CH ENERGY ENG(601868)
Search documents
总投资30.5亿!1600万吨/年!中国能建广东肇庆项目预计年底投产
Sou Hu Cai Jing· 2025-09-14 11:00
Group 1 - The construction of the granite mining project in Deqing County, Zhaoqing City, Guangdong Province is nearing completion and is expected to commence operations by the end of this year, becoming a significant high-end sand and gravel aggregate supply base for the Guangdong-Hong Kong-Macao Greater Bay Area [1] - The project represents the largest reserve and highest annual production capacity sand and gravel project in China Energy Construction's history, with a total investment of approximately 3.05 billion yuan and a recoverable resource of nearly 364 million tons, with a production scale of 16 million tons per year [1] - As of now, the industrial square's civil engineering work is nearly complete, with 90% of equipment installation and steel structure factory installation progressing smoothly, while safety facility construction at the mining sites is also advancing [1] Group 2 - Once operational, the project will significantly enhance China Energy Construction's competitiveness and influence in the building materials sector, aiming to provide not only products but also to share green mining construction and management experiences, contributing to the high-quality development of the regional economy [2] - The project is expected to contribute over 80 million yuan in tax revenue annually to Deqing County and directly provide over 300 stable jobs, playing a crucial role in driving local economic development and increasing employment for the community [3]
山高新能源与中国能建第二工程公司及正晨科技订立EPC 合同
Zhi Tong Cai Jing· 2025-09-14 10:45
Group 1 - The core point of the article is the announcement of an EPC contract between Heze Shango Energy and a joint contractor for a wind power project in Shandong Province, China [1] - The total contract value is approximately RMB 1.011 billion, which includes all taxes and may be adjusted based on changes in national tax policies [1] - The project involves a distributed wind power capacity of 175 megawatts located in Yuncheng County, Heze City, Shandong Province [1]
山高新能源(01250)与中国能建第二工程公司及正晨科技订立EPC 合同
智通财经网· 2025-09-14 10:44
Core Viewpoint - Shandong High New Energy and Shandong High Holdings announced the signing of an EPC contract for a 175 MW distributed wind power project in Shandong Province, with a total contract value of approximately RMB 1.011 billion, including all taxes [1] Group 1 - The EPC contract was signed between Heze Shandong High Energy, a wholly-owned subsidiary of Shandong High New Energy, and the joint contractors, China Energy Engineering Second Construction Company and Zhengchen Technology [1] - The project is located in Yuncheng County, Heze City, Shandong Province [1] - The total contract price is subject to adjustment based on changes in national tax policies [1]
基础建设板块9月12日涨0.64%,东珠生态领涨,主力资金净流出1.32亿元
Zheng Xing Xing Ye Ri Bao· 2025-09-12 08:38
Market Overview - On September 12, the infrastructure sector rose by 0.64% compared to the previous trading day, with Dongzhu Ecological leading the gains [1] - The Shanghai Composite Index closed at 3883.69, up 0.22%, while the Shenzhen Component Index closed at 12996.38, up 0.13% [1] Top Gainers in Infrastructure Sector - Dongzhu Ecological (603359) closed at 11.15, up 9.96% with a trading volume of 6779.23 lots [1] - Jieneng Iron Han (300197) closed at 2.54, up 7.63% with a trading volume of 216.19 million [1] - Chengbang Co., Ltd. (603316) closed at 11.02, up 6.17% with a trading volume of 36.91 million [1] - Other notable gainers include Garden Co. (605303) up 5.99%, Hongrun Construction (002062) up 5.33%, and ST IF Ping (603843) up 4.89% [1] Top Losers in Infrastructure Sector - ST Yuancheng (603388) closed at 1.77, down 4.32% with a trading volume of 21.50 million [2] - Jiao Jian Co. (603815) closed at 10.94, down 3.19% with a trading volume of 21.38 million [2] - ST Lingnan (002717) closed at 1.62, down 2.99% with a trading volume of 107.95 million [2] Capital Flow Analysis - The infrastructure sector experienced a net outflow of 132 million yuan from institutional investors, while retail investors saw a net inflow of 169 million yuan [2] - Major stocks with significant capital flow include Xinjiang Jiaojian (002941) with a net outflow of 82.03 million yuan from institutional investors [3] - Other stocks like Pudong Construction (600284) and China Energy Construction (601868) saw net inflows of 71.73 million yuan and 70.45 million yuan from institutional investors, respectively [3]
中国能建葛洲坝二公司松岗河项目:抓好BIM应用 推进桥梁施工技术创新
Huan Qiu Wang· 2025-09-12 07:42
Core Viewpoint - The project team of China Energy Construction Gezhouba Group Co., Ltd. successfully tackled technical challenges in the construction of the Shajing River pedestrian bridge in Shenzhen through innovative solutions and digital empowerment, ensuring high-quality and efficient project execution [1][3][4]. Group 1: Innovation and Technology Empowerment - The project team established a BIM technology research group to address the challenges posed by the unique geometric design of the bridge, utilizing 3D modeling to identify design conflicts and improve construction accuracy [3]. - Innovative solutions included the use of curved steel structure frameworks and multi-scenario construction simulations, which significantly enhanced the precision of assembling the unique steel box beams, reducing costs and improving safety [3][4]. Group 2: Effective Construction Management - The team implemented a three-dimensional control scheme to prevent tilting of the asymmetric steel arch bridge, enhancing stability through increased temporary support and anchoring systems [4]. - The project achieved key milestones ahead of schedule, completing the steel box beam installation and welding in just three months, and finishing the cofferdam removal 15 days early, thus ensuring safety for the flood season [4][5]. Group 3: Cost Reduction and Efficiency Improvement - The application of BIM technology led to a significant reduction in construction costs by optimizing the construction plan, which shortened the project timeline by 40 days [5]. - The project established a positive cycle of "technical optimization - efficiency improvement - cost control," demonstrating the effectiveness of innovative approaches in construction management [5]. Group 4: Safety Management - The project team utilized BIM technology to create a comprehensive digital model for the construction process, identifying potential risks and implementing targeted safety measures, resulting in zero safety incidents throughout the project [7]. - The successful application of innovative technologies not only ensured the project's smooth progress but also provided valuable references for future construction of spatial curved bridges and unique steel structures [7].
房建工程通过交工验收,济商高速迎来建设新进展
Qi Lu Wan Bao Wang· 2025-09-12 03:42
Core Points - The completion of the Jishang Expressway housing construction project has passed the acceptance inspection, marking its readiness for delivery and laying a solid foundation for the expressway's operational goals [1] - The project is part of Shandong Province's "14th Five-Year" highway network plan, with a total length of 45.06 kilometers and designed for a speed of 120 kilometers per hour, enhancing connectivity between major economic zones [5] Group 1 - The acceptance inspection was conducted by a joint team, which included various organizations, and confirmed that the project met quality and safety standards [1][3] - The project has achieved a 100% compliance rate for concrete structure strength and successfully passed the waterproofing test on the first attempt [3] - The construction team has implemented digital and intelligent technologies to enhance project management and ensure quality control throughout the construction process [4] Group 2 - The project adopts a "highway + new energy" construction model, integrating renewable energy technologies such as photovoltaic power generation and microgrid systems [3] - The Jishang Expressway will serve as a rapid transit route connecting the Jiaodong Peninsula, Lunan, and the Central Plains, significantly improving transportation conditions in the region [5] - The project emphasizes a dual prevention mechanism for safety management and focuses on addressing common quality issues through technological innovation [4]
中国造压缩空气“超级充电宝” 锚定未来“新三样”
Zhong Guo Chan Ye Jing Ji Xin Xi Wang· 2025-09-11 21:32
Core Viewpoint - China Energy Construction (China Energy) has achieved significant breakthroughs in the research and development of compressed air energy storage (CAES) technology, marking a major advancement from theoretical concepts to practical engineering applications [1][3]. Group 1: Technological Breakthroughs - China Energy has successfully constructed the world's largest artificial cavern gas storage test platform and has set five world records and eight pioneering achievements in gas sealing cycle tests, achieving a breakthrough pressure of 18 MPa [1]. - The artificial cavern technology is expected to expand the site selection for CAES plants and significantly reduce costs, enhancing the feasibility of large-scale energy storage solutions [4]. Group 2: Industry Context and Demand - As of June this year, the installed capacity of wind and solar power in China reached 1.673 billion kilowatts, with a peak electricity load of 1.5 billion kilowatts in July, indicating a high penetration of variable renewable energy sources [2]. - The construction of a new power system necessitates long-duration energy storage solutions, which have become essential for ensuring grid stability and enhancing the absorption capacity of renewable energy [2][3]. Group 3: Future Prospects - The National Development and Reform Commission and the National Energy Administration have identified CAES as a key technology for development, aiming to promote the engineering application of hundred-megawatt-level projects [5]. - By 2030, it is projected that China's CAES installed capacity will reach 43 GW, driven by the need for effective energy storage solutions to support renewable energy consumption and the construction of a new power system [7]. Group 4: Commercialization and Application - China Energy's CAES system solution, known as "Energy Storage No. 1," is positioned as a leading technology in the new energy storage sector, addressing challenges related to high proportions of renewable energy and energy consumption mismatches [3][6]. - Various commercialization models for CAES, including shared storage, integrated renewable energy and storage, and independent storage stations, are being explored to enhance economic viability and application scenarios [6].
东南亚光伏市场:从"出口跳板"到"市场终端"
Zhong Guo Chan Ye Jing Ji Xin Xi Wang· 2025-09-11 00:26
近年来,随着全球能源转型步伐加快,亚洲地区正在成为光伏产业发展新高地。尤其是东南亚国家,凭 借丰富的太阳能资源、日益完善的政策框架和巨大的电力需求,吸引大量中国光伏企业落地投资。原本 主要作为中国光伏制造出口欧美"跳板"的东南亚,已成为中国企业开发本地市场、参与区域能源转型的 重要前沿。 美国能源经济与金融分析研究所指出,孟加拉国、巴基斯坦、斯里兰卡等亚洲国家虽面临电网容量、融 资与技术等多重挑战,但政策与监管支持正逐步推进光伏装机目标。东南亚开始步入能源战略转型期, 清洁能源替代传统能源的步伐正在加速。 为推进能源转型,东南亚多国明确提出光伏发展目标。越南设定到2030年实现18吉瓦风电和太阳能装机 容量;泰国计划2030年可再生能源占比达到30%;菲律宾则通过绿色能源发电项目拍卖释放超10吉瓦光 伏发电项目,正式进入国家级清洁能源招标周期。马来西亚、印尼等国也纷纷制定可再生能源装机目 标,政策框架逐步完善。 与此同时,南亚、中亚、东南亚光照资源丰富,光伏发电成本持续下降,已低于煤电,成为最经济的发 电方式之一。以乌兹别克斯坦为例,该国地处中亚腹地,可再生能源丰富,其中约97%为太阳能。据世 界银行估计,当 ...
中国能建大宗交易成交198.37万元
Zheng Quan Shi Bao Wang· 2025-09-10 14:39
Group 1 - The core transaction of China Energy Engineering Corporation (中国能建) on September 10 involved a block trade of 830,000 shares at a price of 2.39 yuan, totaling 1.9837 million yuan [2][3] - The buyer was Guotai Junan Securities Co., Ltd., and the seller was China International Capital Corporation [2][3] - Over the past three months, the stock has seen a total of four block trades, with a cumulative transaction amount of 7.7936 million yuan [2] Group 2 - The closing price of China Energy Engineering Corporation on the day of the transaction was 2.39 yuan, with a turnover rate of 0.59% and a total trading volume of 4.57 billion yuan [2] - The stock experienced a net outflow of 13.4402 million yuan in main funds for the day, and a cumulative decline of 0.42% over the past five days [2] - The latest margin financing balance for the stock is 1.402 billion yuan, reflecting a decrease of 25.2005 million yuan, or 1.77%, over the past five days [3] Group 3 - One institutional rating was given for the stock in the past five days, with the highest target price set at 3.07 yuan by CITIC Securities on September 4 [3]
中能建松原氢能产业园项目入选第一批绿色液体燃料试点项目名单
Zheng Quan Shi Bao Wang· 2025-09-10 14:29
Core Viewpoint - The National Energy Administration of China has announced the first batch of pilot projects for green liquid fuel technology, with China Energy Construction (601868) selected for its integrated green hydrogen and ammonia project in Songyuan, which aims to promote the development of the green chemical industry and establish a replicable technology model for the hydrogen energy sector [1] Group 1 - The project by China Energy Construction is included in the first batch of national pilot projects for green liquid fuel technology [1] - The Songyuan hydrogen energy industrial park project will enable local consumption of green electricity and high-value conversion [1] - The initiative aims to facilitate the large-scale production of green hydrogen and ammonia, contributing to the standardization process of the domestic green hydrogen and ammonia industry [1]