Workflow
特高压工程
icon
Search documents
一个月全国用了1万亿度电,破人类记录!网友自豪算账:比十年前翻一番,这些电都用在哪了?
Sou Hu Cai Jing· 2025-08-24 04:06
2025年7月,全国单月用电量首次突破10,226亿千瓦时,这个数字有多震撼? 它相当于东盟国家全年的用电量总和(2023年东盟十国全年发电量约1.1万亿度),而中国仅用一个月就达到了这一规模。 更惊人的是,这一数字比2015年7月的5,031亿千瓦时整整翻了一番,十年间中国用电规模实现了指数级跨越。 网友@电工李哥感叹: "十年前我在车间数电表,一个月才几千度;现在一条芯片封装线一天就上万度!" 这种翻天覆地的变化,既是中国经济腾飞的缩影,也是全球能源格局重塑的起点。 官方原声:用电量十年翻番 国家能源局2025年1月发布的数据显示,2024年全社会用电量达98,521亿千瓦时,同比增长6.8%,其中7月单月10,226亿千瓦时的峰值尤为瞩目 。 中电联报告指出,以2020年为基期,2024年全行业用电指数增长29.5%,年均增幅6.7%。 这组数据背后,是中国经济稳中向好的基本面——高技术及装备制造业用电量增速连续四年领跑,互联网、充换电等新兴产业更是以年均超20%的速度增 长,成为拉动用电需求的核心引擎。 网友@数据小马甲直言:"官方盖章,十年翻倍,牛!" 1万亿度电花在哪?——官方分项账本 (一)第一 ...
总里程已突破5万公里!“十四五”期间我国特高压工程加快建设
Core Viewpoint - The "Ningdian into Hunan" project is a key initiative in China's 14th Five-Year Plan for power development, accelerating the construction of UHV projects and promoting green energy development in the country [1][5]. Group 1: UHV Project Development - Since the beginning of the 14th Five-Year Plan, significant UHV projects such as "Longdian into Shandong" and "Xinjiang into Chongqing" have been put into operation, with the "Ningdian into Hunan" project recently commencing power transmission [1]. - The State Grid has completed and put into operation over 41 UHV projects, with a total transmission capacity exceeding 350 million kilowatts, representing a 30% increase from 270 million kilowatts at the end of the 13th Five-Year Plan [1][3]. Group 2: Investment and Infrastructure - During the 14th Five-Year Plan period, total investment in UHV projects in China has exceeded 380 billion yuan, with 19 UHV projects under construction [5]. - The total length of UHV projects in China has surpassed 50,000 kilometers, equivalent to more than one lap around the Earth's equator [5]. Group 3: Clean Energy Integration - A notable trend in China's UHV construction is the establishment of UHV projects originating from clean energy bases in regions such as Southwest and Shale Gas areas, with over 60% of UHV projects connected to clean energy sources [3]. - The scale of renewable energy connected to operational UHV projects has exceeded 1.3 billion kilowatts [3].