Workflow
Zhong Guo Dian Li Bao
icon
Search documents
国网湖北老河口供电 AI赋能提升服务监管
Zhong Guo Dian Li Bao· 2025-11-03 02:07
Core Insights - The company has implemented an AI-driven customer feedback system in its service hall to enhance customer satisfaction and operational efficiency [1] - A three-month survey identified pain points in manual supervision, leading to the development of an AI video recognition tool for real-time customer feedback [1] - The new system has improved the identification of at-risk customers, achieving over 90% coverage in recognizing customer complaints and concerns [1] Group 1 - The AI video recognition tool captures customer satisfaction data and triggers alerts for "unsatisfied" ratings, allowing for immediate intervention by staff [1] - The company has established a closed-loop management system that integrates intelligent monitoring, risk warning, and performance incentives [1] - The initiative aims for zero incidents of escalated customer complaints by Q3 2025 [1] Group 2 - The risk label system combines customer feedback, return visit records, and abnormal sound information with AI monitoring tools [1] - The transition from manual inspections to digital supervision represents a significant innovation in the company's operational model [1] - The focus on autonomous implementation of core business services is a key strategy for improving customer service quality [1]
调节能力超54万千瓦!我国规模最大的蓄热电锅炉型虚拟电厂启用
Zhong Guo Dian Li Bao· 2025-11-03 00:43
在河北建筑工程学院,记者看到了这套系统的实际应用效果。作为该蓄热式电锅炉型虚拟电厂中唯一的 高校用户,该校相关负责人介绍:"我们从2020年开始使用16兆瓦电极锅炉液体蓄热系统,连续五年参 与虚拟电厂项目,累计参与调峰电量约2500万千瓦时,累计调峰收益约为540万元,大幅降低了供暖成 本。" 虚拟电厂参与华北电力调峰辅助服务市场,对促进冀北新能源消纳也发挥着重要作用。冀北地区是我 国"十四五"规划中的重要清洁能源基地,新能源装机容量已突破8200万千瓦,占比高达76%。为应对风 电、光伏发电的波动性,华北电力调峰辅助服务市场将运行时段精准设定在凌晨00:30至7:00(风力大 发时段)和午间12:30至16:00(光伏大发时段)。虚拟电厂据此灵活响应:在新能源发电较多时,引导 用户多用电,主动消纳新能源;在发电不足时,适时减少用电或释放储能,有效保障电网稳定运行。 11月1日,随着华北地区陆续进入供暖季,我国规模最大的蓄热式电锅炉型虚拟电厂同步启用。这个"看 不见的电厂"并没有实体厂房,而是通过智能平台,将分散在张家口、唐山两地共16处蓄热式电锅炉聚 合成一个整体,具备54.4万千瓦调节能力参与电网调节,在 ...
当风电光伏唱主角,谁来做电网的“稳定器”?
Zhong Guo Dian Li Bao· 2025-11-02 12:57
Core Insights - China is rapidly building a new power system dominated by renewable energy under the "dual carbon" goals, with pumped storage hydropower entering a golden period of development [1] - As of the end of 2024, China's cumulative installed capacity of pumped storage will reach 58.69 million kilowatts, accounting for over 30% of the global total, maintaining the world's leading position for nine consecutive years [1] - The industry faces challenges such as the need for enhanced capacity and technology, improved electricity pricing mechanisms, and insufficient collaboration within the supply chain [1] Functional Restructuring - Pumped storage is evolving from merely being a "regulator" to becoming a "stabilizer" for the entire power system, reflecting the strategic elevation of its technology [2] - The integration of high proportions of renewable energy has introduced new challenges, necessitating a shift in pumped storage's role to provide system stability support [2] - Pumped storage's advantages include large capacity, rapid response, and operational flexibility, making it essential for enhancing grid resilience [2] Regional Practices - Different regions in China showcase the diverse roles of pumped storage, such as ensuring power supply safety during extreme weather in Northeast China and peak shaving in North China during heating periods [3] - The operational model of pumped storage is transforming from simple cycles to more flexible operations, enhancing its adaptability to fluctuations in renewable energy output and load changes [3] Industry Chain Development - China has established a comprehensive pumped storage industry chain, with significant advancements in design, equipment manufacturing, and construction [4][5] - The industry is experiencing rapid expansion, but structural bottlenecks are emerging, including mismatches between capacity and demand, and challenges in talent and resource allocation [5] - The industry is transitioning from a focus on construction to a more balanced approach that includes operation and talent development [5] Path to Breakthrough - To address the challenges, a systematic approach is needed, including a planning system that balances resource allocation and demand, and fostering innovation in technology and equipment [6] - Enhancing cross-sector collaboration and comprehensive regulation is essential to avoid the pitfalls of focusing too heavily on construction [6] Development Paradigm - The pumped storage industry is at a crossroads, requiring a collaborative approach among policy, technology, and market forces to ensure sustainable development [7] - A robust policy framework, particularly the "two-part electricity price" mechanism established in 2021, is crucial for providing stability [7] - The industry must adapt to market changes, including the establishment of a composite revenue model that incorporates capacity fees and auxiliary service income [7][8] Future Outlook - The integration of digital technologies is transforming the entire industry chain, enhancing operational efficiency and system intelligence [8] - The acceleration of the national unified electricity market is reshaping the operational ecosystem for pumped storage, creating multiple revenue channels [8][9] - Future efforts should focus on refining market rules and establishing pricing mechanisms that reflect the system support value of pumped storage [9]
哈电国际42年持续拓展高端电力装备国际版图
Zhong Guo Dian Li Bao· 2025-11-02 02:16
Core Viewpoint - The company, Harbin Electric International, has achieved significant milestones in various key projects under the Belt and Road Initiative, showcasing its commitment to international development and enhancing China's global influence in the energy sector [1][3][4]. Group 1: Project Achievements - The company has made notable progress in several projects, including the completion of the water pressure test conditions for the Uzbekistan Syr Darya Phase II 1.6 million kW combined cycle power plant and the concrete pouring for the foundation of the gas turbine and generator at the Saudi Narayia 2 combined cycle power plant [1]. - Harbin Electric International has executed a total of 66 large-scale overseas projects over the past 42 years, contributing to China's presence in the international market and enhancing its competitive edge [4][5]. Group 2: Strategic Development - Since the inception of the Belt and Road Initiative, the company has accelerated its global expansion, participating in the construction of the regional economic belt and enhancing the depth and breadth of global economic cooperation [3][6]. - The company has transitioned from general contracting to a more flexible business model, covering full lifecycle services and establishing international marketing service centers and regional headquarters across over 40 countries [5]. Group 3: Quality and Recognition - The company has prioritized project quality and adherence to international standards, achieving several world records in project delivery and operational efficiency, which has earned it numerous awards and recognition in the industry [7]. - Harbin Electric International has been recognized for its contributions to local communities, improving living standards and creating job opportunities in the regions where it operates [8].
南方电网新型电力系统发展白皮书正式发布
Zhong Guo Dian Li Bao· 2025-11-01 02:53
Core Insights - The Southern Power Grid Company has officially released a white paper detailing its achievements and innovations in the construction of a new power system during the 14th Five-Year Plan period [1] Group 1: Achievements in Power System Development - The company has built the world's largest AC-DC interconnected power grid, with a cumulative electricity transmission of over 950 billion kilowatt-hours [3] - The reliability of power supply in the Guangdong-Hong Kong-Macao Greater Bay Area has reached world-class levels, with over 220,000 registered market participants, accounting for one-fourth of the national total [3] - The installed capacity of renewable energy has exceeded 257 million kilowatts, a 3.5-fold increase since 2020, establishing a clean and low-carbon supply structure [4] Group 2: Green Energy Supply and Consumption - The electricity substitution volume in the five provinces has surpassed 240 billion kilowatt-hours, with electricity accounting for 34% of total energy consumption, 5 percentage points higher than the national average [5] - Over 100,000 charging piles have been installed across urban and rural areas, achieving full coverage in the Greater Bay Area [5] - The trading volume of green electricity certificates is expected to reach 250 billion kilowatt-hours by 2025, surpassing the total of the previous three years [5] Group 3: Collaborative Development of Power Sources and Storage - The company has implemented a system-wide approach to address supply-demand matching challenges, enhancing the efficiency of green electricity across the entire production, transmission, consumption, and storage chain [6] - The installed capacity of pumped storage and new energy storage has exceeded 15 million kilowatts, with demand-side response levels reaching 7.6% [7] - The establishment of 35 new power system demonstration zones and 36 near-zero carbon demonstration zones has provided replicable models for coordinated development [8] Group 4: Technological Innovations - The company has adopted advanced technologies such as cloud computing, big data, and artificial intelligence to transform the power grid from traditional to intelligent [9] - Over 99.5% of substations are now unmanned, and the coverage of distribution automation has increased to 99.72% [9] - The company has launched the first national pilot base for artificial intelligence applications in the energy sector, promoting the development of a digital power grid [10]
同比增长1.1倍!三季度绿证价格显著上涨
Zhong Guo Dian Li Bao· 2025-10-31 14:09
Core Insights - The green certificate market has shown significant growth in both volume and price, with a trading scale of 5.29 billion certificates from January to September, representing a year-on-year increase of 110% [1] - The average trading price of green certificates reached 5.06 yuan per certificate in the third quarter, marking a 210% increase compared to the first quarter [1] Market Dynamics - The increase in trading activity and prices is attributed to the continuous improvement of market mechanisms, including the introduction of long-term green power purchase agreements (PPAs), which have exceeded 30 billion kilowatt-hours in trading volume [1] - The demand for green certificates is expanding, driven by the implementation of energy laws and the promotion of minimum renewable energy consumption targets [1] International Recognition and Future Plans - The international recognition of Chinese green certificates has improved, with initiatives like "China Green Certificate: Smoothly Connecting China to the World" enhancing visibility in regions such as the Greater Bay Area and Yangtze River Delta [2] - The National Energy Administration plans to focus on cultivating demand for green certificates and promoting high-quality market development, including revising regulations and expanding application scenarios [2]
中国石油“十四五”重点工程,投产!
Zhong Guo Dian Li Bao· 2025-10-31 11:34
Core Viewpoint - The Guangxi Petrochemical Ethylene Project, a key initiative under China National Petroleum Corporation (CNPC) during the 14th Five-Year Plan, has been fully completed and is now operational, marking a significant milestone in China's petrochemical industry transformation [1][3]. Investment and Scale - The project has a total investment exceeding 30 billion yuan, establishing the largest million-ton ethylene facility in Southwest China, which signifies a critical shift from scale dependency to quality improvement in the petrochemical sector [3]. Technological Innovations - The project features several technological advancements, including the world's largest 200,000-ton diesel adsorption separation unit, which enhances raw material utilization efficiency by over 15% compared to traditional methods [22]. - It employs CNPC's proprietary technology for a 50,000-ton/year 1-hexene production unit, showcasing the company's capacity for independent technological development [10]. - The facility includes the first domestically designed and built 30000 cubic meter ethylene low-temperature tank, ensuring safe storage of ethylene at ultra-low temperatures [19]. Production and Environmental Impact - Upon full operation, the project is expected to reduce refined oil output by 3.49 million tons annually while increasing chemical product output by 3.06 million tons, addressing domestic supply gaps in functional rubber, high-end polyolefins, and advanced membrane materials [23]. - The project achieves 100% green electricity for its new power consumption, with energy consumption metrics for refining and ethylene units exceeding national benchmark standards, aligning with national green and low-carbon development goals [23]. Market and Economic Implications - The project is set to transform Guangxi's industrial landscape from basic chemicals to high-end chemical new materials, leveraging the Western Land-Sea New Corridor to expand market reach into Southwest China, South China, and ASEAN markets [23]. - It aims to create a trillion-yuan green chemical new materials industry cluster, stimulating downstream industries such as packaging, construction materials, and automotive sectors, fostering a "leading role and cluster development" industrial ecosystem [23].
国家能源局:全国可再生能源新增装机3.10亿千瓦
Zhong Guo Dian Li Bao· 2025-10-31 10:01
Core Insights - The National Energy Administration held a press conference to discuss the renewable energy grid operation situation for the first three quarters of the year, emphasizing the commitment to carbon peak and carbon neutrality goals [1] Renewable Energy Capacity Expansion - The installed capacity of renewable energy reached nearly 2.2 billion kilowatts, with wind and solar power exceeding 1.7 billion kilowatts [2] - In the first three quarters, the newly added renewable energy capacity was 31 million kilowatts, a year-on-year increase of 47.7%, accounting for approximately 84.4% of the total new capacity [2] - By the end of September, the total installed capacity of renewable energy was 2.198 billion kilowatts, a year-on-year increase of 27%, representing 59.1% of the total power generation capacity in China [2] Renewable Energy Generation Growth - Renewable energy generation increased steadily, accounting for about 60% of industrial electricity consumption [3] - The total renewable energy generation reached 2.89 trillion kilowatt-hours, a year-on-year increase of 15.5%, making up around 40% of total generation [3] - Wind and solar power generation combined reached 1.73 trillion kilowatt-hours, a year-on-year increase of 28.3%, representing 22% of total electricity consumption [3] Hydropower Development - In the first three quarters, the newly added hydropower capacity was 7.16 million kilowatts, with a total installed capacity of 443 million kilowatts by the end of September [3] - The cumulative hydropower generation was 997.1 billion kilowatt-hours, with an average utilization hour of 2,551 hours [3] Wind Power Development - The newly added wind power capacity was 61.09 million kilowatts, with a total installed capacity of 582 million kilowatts by the end of September [4] - The cumulative wind power generation was 813.7 billion kilowatt-hours, a year-on-year increase of 14.3%, with an average utilization rate of 94.0% [4] Solar Power Development - The newly added solar power capacity was 240 million kilowatts, with a total installed capacity of 1.125 billion kilowatts by the end of September [4] - The cumulative solar power generation was 916.3 billion kilowatt-hours, a year-on-year increase of 44.1%, with a utilization rate of 94.7% [4] Biomass Power Development - The newly added biomass power capacity was 1.05 million kilowatts, with a total installed capacity of 46.94 million kilowatts by the end of September [4] - The biomass power generation reached 166 billion kilowatt-hours, a year-on-year increase of 8.3% [4]
510亿!国家电投、华润、中煤等出资投向未来能源
Zhong Guo Dian Li Bao· 2025-10-31 09:04
Group 1 - The Central Enterprise Strategic Emerging Industry Development Fund, initiated by the State-owned Assets Supervision and Administration Commission (SASAC), has raised 51 billion yuan for its first phase, with contributions from major state-owned enterprises [1][2] - The fund aims to support state-owned enterprises in addressing industrial weaknesses and enhancing innovation in strategic emerging industries such as artificial intelligence, aerospace, and quantum technology [2] - The fund has a 5-year investment period and an 8-year management and exit period, with the possibility of extending the investment period by up to 2 years, totaling 15 years [1] Group 2 - The establishment of the fund is seen as a crucial step in accelerating the development of strategic emerging industries, which is a mission entrusted to central enterprises by the Communist Party of China [2] - The fund will focus on optimizing the capital chain to better serve the industrial and innovation chains, thereby aiding the structural adjustment of the state-owned economy [2]
烟威特高压线路工程首基铁塔组立
Zhong Guo Dian Li Bao· 2025-10-31 08:08
Core Points - The first tower of the Yanwei 1000 kV UHV transmission line has been successfully assembled, marking a significant milestone in the project [1] - The project is a major national strategic initiative aimed at enhancing the power transmission capacity from nuclear and offshore renewable energy sources in the Yanwei region [1] - The successful assembly of the first tower validates the construction plan and provides valuable experience for the safe and efficient assembly of the remaining towers [1] Summary by Sections Project Overview - The Yanwei and Haiyang Xinan Nuclear Power UHV project is a key national strategic project that will serve as the main channel for power transmission from nuclear and offshore renewable energy bases in the Yanwei region [1] - Upon completion, it will help establish the first provincial UHV "dual ring network" structure in Shandong, significantly contributing to the integration of renewable energy and the development of a reliable new power system [1] Technical Details - The first tower (01S138) is located in Changle County, Weifang City, Shandong Province, with a total height of 148 meters and a weight of 235.2 tons [1] - The construction of this segment was prioritized to ensure overall project progress and safety, coordinating with the existing 500 kV Letting I and II lines [1] Safety and Coordination Efforts - The Shandong Electric Power Company has implemented comprehensive safety and quality measures to support the project [2] - The project involves collaboration among various entities, including the State Grid Shandong Construction Company and Hunan Songbian Electric, ensuring effective coordination on-site [2]