Workflow
ZZEPC(600023)
icon
Search documents
浙能电力(600023) - 全资及控股发电企业2025年度发电量完成情况公告
2026-01-13 09:15
经统计,2025 年度浙江浙能电力股份有限公司(以下简称"公司")全资 及控股发电企业按合并报表口径完成发电量 18,328,427.23 万千瓦时,上网电量 17,371,982.51 万千瓦时,同比分别上涨 5.36%和 5.47%。 证券代码:600023 证券简称:浙能电力 公告编号:2026-002 浙江浙能电力股份有限公司 全资及控股发电企业 2025 年度发电量完成情况公告 本公司董事会及全体董事保证本公告内容不存在任何虚假记载、误导性陈述或者重大遗 漏,并对其内容的真实性、准确性和完整性承担法律责任。 公司电量上升的原因主要是:(1)浙江省全社会用电量增长;(2)浙江浙 能中煤舟山煤电有限责任公司发电量增加(六横二期 3、4 号机组分别于 2024 年 7 月及 2024 年 11 月投产);(3)浙江浙能嘉华发电有限公司发电量增加(嘉 兴四期 9 号机组于 2025 年 6 月投产)。 | 分类 | 省份 | 电厂名称 | 发电量 | 上网电量 | | --- | --- | --- | --- | --- | | | | | (万千瓦时) | (万千瓦时) | | | | 台州发电厂 | ...
浙能电力:2025年完成发电量同比增长5.36%
Core Viewpoint - Zhejiang Energy Power announced an increase in power generation and grid-connected electricity for the year 2025, indicating positive growth driven by increased electricity demand in Zhejiang province and higher output from specific power plants [1] Group 1: Company Performance - The total power generation of the company's wholly-owned and controlled power generation enterprises reached 183.284 billion kilowatt-hours in 2025, representing a year-on-year increase of 5.36% [1] - The grid-connected electricity amounted to 173.72 billion kilowatt-hours, showing a year-on-year growth of 5.47% [1] Group 2: Contributing Factors - The increase in electricity generation is primarily attributed to the growth in overall electricity consumption in Zhejiang province [1] - Additional contributions came from increased power generation at Zhejiang Zhongmei Zhoushan Coal Power Co., Ltd. and Zhejiang Zheneng Jiahua Power Co., Ltd. [1]
浙能电力:2025年发电量、上网电量同比分别上涨5.36%和5.47%
Xin Lang Cai Jing· 2026-01-13 09:13
浙能电力公告称,2025年度公司全资及控股发电企业按合并报表口径完成发电量18328427.23万千瓦 时、上网电量17371982.51万千瓦时,同比分别上涨5.36%和5.47%。电量上升主因浙江省全社会用电量 增长,以及浙江浙能中煤舟山煤电、浙江浙能嘉华发电相关机组投产。公告还披露各电厂火电、光伏发 电、风力发电的发电量及上网/销售电量数据。 ...
浙能电力(600023.SH):2025年度完成发电量1832.84亿千瓦时
Ge Long Hui A P P· 2026-01-13 09:13
Core Viewpoint - Zhejiang Energy Power (600023.SH) reported an increase in electricity generation and grid-connected electricity in 2025, with generation reaching 183.284 billion kWh and grid-connected electricity at 173.72 billion kWh, representing year-on-year increases of 5.36% and 5.47% respectively [1] Group 1 - The increase in electricity generation is primarily attributed to the growth in overall electricity consumption in Zhejiang Province [1] - The commissioning of additional power generation units at Zhejiang Zhongmei Zhoushan Coal Power Co., Ltd. contributed to the rise, with units 3 and 4 of the Sixiang Phase II expected to be operational in July and November 2024 respectively [1] - Increased output from Zhejiang Jianhua Power Co., Ltd. is also a factor, with unit 9 of the Jiaxing Phase IV expected to commence operations in June 2025 [1]
2025年1-11月中国火力发电量产量为57124.6亿千瓦时 累计下降0.7%
Chan Ye Xin Xi Wang· 2026-01-13 02:57
Core Viewpoint - The report highlights a decline in China's thermal power generation, with a notable decrease in production figures for 2025 compared to previous years [1] Group 1: Industry Overview - In November 2025, China's thermal power generation output was 497 billion kilowatt-hours, representing a year-on-year decrease of 4.2% [1] - From January to November 2025, the cumulative thermal power generation output in China was 57,124.6 billion kilowatt-hours, showing a cumulative decline of 0.7% [1] Group 2: Companies Involved - Listed companies in the thermal power sector include Huaneng International (600011), Datang Power (601991), Guodian Power (600795), Huadian International (600027), Jingneng Power (600578), Zhejiang Energy (600023), Yunnan Energy Holdings (001896), Sheneng Co. (600642), Jingtou Energy (000600), and Anhui Energy (000543) [1] Group 3: Research and Analysis - The report titled "2026-2032 China Thermal Power Industry Market Panorama Survey and Investment Potential Research Report" was published by Zhiyan Consulting, a leading industry consulting firm in China [1] - Zhiyan Consulting has over a decade of experience in industry research, providing comprehensive industry solutions to empower investment decisions [1]
浙能集团:再创历史新高!
Xin Lang Cai Jing· 2026-01-12 12:29
Core Viewpoint - Zhejiang Energy Group achieved record-high energy supply in 2025, with total power generation of 211.5 billion kWh, coal supply of 75.23 million tons, gas supply of 14.9 billion cubic meters, and heat supply of 138.16 million GJ, all showing year-on-year growth, demonstrating high-quality energy security [1][14]. Group 1: Energy Supply Achievements - In 2025, Zhejiang Energy Group's total power generation reached 211.5 billion kWh, marking a historical high [1][14]. - The company supplied 75.23 million tons of coal and 14.9 billion cubic meters of gas, both of which also saw significant year-on-year increases [1][14]. - The heat supply amounted to 138.16 million GJ, contributing to the overall energy security [1][14]. Group 2: Project Development and Capacity Expansion - Zhejiang Energy Group focused on major project construction, completing nearly 5 million kW of new installed capacity in the past year [3][16]. - Key projects included the expansion of the Taizhou Power Plant, Jiaxing Power Plant, and the renovation of the Zhenhai natural gas power plant, all of which feature advanced emission reduction technologies [3][16]. - The completion of these projects has enhanced the stability and safety of energy supply, supporting local economic development [3][16]. Group 3: Operational Efficiency and Reliability - During peak summer demand, Zhejiang Province experienced record-high electricity loads, with Zhejiang Energy Group's power generation units playing a crucial role in meeting this demand [5][18]. - The company implemented strategies to improve equipment reliability and enhance load capacity, ensuring maximum output from coal power units [5][18]. - Management focused on reducing non-scheduled outages and addressing output constraints, contributing to stable energy supply [5][18]. Group 4: Fuel Supply and Infrastructure - Zhejiang Energy Group's fuel supply strategy, leveraging a complete industrial chain, ensured effective coal supply to power plants [7][20]. - The company achieved record coal import volumes of 15 million tons and throughput of 30 million tons at its port, both marking new highs since its establishment [7][20]. - The natural gas division established a comprehensive supply system, optimizing energy structure and enhancing public welfare [11][24]. Group 5: Green Energy Transition - Zhejiang Energy Group is accelerating its green transition, focusing on offshore wind power and renewable energy projects [11][24]. - The company successfully integrated solar power projects, achieving a twofold increase in renewable energy capacity compared to the end of the 13th Five-Year Plan [11][24]. - The LNG receiving station in Wenzhou set a record for peak output, ensuring sufficient supply during high-demand periods [11][24]. Group 6: Winter Preparedness - As winter approaches, Zhejiang Energy Group is refining its strategies for power generation, coal supply, gas supply, and heating [13][26]. - The company is prioritizing equipment safety and risk management while optimizing coal supply and transportation scheduling [13][26]. - These efforts aim to enhance supply capabilities and ensure stable energy access for the community during winter [13][26].
2025年1-11月中国核能发电量产量为4365.6亿千瓦时 累计增长8.1%
Chan Ye Xin Xi Wang· 2026-01-12 03:16
Core Viewpoint - The report highlights the growth of China's nuclear power generation, indicating a positive trend in the industry with significant year-on-year increases in output [1]. Group 1: Industry Overview - In November 2025, China's nuclear power generation reached 39.8 billion kilowatt-hours, representing a year-on-year growth of 4.7% [1]. - From January to November 2025, the cumulative nuclear power generation in China was 436.56 billion kilowatt-hours, showing an 8.1% increase compared to the previous year [1]. Group 2: Companies Involved - Listed companies in the nuclear power sector include China General Nuclear Power (003816), China National Nuclear Power (601985), Sheneng Co., Ltd. (600642), Zhejiang Energy Power (600023), Hubei Energy (000883), Huaneng International (600011), Datang Power (601991), Jiangsu Guoxin (002608), China Nuclear Technology (000777), and Funiu Co., Ltd. (600483) [1]. Group 3: Market Research - The report titled "2026-2032 China Nuclear Power Industry Market Development Scale and Investment Opportunity Analysis" by Zhiyan Consulting provides insights into the market trends and investment opportunities in the nuclear power sector [1].
浙江浙能电力股份有限公司 关于变更职工董事的公告
浙江浙能电力股份有限公司(以下简称"公司")近日收到公司职工董事陈统钱的书面辞职报告,陈统钱 因年龄原因申请辞去职工董事职务。 ■ 证券代码:600023 证券简称:浙能电力 公告编号:2026-001 浙江浙能电力股份有限公司 关于变更职工董事的公告 本公司董事会及全体董事保证本公告内容不存在任何虚假记载、误导性陈述或者重大遗漏,并对其内容 的真实性、准确性和完整性承担法律责任。 一、职工董事离任情况 根据《公司法》《公司章程》等有关规定,经公司职工代表大会选举,吴皓担任公司第五届董事会职工 代表董事,任期自2026年1月9日当选之日起至本届董事会任期届满日止。 特此公告。 浙江浙能电力股份有限公司董事会 2026年1月10日 附简历: 吴皓,1971年10月出生,汉族,中共党员,高级工程师,现任公司党委书记、工会主席,曾任公司副总 经理、党委委员。 二、离任对公司的影响 根据《公司法》和《公司章程》的相关规定,陈统钱辞去职工董事职务不会影响公司生产经营工作的正 常进行,辞职报告自送达董事会之日起生效。 三、选举职工董事情况 ...
再创历史新高!2025年浙能实现高质量能源保供
Core Viewpoint - Zhejiang Energy Group achieved record-high power generation and energy supply in 2025, with a total power generation of 211.5 billion kWh, coal supply of 75.23 million tons, gas supply of 14.9 billion cubic meters, and heat supply of 138.16 million GJ, all showing year-on-year growth, demonstrating high-quality energy supply capabilities [1][3]. Group 1: Energy Supply Achievements - In 2025, Zhejiang Energy Group's total power generation reached 211.5 billion kWh, marking a historical high [1]. - The company completed nearly 5 million kW of new installed capacity, contributing to the energy supply stability and safety [3]. - The group successfully launched several major projects, including the expansion of existing power plants and the construction of new units, all designed to meet leading domestic standards for coal consumption and emissions [3]. Group 2: Operational Efficiency - During peak summer demand, Zhejiang Energy Group's power generation units played a crucial role in ensuring energy supply, effectively managing equipment reliability and load capacity [4]. - The company implemented a comprehensive management strategy to enhance equipment reliability and address output constraints, ensuring maximum generation capacity [4]. Group 3: Fuel Supply and Infrastructure - Zhejiang Energy Group's fuel supply strategy, supported by a complete industrial chain, ensured effective coal supply to power plants, achieving record throughput at its port facilities [6]. - The company met its annual targets for coal import and throughput, reaching 15 million tons and 30 million tons respectively, both setting new records [6]. Group 4: Natural Gas and Renewable Energy - The natural gas division established a comprehensive supply system, optimizing the energy structure and enhancing public welfare [9]. - The Wenzhou LNG receiving station set a record for peak output, ensuring sufficient supply during high-demand periods [9]. - The company is advancing its green transition by expanding renewable energy projects, achieving a twofold increase in renewable energy installed capacity compared to the end of the 13th Five-Year Plan [9]. Group 5: Winter Preparedness - As winter approaches, the company is focusing on detailed deployment across power generation, coal supply, gas supply, and heating to enhance supply capabilities and ensure stable energy for the public [10].
浙能电力(600023) - 关于变更职工董事的公告
2026-01-09 08:30
一、职工董事离任情况 证券代码:600023 证券简称:浙能电力 公告编号:2026-001 浙江浙能电力股份有限公司 关于变更职工董事的公告 本公司董事会及全体董事保证本公告内容不存在任何虚假记载、误导性陈述或者重大遗 漏,并对其内容的真实性、准确性和完整性承担法律责任。 根据《公司法》《公司章程》等有关规定,经公司职工代表大会选举,吴皓 担任公司第五届董事会职工代表董事,任期自 2026 年 1 月 9 日当选之日起至本 届董事会任期届满日止。 浙江浙能电力股份有限公司(以下简称"公司")近日收到公司职工董事陈 统钱的书面辞职报告,陈统钱因年龄原因申请辞去职工董事职务。 | 姓名 | 离任职务 | 离任时间 | 原定任期到期日 | 离任原因 | 是否继续在 公司及其控 | 具体职务 | 是否存在 未履行完 | | --- | --- | --- | --- | --- | --- | --- | --- | | | | | | | 股子公司任 | | 毕的公开 | | | | | | | 职 | | 承诺 | | 陈统钱 | 职工董事 | 2026 年 1 月 8 日 | 2027 年 8 月 19 日 ...