Workflow
创新指数
icon
Search documents
9月17日·上海早新闻
Sou Hu Cai Jing· 2025-09-16 22:34
上海天气:28~35℃,多云到晴转阴有时有阵雨或雷雨 谈天 上海今天上午依旧以晴热为主,最高气温仍可达35℃。下午起受冷暖空气共同影响,将有一次较为明显的降水过程,局部地区雨量可达大雨到暴雨。 雨水打压下,明天降温明显。海上对流活动活跃,上海在本周中后期主要受偏东气流影响,多阵雨天气,气温保持在25~31℃。 关注 从去年开始,凉城新村街道社区长者食堂推出"盲盒晚餐",将每天卖剩下的菜肴以10元低价出售,荤素随机,不能挑选。"盲盒"既为市民带来了实惠,又 是对食物的一种尊重。 本月起,上海的观众可以用上海话通过AI搜索超高清电视节目了。昨天,"东方有线超高清AI升级行动"在沪启动,东方有线即日起在全市开展超高清AI 机顶盒入户更新工作。 一览 近日,沪上首例青少年双肺移植联合手术成功,开创了上海"特发性肺动脉高压伴 POTTS 分流术后"患儿肺移植的先河。 昨天上午,"九三阅兵"后首批上海新兵从上海火车站奔赴军营。 张江人工智能创新小镇昨天在张江科学会堂正式启幕。推介会首次全面公布张江AI小镇的整体规划、应用场景与创新生态体系。 上海地震台网正式测定:9月16日12时40分,在上海松江区(北纬31.04度,东 ...
城市24小时 | 直达湾区,又一条“能源大动脉”来了
Mei Ri Jing Ji Xin Wen· 2025-09-16 16:04
Core Points - The construction mobilization meeting for the ±800 kV UHVDC project from Tibet to the Guangdong-Hong Kong-Macao Greater Bay Area was held on September 16, marking the start of the world's largest flexible DC transmission project [1][4] - The project will connect four converter stations in Tibet and Guangdong, aggregating over 20 million kW of clean energy, providing a strong green low-carbon energy guarantee for the region [1][4] - The total investment for the project is approximately 53.2 billion yuan, with an additional investment of over 150 billion yuan for supporting clean energy infrastructure [4] Energy Demand and Supply - In July, Guangdong's electricity consumption reached 531.52 billion kWh, a year-on-year increase of 4.3%, with the highest load reaching 165 million kW, accounting for 11% of the national load [2][4] - The total electricity consumption in China for the year reached 1.02 trillion kWh in July, marking an 8.6% year-on-year increase [1][2] Economic Impact - The project is expected to create over 100,000 direct jobs during peak construction and significantly boost the upstream and downstream equipment industries [4] - Since 2015, the cumulative electricity export from Tibet has reached 15.79 billion kWh, generating over 4.2 billion yuan in economic benefits for the region [2] Strategic Importance - The UHVDC project is seen as a key move in optimizing national energy resource allocation, breaking regional barriers, and achieving precise alignment between resources and markets [4] - The project will enable the delivery of over 43 billion kWh of clean energy annually to the Greater Bay Area, equivalent to half the annual output of the Three Gorges Dam [4]