Workflow
西部陆海新通道
icon
Search documents
广西马皇站完成阶段改造 西部陆海新通道“咽喉”扩能
Zhong Guo Xin Wen Wang· 2025-07-29 17:41
马皇站是南防铁路既有区段站,南防、黎钦、钦北三条铁路出海大通道在此交会,日均接发列车约130 列,广西沿海铁路90%以上的货物到发均需经此周转,是西部陆海新通道铁海联运班列进出北部湾港的 重要"咽喉"。近些年,随着班列运输需求快速攀升,沿海铁路扩能改造迫在眉睫。 中新网钦州7月29日电(罗婕陈宙吴柯荣)7月29日,在广西钦州市钦北区马皇火车站,随着一列货物列车 有序驶过新铺就的股道,标志着作为广西沿海铁路货运"咽喉"的马皇站完成第一阶段站改施工,西部陆 海新通道关键节点扩能升级实现重大突破。 为确保马皇站站改施工顺利开展,广西沿海铁路公司、沿海铁路工程建设指挥部组织施工单位中铁三局 利用列车运行间隙开展施工,搭配智能监测系统24小时值守,筑牢安全防线。同时,临时拓宽加固3条 乡间道路,调配20余辆小型转运车构建"微循环"运输网,日均完成土方转运超8000立方米,畅通施工材 料运输。 随着马皇站第一阶段施工完成,钦防二线、钦港二线架梁通道也随之打通,也为车站后续第二、三阶段 新建黎钦下行线、南防线大垌至马皇段等施工奠定基础。站改施工全部完成后,预计马皇站列车通过能 力将提升25%,站场接发车、调车作业区域划分更 ...
上半年甘肃国际物流集团实现多个“首发”
Sou Hu Cai Jing· 2025-07-27 03:57
Group 1 - The core viewpoint of the news is that Gansu International Logistics Group has significantly enhanced its international trade operations, achieving a trade volume of 1.243 billion yuan, which represents a year-on-year increase of 52.2% [2] - The company has launched several "firsts" in its logistics operations, including the first all-cargo flight route for beef and lamb between Lanzhou and Beijing, and the first international cargo flight route from Lanzhou to Tashkent scheduled for 2025 [2] - Gansu International Logistics Group is actively integrating its logistics capabilities with local industries, such as metallurgy, coal, and agriculture, to optimize resource allocation and market expansion for provincial enterprises [3] Group 2 - The establishment of an overseas warehouse in Peru has allowed the company to import 9,100 tons of silver concentrate, generating over 98 million yuan in foreign exchange, marking a new highlight in its international development [3] - The company is focusing on creating high-quality logistics routes under the Belt and Road Initiative and developing high-end steel export demonstration projects to enhance its global connectivity [3] - Gansu International Logistics Group is exploring a new model of "logistics driving trade, trade driving industry, and industry supporting logistics" by integrating logistics, processing, and distribution within the Lanzhou New Area [3]
甘肃电气集团兰电股份持续优化市场布局 上半年产品出口实现强劲增长
Sou Hu Cai Jing· 2025-07-25 07:56
Core Viewpoint - Gansu Electric Group Landean Co., Ltd. has achieved significant growth in international trade, responding to the Belt and Road Initiative and expanding its overseas market presence, with exports exceeding 36 million yuan in the first half of the year [1][2]. Group 1: International Market Expansion - The company has provided products and services to over 10 countries and regions, with direct and indirect export amounts surpassing 36 million yuan [1]. - A surge in international client visits has occurred, with over ten major international clients expressing preliminary cooperation intentions [1]. - During the Gansu Province New Energy and Equipment Import and Export Negotiation Conference, the company engaged in one-on-one discussions with over 30 overseas business representatives, enhancing its international network [1]. Group 2: Strategic Initiatives - The company has developed an "integrated" overseas market expansion strategy, focusing on collaboration across marketing, technology, production, and quality control to enhance international cooperation in the electric motor sector [2]. - By joining the International Chamber of Commerce Alliance and being listed among Chinese oil and gas material and equipment production and export enterprises, the company is leveraging partnerships with major state-owned enterprises to boost exports [2]. - The company has adopted a mixed export model of "direct + indirect + agency/distribution," achieving exports of 36.22 million yuan in the first half of the year, nearing the total expected for 2024 [2]. Group 3: Future Directions - The company aims to integrate deeply into the Belt and Road Initiative and the Western Land-Sea New Corridor, creating a multi-dimensional market structure that connects domestic and international efforts [3]. - There is a focus on overcoming key technological barriers and enhancing product competitiveness to adapt to the new international market landscape [3].
“钢铁巨臂”架右江 百色升船机破西南“通江达海”难题
Zhong Guo Xin Wen Wang· 2025-07-24 11:20
Group 1 - The project is a significant engineering endeavor located in Baise, Guangxi, aimed at solving the shipping bottleneck in Southwest China by constructing the world's largest all-balance cableway ship lift [1][2] - The total investment for the project is approximately 5.017 billion yuan, supported by multiple national and regional authorities, and it will enhance the navigational capacity of the right river from 300 tons to 1,000 tons, ending a 20-year navigation halt due to the construction of Baise Reservoir [2][3] - The project will create a "dry and branch linkage" shipping network, facilitating material flow between Southwest China and the Guangdong-Hong Kong-Macao Greater Bay Area, and providing a new waterway connection to ASEAN [2][3] Group 2 - The completion of the ship lift is expected to reduce transportation costs by over 30% and cut transportation time by 50%, significantly benefiting local industries and potentially upgrading over 500 enterprises along the route [3] - The project promotes an "industrial + ecological" tourism model, linking the ship lift with local attractions to create a new tourism circuit that combines industrial marvels with ecological sightseeing [3][5] - The project is designed with a focus on green development, as water transport can reduce energy consumption by over 60% compared to road and rail transport, contributing to carbon emission reductions [5][6] Group 3 - The construction of the ship lift in the unique karst landscape presents significant engineering challenges, requiring advanced technology to ensure the stability and safety of the lift system [6] - The project has achieved multiple world-class technological breakthroughs, including the development of a gravity balance drum that surpasses foreign technology, enhancing precision and safety [6] - The application of intelligent technology, such as a monitoring system and a cloud-based platform for component traceability, highlights the innovative practices in the construction process [6]
陈刚:以对人民对历史对工程负责的态度,高标准高质量高水平建设平陆运河“三大工程”
Guang Xi Ri Bao· 2025-07-24 01:57
Core Points - The meeting emphasized the importance of high standards, quality, and level in the construction of the Pinglu Canal's "three major projects" [1][2] - The construction of the Pinglu Canal is crucial for the connectivity of Guangxi and the southwestern region, impacting long-term development along the new western land-sea corridor [1][2] Group 1 - The meeting highlighted the need to maintain focus on construction milestones and adopt a problem-oriented approach to address issues that arise during the construction process [2] - It was stressed that the roles of the quality engineering inspection expert group, green engineering inspection expert group, and integrity supervision and guidance group should be fully utilized to ensure compliance and accountability [2] - The meeting called for the simultaneous planning of logistics hub construction alongside the Pinglu Canal, including port, terminal, and industrial park facilities [2] Group 2 - The ecological protection of the canal is a priority, with plans for monitoring water environment conditions and addressing potential risks [2] - The economic belt development along the Pinglu Canal is to be actively planned, promoting integrated development across the entire watershed [2]
工行北海分行:创新金融服务 赋能向海经济高质量发展
Group 1: Financial Support for Marine Economy - The company actively implements the national marine power strategy, providing innovative financial services to support the high-quality development of the marine economy, with a financing balance exceeding 2.2 billion yuan by June 2025, an increase of 1.4 billion yuan from the beginning of the year [1] - The company addresses the financing difficulties of small and micro enterprises in the marine industry by promoting inclusive products like "Operating Quick Loan" and "Aquaculture e-loan," resulting in a 73.5% increase in loans for aquaculture and wholesale retail by June 2025 [1] Group 2: Support for Western Land-Sea New Corridor - The company focuses on upgrading transportation hubs to support the construction of the Western Land-Sea New Corridor, with a loan balance exceeding 800 million yuan for related projects by June 2025 [2] - The company has established a regular visiting mechanism to meet the seasonal funding needs of marine logistics enterprises, leading to a 24.8% increase in working capital loans for these enterprises by June 2025 [2] Group 3: Empowering Marine Industry Clusters - The company targets key industrial platforms like Tieshan Port (Linhai) Industrial Zone and Tieshan East Port Industrial Park, providing tailored financial solutions for industries such as green chemicals and high-end paper manufacturing [3] - The company employs a three-dimensional collaborative service model to enhance the resilience of industrial chains, including vertical support for power generation companies and horizontal collaboration with logistics enterprises [3] - The company plans to continue increasing financial support for the marine economy and optimizing financial service models for marine industry chains to contribute to regional economic development [3]
隆黄铁路隆叙段扩改项目铺轨架梁收官,预计年底通车
news flash· 2025-07-22 14:54
Core Viewpoint - The completion of the main line and track-laying tasks for the Longhuang Railway's Longchang to Xuyong section marks a significant milestone, paving the way for the railway to open by the end of this year [1] Group 1: Project Overview - The Longhuang Railway's Long-Xu section expansion and renovation project is part of the Western Land-Sea New Corridor's western main channel [1] - The railway line starts from Longchang Station on the Chengyu Railway, passes through Longchang City and Luzhou City, crosses the Tuojiang and Yangtze Rivers, and ends at the Xuyong North Station of the completed Xuyibi Railway [1] - The total length of the railway line is 138.6 kilometers, with a designed speed of 120 kilometers per hour and 11 stations planned [1] Group 2: Historical Context - The existing railway from Longchang to Xuyong was constructed in segments, completed in 1992, 2007, and 2009, with a total length of 161 kilometers [1] - The Longhuang Railway's Long-Xu section expansion project employs a "cutting curves to straighten" method, increasing the design speed from 80 kilometers per hour to 120 kilometers per hour [1]
今年上半年,我国西部地区外贸进出口总值达2.12万亿元,同比增长10.4%
news flash· 2025-07-21 02:29
今年上半年,我国西部地区外贸进出口总值达2.12万亿元,同比增长10.4%,创历史同期新高。西藏自 治区物流效率提升50%,对"一带一路"国家进出口32.7亿元、同比增长18.1%。四川以5190.9亿元领跑西 部,成都国际及地区定期客货运航线增至80余条。西安国际港站中欧班列(西安)连接欧洲25个国家220 多个城市、亚洲11个国家100多个城市。中老铁路进出口货值突破128亿元,跨境货物品类由500余种扩 展至3000余种。重庆电子信息产业成外贸增长引擎,西部陆海新通道沿线13+2省区市经新通道进出口 超4567亿元,同比增长17.1%。贵州轮胎(000589)5G智慧工厂加快产品高端化、国际化。新疆进出口 总值超2808亿元,同比增长28%。海关将继续支持西部口岸、综合保税区等开放平台建设,助力企业开 拓国际市场。(央视新闻) ...
那蒙澄碧河特大桥上部主体结构施工 黄百铁路建设再提速
Huan Qiu Wang· 2025-07-19 07:19
Core Viewpoint - The construction of the Huangbai Railway, a significant project under China's national strategy, is progressing rapidly, with a total investment of 338 billion yuan, aimed at enhancing regional economic development and connectivity in the western region [1][4]. Infrastructure Investment - In the first half of the year, China's infrastructure investment grew by 4.6% year-on-year, with major projects like the Huangbai Railway playing a crucial role in this growth [1]. - The Huangbai Railway, which is over 310 kilometers long and designed for a speed of 160 km/h, is expected to be completed and operational by 2028 [4]. Economic Impact - The railway will benefit approximately 1.2 million people along its route and is expected to significantly boost industries such as stone, tea, and sugarcane, providing the shortest freight route from Sichuan and Chongqing to the Beibu Gulf Port [6]. - The completion of the Huangbai Railway will enhance the transportation efficiency of goods from the western region to coastal areas, facilitating faster access to national markets for local products [6][13]. Project Progress - As of now, 29 out of 33 tunnels in the Guangxi section of the Huangbai Railway have begun construction, with a total investment of 145.45 billion yuan for this section [7]. - Since the project commenced in December 2023, 33 billion yuan has been invested, accounting for 22.7% of the total investment [7]. Connectivity and Accessibility - The Huangbai Railway will transform the transportation landscape in the region, connecting previously isolated areas and improving travel convenience for residents [11]. - The railway will serve as a vital economic corridor, shortening transportation distances and enhancing the efficiency of resource movement to the Beibu Gulf Port, thereby integrating the western region into the global trade system [13].
那蒙澄碧河特大桥施工提速 推动贵州广西铁路建设加速
news flash· 2025-07-19 06:09
Core Viewpoint - The Huangtong to Baise Railway is a significant project in the Western Land-Sea New Corridor, with construction in Guangxi accelerating and expected to enhance economic development along the route [1] Group 1: Project Overview - The railway spans a total length of 310 kilometers, accommodating both freight and passenger transport [1] - The project is projected to be completed and operational by 2028 [1] - The total investment for the project is estimated at 33.8 billion yuan, with 2.27 billion yuan already invested, representing 22.7% of the total [1] Group 2: Economic Impact - Upon completion, the railway will serve as the shortest freight transport route from Guizhou to Beibu Gulf Port, significantly improving transportation efficiency in the western region [1] - The project is expected to boost economic vitality along the railway corridor and optimize the transportation network [1]