Workflow
CH ENERGY ENG(601868)
icon
Search documents
武汉土拍,超百轮竞价、最高溢价率54.36%!
券商中国· 2025-07-01 01:58
Core Viewpoint - The article discusses the recent land auctions in various Chinese cities, highlighting the competitive bidding and pricing trends in the residential land market. Group 1: Wuhan Land Auction - On June 30, Wuhan auctioned 5 residential land parcels, with 3 sold at the base price and 2 at a premium, totaling 28.997 billion yuan [2][6]. - The most competitive parcel in Jiang'an District attracted at least 11 bidders, with Green City winning it for 6.645 billion yuan, resulting in a floor price of 27,920 yuan per square meter and a premium rate of 54.36% [2][7]. - A parcel in Wuchang District was won by Jianfa for 12.202 billion yuan, with a floor price of 16,055 yuan per square meter and a premium rate of 22% [8]. Group 2: Chengdu Land Auction - Chengdu auctioned 1 residential land parcel in Jin Niu District, which attracted 8 bidders, ultimately won by China Energy Construction for a floor price of 20,200 yuan per square meter, totaling 17.48 billion yuan with a premium rate of 23.93% [3][10]. Group 3: Tianjin Land Auction - Tianjin conducted an auction for 15 residential land parcels, with a total transaction amount of 87.77 billion yuan [11]. - A parcel in Hexi District was acquired by China Overseas for 7.4 billion yuan, with a floor price of 21,002 yuan per square meter and a premium rate of 11.45%. The remaining 14 parcels were sold at the base price [12]. Group 4: Guangzhou Land Auction - Guangzhou auctioned 2 residential land parcels, both sold at the base price, totaling 24.96 billion yuan [5][13]. - The Baiyun District parcel was acquired by Guangzhou Metro Group at a base price of 21.83 billion yuan, with a floor price of 19,000 yuan per square meter, and the Liwan District parcel was won by Jixun Real Estate for 3.13 billion yuan, with a floor price of 30,000 yuan per square meter [14][15].
大型建筑央企高层变动,中国能建董事长宋海良辞职
Di Yi Cai Jing Zi Xun· 2025-06-30 13:37
Group 1 - Recent news confirmed high-level personnel changes in infrastructure central enterprises, specifically at China Energy Construction (601868.SH) [1] - On June 30, China Energy Construction announced that Song Hailiang resigned from his positions as Chairman, Executive Director, and other roles due to work transfer, with Vice Chairman Ni Zhen taking over his responsibilities [1][2] - Song Hailiang's departure will not affect the company's daily operations, as he has completed the necessary handover [2] Group 2 - China Energy Construction was established in 2014 and is a joint-stock company initiated by China Energy Construction Group, a state-owned enterprise, and its subsidiaries [2] - The company has a diverse business scope, including traditional energy, renewable energy, water conservancy, ecological protection, transportation, municipal projects, real estate, and capital finance [2] - In 2024, China Energy Construction achieved new contract signings of 1,408.876 billion yuan, a year-on-year increase of 9.75%, with operating revenue of 436.713 billion yuan, up 7.56%, and a total profit of 15.128 billion yuan, growing by 7.97% [2] Group 3 - Song Hailiang has a long career in the industry, having previously held significant positions in the China Communications Construction Group and Shanghai Zhenhua Heavy Industries [3] - He served as the Chairman of China Communications Construction Group from 2018 to 2020 before moving to China Energy Construction [3] - Recent market rumors suggest that Song Hailiang may take on a new role as the Party Secretary and Chairman of China Communications Construction Group, following a management reshuffle [3]
中国能建(601868) - 中国能源建设股份有限公司关于董事长变动的公告
2025-06-30 10:45
中国能源建设股份有限公司(以下简称公司)于近日收到公 司董事长宋海良先生的书面辞职报告,因工作调动,宋海良先生 辞去公司第三届董事会董事长、执行董事、董事会战略委员会主 任、董事会提名委员会主任等职务。 二、离任对公司的影响 根据《公司章程》,在选举产生新任董事长之前,由公司副 董事长倪真先生代行董事长、法定代表人职责。宋海良先生已按 照公司相关规定做好交接工作,其辞任不会影响公司日常经营活 | | | 中国能源建设股份有限公司 关于董事长变动的公告 本公司董事会及全体董事保证本公告内容不存在任何虚假 记载、误导性陈述或者重大遗漏,并对其内容的真实性、准确性 和完整性承担法律责任。 1 姓名 离任职务 离任 时间 原定任期 到期日 离任 原因 是否继续 在上市公 司及其控 股子公司 任职 是否存 在未履 行完毕 的公开 承诺 宋海良 董事长、 执行董事、 董事会战略 委员会主任、 董事会提名 委员会主任 2025 年 6月30日 第三届董事 会任期届满 止 工作 变动 否 否 一、提前离任的基本情况 动。宋海良先生已确认与公司第三届董事会和公司以及其他董事 之间无任何意见分歧,且无任何与辞职有关的事项需提请公 ...
中国能建:董事长宋海良因工作调动辞职
news flash· 2025-06-30 10:24
Core Viewpoint - China Energy Engineering Corporation (601868) announced the resignation of Chairman Song Hailiang due to job relocation, with no disagreements among the board members [1] Group 1 - Song Hailiang has resigned from multiple positions including Chairman of the Third Board, Executive Director, and Chairman of the Board's Strategic and Nomination Committees [1] - Vice Chairman Ni Zhen will temporarily assume the responsibilities of Chairman and legal representative until a new chairman is elected [1] - Song Hailiang confirmed that his resignation will not affect the company's daily operations [1]
广东东莞高埗燃气热电联产改扩建项目二期工程全面建成
Core Insights - The Guangdong Dongguan Gaobu Gas-fired Combined Heat and Power (CHP) Project Phase II has successfully completed a 168-hour full-load trial operation and has been officially handed over for production [1][3] - The project includes the construction of two 470 MW gas-steam combined cycle units, which are key to the energy supply planning during the 14th Five-Year Plan period in Guangdong Province [3] Group 1 - The project team from Anhui Electric Power Construction No. 2 Company demonstrated professional advantages through comprehensive planning, scientific management, and meticulous construction, enhancing safety and quality control capabilities [3] - Eight specialized groups were established to implement a standardized management system for temporary electricity use, conducting a total of 248 safety inspections and maintaining a safety production record for over 1,000 days [3] - Innovative construction methods were employed, such as the "bottom plate prefabrication + hoisting" approach to mitigate collapse risks in areas with quicksand [3] Group 2 - The project is located in the Weimei Ceramics Industrial Park, covering an area of 11.47 hectares, and aims to increase Dongguan's electricity self-sufficiency while supporting the green and low-carbon development of the region [3] - Upon full completion, the two units are expected to generate approximately 3.3 billion kWh of electricity and provide 5.83 million GJ of heat annually, contributing to the dual carbon goals of the Guangdong-Hong Kong-Macao Greater Bay Area [3]
碳中和ETF基金(159885)多只成分股飘红,中国能建400MW风电项目获核准
Xin Lang Cai Jing· 2025-06-26 03:16
Group 1 - The China Securities Low-Carbon Economy Theme Index (000977) has shown a slight increase of 0.07% as of June 26, 2025, with notable gains in constituent stocks such as Enjie Co., Ltd. (002812) up 4.47%, Daqo New Energy (688303) up 4.23%, and Tongwei Co., Ltd. (600438) up 2.30% [1] - The carbon neutrality ETF fund (159885) has also increased by 0.35%, marking its fourth consecutive rise, with the latest price reported at 0.58 yuan [1] - The approval of the 400MW Phase II wind power project by China Energy Construction in Jixi, Heilongjiang Province, is expected to provide approximately 1 billion kWh of clean electricity annually, saving about 330,000 tons of standard coal and reducing carbon dioxide emissions by approximately 760,000 tons [1] Group 2 - Guojin Securities is optimistic about the global wind power installation maintaining a high level in 2026, supported by strong domestic demand, with an increase of 19% year-on-year in domestic wind power installations from January to April 2025, totaling about 20GW [2] - The offshore wind project scale has exceeded 9GW, with expectations of 100GW for onshore wind installations and 10GW for offshore wind installations in 2025 [2] - The carbon neutrality ETF fund closely tracks the China Securities Low-Carbon Economy Theme Index, which includes companies involved in clean energy generation, energy conversion and storage, clean production and consumption, and waste treatment [2] Group 3 - As of April 30, 2025, the top ten weighted stocks in the China Securities Low-Carbon Economy Theme Index include Yangtze Power (600900), CATL (300750), Longi Green Energy (601012), and others, collectively accounting for 62.79% of the index [3]
探秘压缩空气储能电站:解锁能源存储“新密码”
Xin Hua She· 2025-06-25 10:19
Core Viewpoint - The article highlights the innovative significance and unique charm of the "Energy Storage No. 1" project, a 350 MW compressed air energy storage demonstration power station built by China Energy Construction Group in Tai'an, Shandong, showcasing advancements in energy storage technology and its role in stabilizing the power grid [1][2]. Group 1: Project Overview - The "Energy Storage No. 1" project features a 350 MW salt cavern-based compressed air energy storage system, designed for 8 hours of charging and 4 hours of discharging, with a potential extension to 6 hours, capable of generating an annual output of 460 million kWh, sufficient for over 200,000 households [1][2]. - The project employs an integrated model of research, investment, construction, and operation, emphasizing modern efficiency and scientific planning across its extensive site [1]. Group 2: Technical Insights - The project utilizes abandoned underground salt caverns as gas storage, where excess electricity during low demand compresses air into high-pressure states, which is later released during peak demand to generate electricity [2]. - The core technology involves storing heat generated during the compression process in thermal storage tanks, enhancing the efficiency of energy conversion and grid stability [2]. Group 3: Recognition and Impact - The project has been recognized as a new type of energy storage demonstration project in Shandong Province for 2023 and included in the major project lists for 2024, indicating its significance in the region's energy transition and industrial upgrades [3].
0.37~0.58元/Wh!中能建25GWh锂电储能系统集采开标
鑫椤储能· 2025-06-25 09:09
Core Viewpoint - The article discusses the results of the centralized procurement project for lithium iron phosphate battery energy storage systems by China Energy Construction, highlighting the total estimated procurement volume of 25 GWh and the competitive bidding process across three packages [1][2]. Summary by Sections Package 1: 1-hour System - Total scale of 3 GW/3 GWh with 16 valid bids - Bidding price range from 0.673 CNY/Wh to 0.89 CNY/Wh, with an average bid of 0.786 CNY/Wh [1]. Package 2: 2-hour System - Total scale of 6 GW/12 GWh with 64 valid bids - Bidding price range from 0.416 CNY/Wh to 0.5764 CNY/Wh, with an average bid of 0.4646 CNY/Wh - Ten companies ranked first with bids ranging from 0.428 CNY/Wh to 0.44 CNY/Wh [1]. Package 3: 4-hour System - Total scale of 2.5 GW/10 GWh with 60 valid bids - Bidding price range from 0.37 CNY/Wh to 0.495 CNY/Wh, with an average bid of 0.4249 CNY/Wh - Six companies ranked first with bids ranging from 0.3922 CNY/Wh to 0.401 CNY/Wh [2].
全球单机最大压缩空气储能项目冲刺并网
Sou Hu Cai Jing· 2025-06-25 04:12
Core Viewpoint - The development of long-duration energy storage technologies, particularly compressed air energy storage (CAES), is crucial for building a new power system, with the "Energy Storage No. 1" project in Shandong being a significant focus due to its innovative non-combustion technology and large scale [1][3]. Group 1: Project Overview - The "Energy Storage No. 1" project, led by China Energy Engineering Group, features a 350 MW CAES system, which is the largest single-unit capacity globally and aims to achieve full capacity grid connection by the end of 2025 [1][5]. - The project utilizes the abundant underground salt cavern resources in Tai'an, transforming them into a giant "energy bank" that stores excess electricity during low demand periods and releases it during peak demand [2][4]. Group 2: Technological Innovations - The project has achieved a breakthrough in "non-combustion" operation, eliminating the need for fossil fuels to heat the compressed air, thus achieving zero carbon emissions and pollution [3]. - The system's design allows for the recovery of heat generated during compression, which is used to enhance the efficiency of energy conversion, further contributing to its environmental benefits [3]. Group 3: Economic and Strategic Implications - The choice of a 350 MW scale is strategic, as it allows for significant contributions to regional grid stability and reduces unit investment costs, enhancing energy conversion efficiency [4]. - The project is seen as a model for activating idle resources and promoting local development, with the potential to utilize over 90% of China's rich salt cavern resources for energy transformation [4]. Group 4: Future Prospects - The project is progressing well, having completed key construction and installation milestones, with a focus on ensuring operational readiness for the planned grid connection [5]. - China Energy Engineering Group aims to leverage its technological and industrial advantages to establish itself as a leader in the global CAES market, contributing to national energy security and the achievement of carbon neutrality goals [5].
4h储能报价0.37元/Wh!中国能建2025储能系统集采开标
Core Viewpoint - The article discusses the results of the centralized procurement project for lithium iron phosphate battery energy storage systems by China Energy Construction for the year 2025, highlighting the competitive bidding process and pricing trends in the industry [1][12]. Group 1: Procurement Overview - The total estimated procurement volume is 25 GWh, with participation from over 70 companies [1]. - The procurement is divided into three packages, each with different specifications and capacities [1]. Group 2: Package Details - **Package 1**: 1C (1-hour system) with a total scale of 3 GWh, received 16 valid bids with an average price of 0.786 yuan/Wh, ranging from 0.673 to 0.89 yuan/Wh [1][2]. - **Package 2**: 0.5C (2-hour system) with a total scale of 6 GWh, received 64 valid bids with an average price of 0.465 yuan/Wh, ranging from 0.416 to 0.5764 yuan/Wh [3][4]. - **Package 3**: 0.25C (4-hour system) with a total scale of 2.5 GWh, received 60 valid bids with an average price of 0.425 yuan/Wh, ranging from 0.37 to 0.495 yuan/Wh [7][8]. Group 3: Bidder Requirements - For **Package 1**, bidders must have a cumulative contract performance of no less than 100 MWh for 1C systems in the last two years [11]. - For **Package 2**, bidders must have a cumulative contract performance of no less than 1000 MWh for 0.5C systems in the last two years [11]. - For **Package 3**, bidders must have a cumulative contract performance of no less than 500 MWh for 0.25C systems in the last two years [11].