid decline in coal power generation hours in some regions and insufficient support from existing pricing levels, which may hinder the scientific layout and cost-effectiveness of pumped storage projects [2]. - The notice specifies that the proportion of fixed cost recovery for coal power units through capacity pricing will be raised to no less than 50%, equating to 165 yuan per kilowatt annually, and a capacity pricing mechanism for gas power will be established based on coal power pricing methods [2][3]. Group 2 - The notice requires the orderly establishment of a reliable capacity compensation mechanism, which measures the peak capacity of power generation units during peak demand periods, allowing for fair compensation based on this metric without differentiating between types of units [3]. - The establishment of a reliable capacity compensation mechanism is expected to promote fair competition among different technology types and drive high-quality development in the industry, aligning with practices in mature electricity markets [3].
电费刺客退散!全球首台“超碳一号”投运,每度电都有“废热补贴”!
Sou Hu Cai Jing· 2026-01-30 10:12
起猛了?二氧化碳居然不是"温室背锅侠",而是发电界的"新晋牛马"? 夏天开空调怕遇到"电费刺客",工厂烟囱里的热气却白白飘走,而中国直接把这些"废热"变"现金"—— 全球首台商用超临界二氧化碳发电机组"超碳一号" 在贵州正式投运,效率狂超85%,以前发电靠"烧开 水",现在靠"吹气旋"! 未来你家里的电,有一部分就可能来自工厂烟囱里那些"白白溜走"的热气。 这不是科幻片,而是一项中国刚投运的黑科技。它不进能把工业废热的发电效率拉到85%以上,还能让 发电设备"瘦身"30%-50%。 这波"变废为宝"的操作,直接颠覆全球能源规则! 今天咱们就来聊聊这台"超碳一号"。 它可不是简单升级,而是一场发电原理革命,把传统发电的"老套路"直接扔进历史课本! 但问题来了!蒸汽推动完轮机,得冷却变回水,这一冷一热的相变过程,能量直接"跑路"大半,理论效 率天花板才40%,这不是纯纯"摸鱼"嘛。 但"超碳一号"直接开挂,它的核心秘诀就是:不用水,改用超临界二氧化碳当"能量搬运工"! 把二氧化碳加热加压到31℃、73个大气压以上,它就会变身神奇的"超临界态"——既不是气也不是液, 却有气体般顺滑的流动性,还有液体般强悍的推动力, ...